Loading...
Winslow Hotel PLN50880 SPR CUP NO. DOCUMENT DESCRIPTION DATE  1 Staff Report 01/16/2020  2 Hotel Master Land Use Application (Revised) 04/25/2019  3 Affidavit of public notice 01/16/2020  4 Certificates of Posting 02/12/2019 04/27/2019 10/30/2019 11/05/2019  5 SPR/CUP Survey 4/25/2019  6 Vicinity Map Building Footprints 4/25/2019  7 Site Plan Set including: Landscape Plan, Parking Level P2 Plan, Parking Level P1 Plan, Main Floor Plan, Mezzanine Plan Set, Second Floor Plan, Third Floor Plan, Elevations, Elevations, Courtyard Elevations, East/West Section, Perspectives, Figure Ground Drawing, Street Cross Section & West Property Photo 1/14/2020  8 Tree Retention and Landscaping 12/27/2018  9 Lighting Plan No Date  10 Revised Parking and Valet Stacking 01/14/2020  11 Walker Consultants parking Study 03/24/2018  12 Winslow Hotel Traffic Impact Analysis 04/24/2019  13 Revised Parking Calculations No date  14 Certificate of Concurrency 06/06/2019  15 Certificate of Concurrency (including attached Traffic Impact Analysis, June 17 email from Greg Heath with additional summer counts) 12/09/2019  16 Public Works Development Engineer Comments 07/05/2019  17 Water Sewer Availability Request REVISED 09/09/2019  18 Nonbinding water sewer availability letter 06/07/2019  19 Acoustical Engineer Correspondence 04/20/2019  20 Design Guideline Checklist No date  21 Design Review Board Findings and Recommendations 12/17/2018 06/03/2019   22 Multimodal Transportation Advisory Committee Minutes 04/17/2019  23 SEPA Checklist 04/26/2019  24 DRB Letter to Planning Commission 06/18/2019  25 PC Recorded Motion with Findings of Facts and Conclusions 07/25/2019  26 Winslow Master Plan Analysis Memo to Planning Commission 06/11/2019  27 Health District Comment 01/02/2019  28 Tree Report 11/23/2018  29 Arborist Report 12/27/2018  30 SEPA Mitigated Determination of Nonsignificance 11/25/2019  31 Letter – Bainbridge Island Disposal 12/05/2019  32 Winslow Hotel Project Parking Analysis Update 09/13/2019  33 Public Comment for Comment Period_February 8 to 22 02/08/2019 to 02/22/2019  34 Public Comment for REVISED Comment Period_April 26 to May10 04/26/2019 to 05/10/2019  35 Public Comment for Comment Period_November 1 to15 11/01/2019 to 11/15/2019  36 Public Comment Received at Planning Commission Meeting 06/13/2019  37 Public Comment Received Outside of Comment Periods Various