Clark Construction LLC_Police and Municipal Court Building_Contract 2022066_Change Order 6S- W 314 Routing Cover Sheet 1, General Information Originating Department public Works Division: Engineering Document/Project Name: Change Order #6 Department Contact: C.Wierzbicki/KM Ext Document Type DILA/MOU ElContract/Agreement DAmendment Z Change Order El Other Notes: Change Order #6 - Police and Court Facility DEPARTMENT INITIAL REVIEW AND ROUTING (For City Manager -Approved Contracts) Dept. Manager/Supervisor. Date: PW Admin: Dept Director. Date: Date: (� 1 l EXECUTIVE Executive Admin: Date: City Attorney. 1 Date: 31 C, % Z ?, CITY CLERK (For City Council — Approved Contracts) Meeting Date: City Cleric Contract Inventory: DEPARTMENT BUDGET INFO: Current Budget: $ 21,420,000.00 Contract/Expenditure Amount: $ 20,462,463.80 Amount Remaining: $ 957,536.20 PW GRANT INFO: State Grant? YES: FINO: ❑✓ Date Authorized by WSDOT/FWHA: Federal Grant? YES: ❑NO: Date Authorized by WSDOT/FWHA: Revised: November 27, 2019 support this change order. Item No. CE 109-2 CE 123 CF. 136 CE 138 CE 140 CE 142 CE 147 CE 150 CE 155 CE 157 CE 165 CE 167 CE 25-3 Chance Order Police and Municipal Court Facility City of Bainbridge Island Public Works Department 280 Madison Ave. N Bainbridge Island, WA 98110 206.842.2016 Fax. 206.780.3710 nwadmin a.bainbrideewa.eov For City Use CONTRACTOR: Vendor ID 6919 Clark Construction, LLC Contract No. 2022066 P.O. Box 10625 Project No. 00724 Bainbridge, Island, WA 98110 Org/Obj. Org/Obj. PO # if applicable. The contract is hereby revised as shown below and on any applicable attached detail, sheet, and work directives used to Description _ _ _ _ _ Total Transition at Ceiling and Window - Corridor 202 Existing Low Volt Raceways Window Shadmv Box Details Fire Annunciator Location NW Exterior Camera _ Electric for Art AS[008 EOC _ Card Reader at South Auto Gate N WP_- Delayed Completion - Union Labor Rate Increase Dimensional/COBI IT meeting reconunended changes Frame & Finish around ductwork at door 202 Trellis Removal Change Order No. 6 Date 7/19/23 ASI-003 - ASI-004 - ASI-005 - ASI-006 - Plan Changes -Field Directive 06 *Use number references in Change Orders only, ex. WCDI2 Contractors Acceptance: Prepared/Approved By: Approved By: Original Contract Amount: Previous Change Order(s) Total: Current Contract Amount: Net Change this Change Order: New Contract Amount: Amount Sates Tax $ 6,939,000.00 631.449.00 $ 942.558.25 93.654.39 $ 7,881,558.25 725,103.39 $ 231.564.83 21,303,96 S 8,113,123.08 746,407.35 5,683.22 _4,931.06 2,994.72 2,210.99 1,291.14 5,261.19 4,576.00 2,838,52 15 198,08 19,704.79 3.184.08 2,019.07 161,311.97 Total CIO: 231,564.83 Total w/ Tax 7,570,449.00 1,036,212.64 8,6069661.64 252,868.79 8,859,530.43' Christopher Dykeman/Project Manager 07/19/2023 Signat ri a Na a/Title Oate Chris Wic¢bicki it clot ublic Works Date Blair King - City Manager Date MCLARK PCO #109-2 CONSTRUCTION CCI / Clark Construction Inc. Project: 2209 - COBI Police & Municipal Court Bldg 901 Hildebrand Lane NE 8804 Madison Avenue North Bainbridge Island, Washington 98110 Bainbridge Island, Washington Phone: (206) 842-5450 Fax: (206) 842-3895 Prime Contract Potential Change Order #109-2: CE #109 - RFI #117: Transition at Ceiling and Window - Corridor 202 TO: City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBER/REVISION: 109-2 / 0 CONTRACT: 1 - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED BY: Marty Telschow (Clark Construction, Inc.) STATUS: Approved CREATED DATE: 6/2/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $5,683.22 POTENTIAL CHANGE ORDER TITLE: CE #109 - RFI #117: Transition at Ceiling and Window - Corridor 202 CHANGE REASON: Existing Condition POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract /s Changed As Follows) CE #109 - RFI#117:_ Transition at Celling and Window- Corridor 202 Costs per RFI response #117 City has decided to move the mechanical and box out. Pinchiff - ROM $2500 NWP - Quote attached Approved via Email from Chris Weabicki 6/13/23 ATTACHMENTS: COBI - Police - COR-2410-021 - Frame and Finish Skirtwall at Corridow 202 Wndow.odf , RFI 117 Transition at Ceiling and Window - Corridor 202 - Coates response odf # Budget Code Description Amount 1 09-050.0 Drywall.Other NWP -Ceiling adjustments $1,934.00 2 15-050.0 Plumbing.Other Pinchiff - Ductwork changes $2,500.00 3 01-790.0 Supervision - interior.Other $500.00 4 01-810.0 Project management.0ther $260.00 5 50-400.0 WSHA.Other $103.88 6 50-200.0 CGL.OIher $48.74 7 50-300.0 B&O taxes.Olher $32.08 8 50-500.0 SOND.Other $33.89 CCI / Clark Construction Inc. Page 1 of 2 Printed On: 7/14/2023 02:39 PM M CLARK CONSTRUCTION PCO #109-2 # Budget Code Description Amount 9 50-100.O Fee,Other $270.63 Grand Total: $5,683.22 Matthew Coates (Coates Design Architects) 710 Jahn Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE CCI / Clark Construction Inc. City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE SIGNATURE DATE Page 2 of 2 Printed On: 7/14/2023 02:39 PM A R CCI I Clark Construction Inc. Project: 2209 COBI Police & Municipal Court Bldg Lane NE 80Madison Avenue North and \® C I `�' ` ' ` K BainbridgerIsland, Washington 98110 Bainbri ge Island, Washington P:(206) 842-5450 F:(206) 842-3895 RFI #117: Transition at Ceiling and Window - Corridor 202 Status To Date Initiated Location Cost Impact Spec Section Drawing Number Linked Drawings Received From Copies To Activity Question Open David Swenson (Coates Design Architects) From Apr 11, 2023 Due Date Level Project Stage TBD Schedule Impact Cost Code Reference Brian Kehler (Northwest Partitions, Inc.) Jim Williams (Clark Construction, Inc.) Apr 18, 2023 Course of Construction TBD Cindy Alvira (Clark Construction, Inc.), Shannon Campbell (Clark Construction, Inc.), Matthew Coates (Coates Design Architects) , Peter Corelis (City of Bainbridge Island), Chris Oykeman (Clark Construction, Inc.), Adam Gardner (Clark Construction, Inc.), Michael Romero (Paramelrix), Marty Telschow (Clark Construction, Inc.), Katrin Tomas (Coates Design Architects), Chris Werzbicki (City of Bainbridge Island), Jim Williams (Clark Construction, Inc.) Question from Jim Williams Clark Construction, Inc. on Tuesday, Apr 11, 2023 at 10:18 AM PDT Please see attached RFI and photos regarding the clerestory windows and ceiling conflict at Corridor 202. Attachments ff7a4d3b98fOf8175f58396a5cdbe3f0a72e_3913883031_lhumbnail_large_production.png, RFI 025-Transition Detail at Ceiling & Wndow.pdf Remove short (approx12") section of duct. Move HVAC unit to south, reconnect duct. Adjust multiple elbows are west end to accommodate the move. Hold GWB ceiling back from windows and provide a GWB skirlwall (5/8" GWB on 2-1/2' studs) from 9'-0" GWB ceiling to wood decking above. Install as close too relocated HVAC unit as possible. See photo and RCP markups on following 2 pages. David Swenson / Coates Design 5/3/23 CC] / Clark Construction Inc. Page 1 of 1 Printed On: Apr 11, 2023 10:18 AM PDT I I I I� ('(EE ^j I �, I \ I \ LAR DUCTWORK, CH , TYP NkA, P I ^GWB SKIRTWALL FROM K-0" TO WOOD DECK I(H ) �ABOVE, 2-1/2"{{STUDS { OPEN TO WOOD ( JJ) j STRUCTURAL DECKING ABOVE ECUIRITY 2 B KK) i \ H� i S 1 210 1 OPEN90 STRUCT \ABV (E)NDI E / LANDING 201 �♦ �HVAC DUCT CEILING \N \\ 44t' /o WAITING 201 RCP - RFI-117 Coates Design RFI-117 s1-0° FROM WINDOW 9'-0" CEILING TO WOOD DECKING ABOVE REMOVE 12" SECTION OF DUCT, MOVE ASSEMBLY AWAY FROMWINDOW AND Coates Design W'�' RFI-117 0 NORTHWEST PARTITIONS To: Clark Construction Contact: Chris Dykeman Description: Add SkInwall At Corridor 202 Window Page 1 of 1 REQUEST FOR CHANGE ORDER Ref.# COR-2410-021 External/RCO# GC Ref# Date Apr 25, 2023 Job # 2410 Project: Bainbridge Island Municipal Court 8r Police Station 8804 Madison Ave North Bainbridge Island, WA 98110 Labor Quantity UOM Unit Total Rate Total Foreman Time 1.00 Hrs 1.00 8T92 $87.92 Frame Interior 7,00 Hrs 7.00 82.78 $579,46 Finish Tape 8.00 Hrs 8.00 81.21 $649.68 Clean 1.00 Hrs 1.00 82.78 $82.78 Stock 0.25 Hrs 0.25 82.78 $20.70 Total Labor $1,420.54 Material Size Quantity UOM Unit Price Total Material - Steel EACH 1.00 EA 98.64 EA $98.64 Material -Taping EACH 1.00 EA 47,13 EA $47. 13 Material -Misc. EACH 1.00 EA 23,63 EA $23.63 Total Material $169.40 Total Miscellaneous Charges Total Insurance 1.5% $23,85 Union Travel Pay $68.80 Total Miscellaneous Charges $92.65 Notes: Furnish and install a GWB skirtwall using 2-1/2" framing from wood deck above to 9' GWB ceiling at Corridor 202 window and finish taping with cornerbead at the return. There will be approx 16" from the finished face of our GWB ceiling drop to the framing above the window. AUTHORIZED BY: ON BEHALF OF: Clark Construction PROJECT MANAGER: Brian Kahler ESTIMATOR: Brian Kahler Labor Total: $1,420.54 Material Total: $169.40 Misc. Total: $92.65 Sub Total: $1,682.59 Mark Up: $251.41 Total: $1,934.00 20006 - 1441h Aeenue NP_ Woodmvdlc. WA 98072 Run on. May 8, 2023 1:37 PM '1 425-375-2500 P' 425-375-2540 hup //avNk'. nopart coin 00 <1 on,ninnu.rn' f 9'-0" TO WOOD DECK --ABOVE, 2.112" STUDS OPEN TO WOOD STRUCTURAL OECKING ABOVE ITING 201 RCP - RFI-11 Coates Design RFI-117 CLARK �\ CONSTRUCTION CCI / Clark Construction Inc. 901 Hildebrand Lane NE PCO #123 Project: 2209 - COBI Police & Municipal Court Bldg 8804 Madison Avenue North Bainbridge Island, Washington 98110 Bainbridge Island, Washington Phone:(206) 842-5450 Fax:(206) 842-3895 Prime Contract Potential Change Order #123: CE #123 - RFI #135: Existing Low Volt Raceways TO: City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBER/REVISION: 123 / 0 CONTRACT: 1 - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED BY: Marty Telschow (Clark Construction, Inc.) STATUS: Approved CREATED DATE: 6/2/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $4, 931.06 POTENTIAL CHANGE ORDER TITLE: CE #123 - RFI #135: Existing Low Volt Raceways CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #123 - RFI #135' Existing Low Volt Raceways Enclosing existing low volt raceways per RFI 135. • NWP costs • Coordination & Management Includes notice about union rate changes. Approved via email from Chris Weubicki 6-13-23 ATTACHMENTS: 09 - FRAMING ACT - NWP Wage Rates Bainbridge odf , COBI Police - COR-2410.025 - RFI 135 Enclose Conduit at Room 102 odi # Budget Code Description Amount 1 09-050.0 Drywall.Other enclose them in a 6" metal stud wall with GWB to above ceiling. Extend wall to north, partition Type 25, $3,415.00 2 02-900.0 CCI Demolition Labor.Other Demo of existing raceways $351.60 3 01-810.0 Project management.Other Management & Processing $240.00 4 01-790.0 Supervision - inlerior.Other Onsite Supervision & QA/QC $500.00 5 50-400.0 WISHA.Other WISHA $90.13 6 50-200.0 CGL.Other CGL $4229 7 50-300.0 B&O taxes.Olher B&O $27.83 8 50-560.0 BOND.Other BOND $29.40 9 50-100.0 Fee.Other Fee $234.81 CCI / Clark Construction Inc. Page 1 of 2 Printed On: 7/17/2023 10:10 AM MCLARK CONS (RUCTION Matthew Coates (Coates Design Architects) 710 John Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE CCI / Clark Construction Inc. City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 PCO #123 Grand Total: $4,931.06 Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE SIGNATURE DATE Page 2 of 2 Printed On: 7/17/2023 10:10 AM NORTHWEST PARTITIONS To: Clark Construction Contact: Chris Dykeman Description: RFI 135 - Enclose Conduits at Room 102 Page 1 of 1 REQUEST FOR CHANGE ORDER Ref.# COR-2410.025 External/RCO# GC Ref# Date May 24, 2023 Job # 2410 Project: Bainbridge Island Municipal Court & Police Station 8804 Madison Ave North Bainbridge Island, WA 98110 Labor Quantity UOM Unit Total Rate Total Foreman Time 2.00 Hrs 2.00 93.76 $187.52 Frame Interior 5.00 Hrs 5.00 88.23 $441.15 Hang Interior GWB 3.00 Hrs 3.00 88.95 $266.85 Finish Tape 4.00 Hrs 4.00 85.84 $343.36 Fire Tape 1.00 Ws 1.00 85.84 $85.84 Clean 3.00 Hrs 3.00 88,23 $264.69 Stock DNV- Onsite 1.00 Hrs 1.00 88.23 $88.23 Total Labor $1,677.64 Material Size Quantity UOM Unit Price Total Material - Steel EACH 1.00 EA 548,88 EA $548.88 Material - Drywall EACH 1,00 EA 162.00 EA $162.00 Material - Taping EACH 1.00 EA 21.88 EA $21.88 Consumables/Supplies EACH 1.00 EA 16. 19 EA $16.19 FREIGHT CHARGE EA 1.00 EA 500.00 EA $500.00 Total Material $1,248.95 Total Miscellaneous Charges Total Insurance 1.5% _ _ $43.90 Total Miscellaneous Charges $43.90 Notes: Work is per RFI 135. Enclose conduits at Room 102 with 5-1/2" metal framing and GWB to above ceiling. Labor Total: $1,677.64 AUTHORIZED BY: Material Total: $1,248.95 ON BEHALF OF: Clark Construction Misc. Total: $43.90 PROJECT MANAGER: Brian Kohler Sub Total: $2,970.49 Mark Up: $444.51 ESTIMATOR: Brian Kehler Total: $3,415.00 20005- 144th Avenue NE. W'oodinv illy- WA 98072 Run on: May 24. 2023 11:47 AM 'I42i-37i-3ie11 F 425-3752540 hap./A�A"c m,pan corn Status Open To Onto Swenson(Coalea Design Architects) From Mark She" (Synergy Elecbical Contracting, LLCJ Dale Initiated May 3. 2023 Due Data May 10. 2023 Location Level) Project Stage Coal hoped TED Schedule Impact TED Spec Section Cost Code Drawing Number Reference AllaNeE picture Linked Drawings Received From Mark Shamp(Synergy Electrical Contracting, LLC.) Captive To Cindy AMra(Clark Construction.Inc.), Shannon Campbell(Clark Cans Wclion,Inc).M.Ways, Caates(Cases Design Amilabs) . Peter Consul. (City Of BairbrWge hiland). Chris Dyaaman (Clark Construction. Inc.). Adam Garaner (Clark Construction, Inc.), Michael Romem (Parametrix), Marty Telschow (Clark Corroborator, Inc.). Kauin Tomas (Coates Design A ci (tech). Chas Wlembldd (City of Bamordge Island). Jim Williams (Clark Construction. Inc) Activity Question Question from Mark Shamp Synergy Electrical Contretling.LLC. on Thursday, Apr 22. 2023 at 0239 PM PDT ExlshN underground raceways in reception roan 102 (see attachment) supply low volt security, fre, and connote in walitale 100, There's (8) 314' rani a at that need to be rerouted to another wall. Please adNae Attachments 48003CE35CFSd 1869D3E-8Ce4AE1290E8)peg Retain these conduits and enclose (ham in a 6' maul stud wall with OWB to above ceiling. Extend wall to team, parldflon Type 25. Devices in the existing wall are to be demo'd per ED2.01 & TD2.01. Set new devices E2.01 and T2.01 in new wall David Swenson I Coates Design >i 5R3123 % 14' OIvRCES IN /e TYPE25PARTTON 'ATOR /ENCLOSED CONDUITS90141 J` IN 6'aNO PARTITION RECEPTION 002 CC) I Clark Continuator Inc. Page l oft Printed On: May 3. 202309:40 AM PDT _ E ui N � Y L n N 14 v o W ? ~ m N W N E - s u_ a _ � U n w � � r u m T = - 3 N E N � N N N n N N N m N MCLARK CONSTRUCTION PCO #136 CCI / Clark Construction Inc. Project: 2209 - COBI Police & Municipal Court Bldg 901 Hildebrand Lane NE 8804 Madison Avenue North Bainbridge Island, Washington 98110 Bainbridge Island, Washington Phone: (206) 842-5450 Fax: (206) 842-3895 Prime Contract Potential Change Order #136: CE #136 - RFI #142: Window Shadow Box Details TO: City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBER/REVISION: 136 / 0 CONTRACT: 1 - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED SY: Marty Telschow(Clark Construction, Inc.) STATUS: Approved CREATED DATE: 6/2/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $2,994.72 POTENTIAL CHANGE ORDER TITLE: CE #136 - RFI #142: Window Shadow Box Details CHANGE REASON: Owner/Architect POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #136 - RFI#142: Wiindow Shadow Box Details It was recommended in the OAC that painting the glass would not be a wise process for maintenance in the future. Alternate option were requested CCI Labor & Painting - No change - Savings for paint was covered by sizing and installing the panels. Blue sky material cost attached. Approved via email from Chris Wierzbicki 6-14-23 ATTACHMENTS: 23-0079 COBI Shadowbox Laminated Plywood 1 Additional Panel 6 13 23 odf , 23-0068 COB[ 141 Weapons Counter & Laminated Plywood odf # Budget Code Description Amount 1 06-050.0 Framing.Other 4' x 8' of 3/4" plywood covered with laminate $2,034.27 2 06-050.0 Framing,Other 4' x 8' of 3/4" plywood covered with laminate $334.67 3 01-810.0 Project management.Other Management & processing $130.00 4 50-400.0 WISHA.Other WISHA $49.98 5 50-200.0 CGL.Other CGL $23.45 6 50-300.0 B&O taxes.Other B&O $15.43 7 50-500.0 BOND.Other BOND $16.30 8 50-100.0 Fee.Other Fee 15% $390.62 Grand Total: $2,994.72 CCI / Clark Construction Inc. Page 1 of 2 Printed On: 7/17/2023 10:16 AM CLARK �\ CONSTRUCTION Matthew Coates (Coates Design Architects) 710 John Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 DATE SIGNATURE DATE PCO #136 Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE CCI / Clark Construction Inc. Page 2 of 2 Printed On: 7117/2023 10:16 AM Blue Sky Woodworks, Inc. Quotation 26285 Twelve Trees Lane NW Suite 101 Poulsbo, WA 98370 Quote Date. 6/25/2023 206-842-6472 Quote ID: 23-0068Est e/'11�1xamcAtf Fax:206-842-5001 www.blueskywood.com Sales Representative: David Cox Quote To: Clark Construction Ship To: Bainbridge Island Police & Municipal Court 355 Ericksen Ave. NE 8804 Madison Ave N. Bainbridge Island, WA 98110 Bainbridge Island, WA 98110 United States United States Contact: Shannon Campbell/Chris Dykeman Phone: 206.842.5450 Ext 761 E-Mail: shannon@clarkconstruct.com Customer Reference Lead Time Desired Ship Dale Ovole Expiration Dale COBI Police & Munic. Court-241 Weapons Counter 7124/2023 Terms Tax Status FOB Paint Ship Via Preferred Carrier Freight Exempt Best Way Billed Ins Quanti Part- Descr' tion UM Lid Unit Price Extension Time 1 1.0000 COBI.241 Weapons Counter/Shelf Ea 8,743.1108 $8,743.11 Price Includes installation. 2 1.0000 COBI Laminated Sheets for Window Shadow Ea 2,034.2718 $2,034.27 Boxes Line Item Sub Total: $10,777.38 Service Charge Total: $0.00 Total Before Tax: $10,777.38 Quoted by: x Accepted by x (Auegreed agent of Blue Sky Waadwa,ks Inc.) (Aolhonzed agent of Clark Construction) 5/25/2023 1:37:57PM 1 _,>-���?`T��• Blue Sky Woodworks, Inc. 26285 Twelve Trees Lane NW - '$ Suite 101 Poulsbo, WA 98370 a 206-842-6472 .t/lirfxwnW�e` Fax: 206-842-5001 www.bluesky,wood.co Quote To: Clark Construction 355 Ericksen Ave. NE Bainbridge Island, WA 98110 United States Contact: Cindy Alvira Phone: 206.842.5450 Ext 677 E-Mail: cindy@clarkconstruct.com Customer Reference Lead Time COB] Additional Laminated Plywood Terms Tax Status FOB Point Not Exempt Line Quantit Part - Descri lion 1 1.0000 COBI Laminated Plywood Sheet for Window Shadowbox Quotation Quote Date: 6114/2023 Quote ID: 23.0079Est Sales Representative: David Cox Ship To: Bainbridge Island Police & Municipal Court 8804 Madison Ave N. Bainbridge Island, WA 98110 United Stales Desired Ship Date Quote Expiration Date 6/14/2023 Ship via Preferred Carrier Freight Billed UM Lead Unit Price Extension Time Ea 334,6739 $334.67 Quoted by: x Accepted by: x (ANhOrlxed agent of Blue Sky Woodworks, Ine) (Authorized agent Ot Clark COnsVVOdom 6/14/2023 8:14:29AM Line Item Sub Total: $334.67 Service Charge Total: $0.00 Total Before Tax: $334.67 I MCLARK CONSTRUCTION CCI / Clark Construction Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Phone: (206) 842-5450 Fax:(206) 842-3895 PCO #138 Project: 2209 - COBI Police & Municipal Court Bldg 8804 Madison Avenue North Bainbridge Island, Washington Prime Contract Potential Change Order #138: CE #138 -RFI #144: Fire Annunciator location TO: City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBER/REVISION: 138 / 0 CONTRACT: 1 - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED BY: Marty Telschow (Clark Construction, Inc.) STATUS: Approved CREATED DATE: 6/2/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $2,210.99 POTENTIAL CHANGE ORDER TITLE: CE #138- RFI #144: Fire Annunciator location CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract /s Changed As Follows) CE #1311- RFI #144� Fire Annunciator location Per FRI #144 - relocate the Fire Annunciator on the southwest wall of Vestibule 100. Description: Previous installation location was at a floor -to -ceiling glass window. Relocating to suitable location. Work Includes: Moving installation location from West wall of Vestibule 100 to the Southwest wall of Vestibule 100, to left of Door 101A. Rerouting of conduit. Approved Via Email from Chris Wierzbicki 7-11-23 ATTACHMENTS: # Budget Code Description Amount 1 16-050.0 Electrical rough in and trim o.Other Fire Annunciator relocation $1,640.67 2 01-790.0 Supervision - interior.Other Onsite coordination & QA/Qc $250.00 3 01-810.0 Project management.Other Management & Processing $130.00 4 50-400.0 WSHA.Other WSHA $40.41 5 50-200.0 CGL.Other CGL $18,96 6 50-300.0 B&O laxes.Other B&O $12.48 7 50-500.0 BOND.Other BOND $13.18 8 50-100.0 Fee.Other FEE $105,29 Grand Total: $2,210.99 CCI / Clark Construction Inc. Page 1 of 2 Printed On: 7/17/2023 10:27 AM ECLARK CONSTRUCTION Matthew Coates (Coates Design Architects) 710 John Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 SIGNATURE DATE PCO #138 Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE CCI / Clark Construction Inc. Page 2 of 2 Printed On: 7117/2023 10:27 AM ECLARK CONSTRUCTION PCO #140 CCI / Clark Construction Inc. Project: 2209 - COBI Police & Municipal Court Bldg 901 Hildebrand Lane NE 8804 Madison Avenue North Bainbridge Island, Washington 98110 Bainbridge Island, Washington Phone: (206) 842-5450 Fax: (206) 842-3895 Prime Contract Potential Change Order #140: CE #140 - RFI #146: NW Exterior Camera TO: PCO NUMBER/REVISION: REQUEST RECEIVED FROM: STATUS: REFERENCE: FIELD CHANGE: LOCATION: SCHEDULE IMPACT. I�:Ixrlrlld� City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 140 / 0 CONTRACT: 1 - City of Bainbridge Island Police and Municipal Court Facility Project. CREATED BY: Marty Telschow (Clark Construction, Inc.) Approved CREATED DATE: 6/2/2023 PRIME CONTRACT None CHANGE ORDER: No ACCOUNTING METHOD: Amount Based PAID IN FULL: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: POTENTIAL CHANGE ORDER TITLE: CE #140 - RFI #146: NW Exterior Camera CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract /s Changed As Follows) CE #140 - RFI #146: NW Exterior Camera • Per RFI 146 • Surface mounting conduit around wing -wall to weatherproof box for camera No Cost from Synergy for additional material and/or labor Painting of conduit and box to match siding. No $1,291.14 CCI - Jim/Cindy to paint exposed conduit& J-box to match siding color - 8 hrs + $50 for materials Approved via email from Chris Weabicki 7-6-23 ATTACHMENTS: # Budget Code Description Amount 1 01-790.0 Supervision - interior.Other Paint conduit & J-box to match siding color $1,050.00 2 01-810.0 Project management.Other Management .& processing $130.00 3 50-400.0 WISHA.OIher WISHA $23.60 4 50-200.0 CGL.Other CGL $11.07 5 50-300,0 B&O taxes.Other B&O $7.29 6 50-500.0 BOND.OIher BOND $7.70 7 50-100.0 Fee.Olher Fee 15% $61.48 Grand Total: $1,291.14 CCI / Clark Construction Inc. Page 1 of 2 Printed On: 7/17/2023 10:37 AM ECLARK CONSTRUCTION Matthew Coates (Coates Design Architects) 710 John Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 SIGNATURE DATE PCO #140 Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE CCI / Clark Construction Inc. Page 2 of 2 Printed On: 7/17/2023 10:37 AM MCLARK CONSTRUCTION CCI / Clark Construction Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Phone: (206) 842-5450 Fax:(206) 842-3895 PCO #142 Project: 2209 - COBI Police & Municipal Court Bldg 8804 Madison Avenue North Bainbridge Island, Washington Prime Contract Potential Change Order #142: CE #142 - Electric for Art TO: City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBERIREVISION: 142 / 0 CONTRACT: 1 - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED BY: Marty Telschow (Clark Construction, Inc.) STATUS: Approved CREATED DATE: 6/212023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $5,261.19 POTENTIAL CHANGE ORDER TITLE: CE #142- Electric for Art CHANGE REASON: Owner/Architect POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #142 - Electric for Art Per email from Chris W. electric is needed for Art Official details in asked In RFI #147 Electrical; 1. Description: 3 Parts 1. Add artwork power at East wall of Reception 102 2. Add artwork power under stair landing in Reception 102 3. Add power to exterior art on the North side of the building 2. Work Includes: 1. For power in Reception 102 at East wall, tapping into existing exit sign rough -in power. Adding receptacle/plate, and also lowering exit sign rough -in. 2. For power in Reception 102, under stair landing, tapping into wiring for receptacle on opposite side of wall from tiled wall. Adding receptacle/plate in tile wall. 3. For power to exterior art, tapping into power wiring at exterior wall of Deputy Chief Room 130, Routing buried conduit/power and stubbing up for the four artwork locations at removed trellises. Approved Via Email from Chris Wierzbicki 7-11-23 ATTACHMENTS: CO#18-CE#142-RFI#147 Electric for Artodf # Budget Code Description Amount 1 16-050.0 Electrical rough in and trim o.Olher Electric for Art $4,048.30 CCI / Clark Construction Inc. Page 1 of 2 Printed On: 7/17/2023 10:48 AM MCLARK CONSTRUCTION PCO #142 6 Budget Code Description Amount 2 01-790.0 Supervision - interior.Other Onsite coordination & QA/QC $500.00 3 01-810.0 Project menagement.Other Management & processing $260.00 4 50-400.0 WISHA.Other WISHA $96.17 5 50-200.0 CGL.Other CGL $45.12 6 50-300.0 B&O tazes.Olher B&O $29 70 7 5D-500.0 BOND.Other BOND $31.37 8 50-100,0 Fee.Other FEE $250.53 Grand Total: 95.261.19 Matthew Coates (Coates Design Architects) 710 John Nelson Lane NE Bainbridge Island, Washington 98110 City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE SIGNATURE DATE SIGNATURE CCI / Clark Construction Inc. Page 2 of 2 Printed On: 7/17/2023 10:48 AM synERGY ELECTRICAL COnTRACTInG P.O. Box 1544 Port Angeles, WA 98362 Email: synergyelectricalcontracting@gmail.com June 22, 2023 Clark Construction, INC 901 Hildebrand Lane Northeast Suite 200 Bainbridge Island, WA 98110 JOB: Bainbridge Police and Municipal Court C.O. #18 — CE#142-RFI#147: Electric for Art Description: 3 Parts 1) Add artwork power at East wall of Reception 102 2) Add artwork power under stair landing in Reception 102 3) Add power to exterior art on the North side of the building Work Includes: 1) For power in Reception 102 at East wall, tapping into existing exit sign rough -in power. Adding receptacle/plate, and also lowering exit sign rough -in. 2) For power in Reception 102, under stair landing, tapping into wiring for receptacle on opposite side of wall from tiled wall. Adding receptacle/plate in tile wall. 3) For power to exterior art, tapping into power wiring at exterior wall of Deputy Chief Room 130. Routing buried conduit/power and stubbing up for the four artwork locations at removed trellises. Material: MC wiring, metal cut -in box, receptacles/plates, 1" PVC conduit/fittings, THHN 10 AWG wire, 1" rigid metal conduit body and 1" rigid steel fittings. Labor: One electrician x24 hours. *Note: Lighting not included Total Price: $4,048.30 (not includine tax) Mark W. Shamp (Owner) Synergy Electrical Contracting, LLC. SYNERGY ELECTRICAL CONTRACTING, INC PROJECT NAME COBI Police Station & Municipal Court Facility PROJECT CHANGE ELECTRICAL# 142 Description: Electric for Art Major Materials: $ - Lighting $ Minor Materials $ 326.57 Switchgear $ Miscellaneous Materials: $ - UPS $ _ Consumables: $ 4.90 Generator $ - CartinglFreight: $ - ATS $ - Tax: Exem t $ - Firestopping $ - TOTAL MATERIAL: (A) $ 331.47 Items to consider Straight Premium reouired Direct Labor: 24.00 Firs. @ $101.49 $ 2,435.76 0 Hrs. @ $139.26 $ - Foreman Labor: 2.40 Hrs. @ $109.04 $ 261.70 0 Hrs. @ $149.99 S Supervisor Labor: 2.40 Hrs.@ $109.04 $ 261.70 0 Hrs.@ $149.99 $ - Drawing Review Labor: 0.60 His. @ $109.04 $ 65.42 0 His. @ $149.99 $ - Coordination Labor: 0.60 His. et $109.04 $ 65.42 0 His. @ $149.99 $ - Trash Cleanup: 0.26 His. @. $101.49 $ 26.79 0 His. fir $139.26 $ - Lost Productivity Labor: 0.00 Hrs..@ $101.49 $ - 0 Hrs. Fi $139.26 $ - Project Management: 0.60 Hrs @ $120.00 $ 72.00 0 His, 4i $180.00 $ TOTAL LABOR: (B) $ 3,188.79 Travel, (C) $ Acceptance Testing: (D) $ Coordination, Drafting, Engineering, Record drawings: (E) $ Special Equipment: Lift Rental/Rigging (F) $ Permits: (G) $ Sub -Total: $ 3,520.26 Overhead & Profit: 15.00% $ 528.04 Subcontractor Total: $ Bond: NO $ TOTAL: $ 4,048.30 $ Submitted Amount: $4,048J0 THIS PRICE FIRM FOR THIRTY (30) DAYS. Please note that a time extension of 0 days will be required to complete this work MCLARK CONSTRUCTION PCO #147 CCI / Clark Construction Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Phone: (206) 842-5450 Fax: (206) 842-3895 Project: 2209 - COBI Police & Municipal Court Bldg 8804 Madison Avenue North Bainbridge Island, Washington Prime Contract Potential Change Order #147: CE #147 - AS1008 EOC TO: City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBER/REVISION: 147 / 0 CONTRACT: 1 - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED BY: Marty Telschow (Clark Construction, Inc.) STATUS: Approved CREATED DATE: 6/2/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: S4,576.00 POTENTIAL CHANGE ORDER TITLE: CE#147-AS1008 EOC CHANGE REASON: Owner/Architect POTENTIAL CHANGE ORDER DESCRIPTION: (The Contractis Changed As Follows) CE #147 - AS1008 EOC Per email. Electrical changes are needed. Per OAC meeting 5/31/23 - TVs are to be on two different circuits Additional requests from email on 617/23. Per walk though Wth Jim and Chris W. Jim has directed Synergy to make these changes due drywall schedule. 1. Add data ports to the new TV locations in the EOC (north and west wall); 2. Run 3 data cables from EOC storage room to basement mechanical room; 3. Install a second 4" conduit from EOC storage to EOC; 4. Swap EOC storage outlet to generator circuit (can swap Wth EOC J box on generator circuit if needed); 5. Run all data cables serving EOC to the EOC storage room; 6. Run 4 data cables from EOC storage room to IT server room. To do this, Synergy has Identified the following scope and costs. Work Includes: In addition to ASI-008 ROM and costs, • Adding power and data for future TV monitor locations, x6 Three added to EOC Room 240 and three added to EOC Storage Room 227. One receptacle and one data port per location. Power brought to closest accessible location in the ceiling. Data in EMT conduit to the same location. Addition of 2nd 4" EMT conduit sleeve between the EOC Room 240 and EOC Storage Room 227. Approved via email from Chris Wieabicki 7-6-23 ATTACHMENTS: CO#14-CE#147 AS1008 EOC Addition odf , AS1008 NOTES on EOC odf , imaoe002.ioc , imace001 jpg CCI / Clark Construction Inc. Page 1 of 2 Printed On: 7/17/2023 10:62 AM CLARK �\ CONSTRUCTION PCO #147 # Budget Code Description Amount 1 16-050.0 Electrical rough in and trim o.Other Electrical costs $3,552.10 2 01-790.0 Supervision - interior.Other Onsite coordination & Supervision $500.00 3 01-810.0 Project management.Other Management & processing $130.00 4 50-400.0 WISHA.OIher WISHA $83.64 5 50-200.0 CGL.Other CGL $39.24 6 5D-300.0 B&O taxes.Other B&O $25.83 7 50-500.0 SON her BOND $27.28 8 50-100.0 Fee.Other Fee $217.91 Grand Total: $4,676.00 Matthew Coates (Coates Design Architects) 710 John Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 SIGNATURE Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE CCI / Clark Construction Inc. Page 2 of 2 Printed On: 7/17/2023 10:52 AM synERGY ELECTRICAL COnTRACTInG P.O. Box 1544 Port Angeles, WA 98362 Email: synergyelectricalcontracting@gmail.com June 19, 2023 Clark Construction, INC 901 Hildebrand Lane Northeast Suite 200 Bainbridge Island, WA 98110 JOB: Bainbridge Police and Municipal Court C.O. #14 — CE#147: Addition to ASI008 EOC Work Includes: In addition to ASI-008, adding power and data for future TV monitor locations, x6; Three added to EOC Room 240 and three added to EOC Storage Room 227. One receptacle and one data port per location. Power brought to closest accessible location in the ceiling. Data in EMT conduit to the same location. Also, addition of 2nd 4" EMT conduit sleeve between the EOC Room 240 and EOC Storage Room 227. Material: MC, data wiring, receptacles & plates, 4-square / 4-11/16 boxes + associated mudrings / extensions, spreader bars, 1"& 4" EMT conduit + bushings / supports. Labor: One electrician x 16 hours Total Price: $3,552.10 (not including tax) Mark W. Shamp (Owner) Synergy Electrical Contracting, LLC. SYNERGY ELECTRICAL CONTRACTING INC PROJECT NAME COBI Police Station & Municipal Court Facility PROJECT CHANGE ELECTRICAL# 147 Description: ASI008 EOC Major Materials: $ - Lighting $ _ Minor Materials: $ 1,150.00 Switchgear $ - Miscellaneous Materials: $ - UPS $ - Consumables: $ 17.25 Generator $ - Caning/Freight: $ - ATS $ - Tax: MA $ 72.95 Firestopping $ TOTAL MATERIAL: (A) $ 1,240.20 Items to consider Straight Premium required Direct Labor: 16.00 Hrs. $101.49 $ 1,623.84 0 Hrs. o $139.26 $ - Foreman Labor: 1.60 Hrs. q $109.04 $ 174.46 0 Hrs. a $149.99 $ - Supervisor Labor: L60 firs. r $109.04 $ 174.46 0 Hrs. a $149.99 $ - Drawing Review Labor: 0.40 Hrs. et $109.04 $ 43.62 0 Hrs. a $149.99 $ - Coordination Labor: 0.40 firs. is $109.04 $ 43.62 0 firs a $149.99 $ - Trash Cleanup: 0.18 Hrs. r $101.49 S 17.86 0 Hrs a $139.26 $ - Lost Productivity Labor: 0.00 Hrs cc $101.49 $ - 0 firs. a $139.26 $ - Project Management: 0.40 Hrs. �a S120.00 $ 48.00 0 Hrs, a $180.00 $ - TOTAL LABOR: (B) $ 2,125.86 Travel: (C) $ Acceptance Testing: (D) $ Coordination, Drafting, Engineering, Record drawings:. (F) $ _ Special Equipment: Lift Rental/Rigging (F) $ Permits: (G) $ Sub -Total: $ 3,366.07 Overhead & Profit 15.00% $ 186.03 Subcontractor Total: $ Bond: NO $ TOTAL: $ 3 552 10 Submitted Amount: $3,552.10 THIS PRICE FIRM FOR THIRTY (30) DAYS. Please note that a time extension of 0 days will be required to complete this work Additional power and data for additional Additional power and monitor data for additional monitor CR B LM- � RRIM UL-1I D5,+52" AI 213 � +52" TV I 2 --- D PA EOC S 406 2 �1 PT3 F240 -ITNESS = PT3 Q6O 4 PT3 O PA 4 1 l SRI OF zmi� © 3It 229 i 4 O a �AM:S,M - 3¢ PA PA J RY RR I AID LACT CC STORAGE R r C WING . C NGING JAN. RA1 i 228 I 227 225 P i Additional power and Additional power and data for additional data for additional monitor monitor Add 2nd 4" conduit CLARK PCO #150 �\ CONSTRUCTION CCI / Clark Construction Inc. Project: 2209 - COSI Police & Municipal Court Bldg 901 Hildebrand Lane NE 8804 Madison Avenue North Bainbridge Island, Washington 98110 Bainbridge Island, Washington Phone: (206) 842-5450 Fax: (206) 842-3895 Prime Contract Potential Change Order #150: CE #150 - RFI #150: Card Reader at South Auto Gate TO: City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBER/REVISION: 15010 CONTRACT: 1 - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED BY: Marty Telschow(Clark Construction, Inc,) STATUS: Approved CREATED DATE: 6/13/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $2,838.52 POTENTIAL CHANGE ORDER TITLE: CE #150- RFI #150: Card Reader at South Auto Gate CHANGE REASON: Owner/Architect POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #150 - RFI #150* Card Reader at South Auto Gate Per RFI #150 - relocating the card reader at south auto gate. Synergy No costs from Synergy - See attached. Liden • Cut and demo asphalt • Excavate & Backflll • Patch Asphalt Approved via email from Chris Werzbicki 7-6-23 ATTACHMENTS: CO#15- 1.PDF , COBI-Additional-Auto-Gate-CO pdt # Budget Code Description Amount 1 02-100.0 Site work.Olher Relocate card reader to the opposite side $1,959.19 2 01-790.0 Supervision - interior.Other Onsite coordination & QA/OC $375.00 3 01-810.0 Project management.Other Management & processing $260.00 4 50-400.0 WSHA,Other WISHA $51.88 5 50-200.0 CGL.Other CGL $24.34 6 5D-300.0 B&O taxes.Other B&O $16.02 CCI / Clark Construction Inc. Page 1 of 2 Printed On: 7/17/2023 11:03 AM MCLARK CONSTRUCTION PCO #150 # Budget Code Description Amount 7 50-500,0 BOND.Other IBOND $16.92 8 50-100.0 Fee.Other I Fee $135.17 Grand Total; $2,838.52 Matthew Coates (Coates Design Architects) 710 John Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 SIGNATURE DATE Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE CCI / Clark Construction Inc. Page 2 of 2 Printed On: 7/17/2023 11:03 AM synERGY ELECTRICAL conTRACTinG P.O. Box t544 Port Angeles, WA 98362 Email: synergyelect•icalcontracting@gmail.com June 19, 2023 Clark Construction, INC 901 H ildebrand Lane Northeast Suite 200 Bainbridge Island, WA 98110 JOB: Bainbridge Police and Municipal Court C.O. #15 — CE#150-RF19150: Card Reader at South Auto Gate Work Includes: Relocating card reader from passenger -side entrance to driver -side entrance. There is no cost associated. Total Price: $0.00 (not includinls tax) Mark W. Shamp (Owner) Synergy Electrical Contracting, LLC. LIDEN LAND D Phone (360) 394-0036 Fax (360) 394-0037 Mobile (360) 286-6129 Estimate Clark Construction LLC Date of Estimate : Terms Rachele Turnbull 6/11/2023 PO 410625 Due on receipt Bainbridge Island, WA 98110 Project/Job additional auto gate power Estimate # 2023.189 Item Description Oty Unit Unit Price Total Concrete Sawa... Concrete/Asphalt Saw daily rental rate. Diamond blade use is 1 DY 150.00 150.00 included. Cat 306 Exacay... Cat 306 Excavator. 3 HR 125.00 375.00 Prevailing Wag... Prevailing wage operator. price includes prevailing wage rate and 3 OR 72.44 217.32 fringe benefit, applicable payroll taxes, safety and welfare, general liability. No allowable markup included. Prevailing Wag... Prevailing Wage Laborer. price includes prevailing wage rate, fringe 4 HR 54.62 218.48 benefit. applicable payroll takes, safety and welfare, general liability. No allowable markup included. Disposal Disposal of demolished HMA debris off site I CY 31.00 31,00 3/4" crushed rock 3/4" Crushed rock 2 TN 18.50 37.00 Trucking Trucking Of Unsuitable Material Off Site For Disposal, Import 2.5 HR 120.00 300.00 crushed rock backfill Prevailing Wag... Solo Truck Driver Prevailing wage 2.5 HR 70.86 177.15 2" Asphalt Pavi... HMA for patch I TN 78.00 78.00 Asphalt Paving Asphalt raker prevailing wage labor 2 HR 59.85 119.70 Overhead Mark... 15%overhead markup of equipment, materials and labor rate totals as 255.54 allowed. EXCLUSIONS: Prices do not include. fencing, security, electrical or barriers, permits, bonds, sales tax, Subtotal $1 95y 19 layout, survey or staking, special inspections or compaction testing. Prices do not include tapping of water main or fees. contaminated material inspection, removal or disposal. No Sales Tax (0.0%) $0.00 overtime or night work. No work for other trades is included. Total $1,959.19 Submitted by Shawn A. Liden, President Liden Land Signature of Acceptance: Development & Excavation CLARK �\ CONSTRUCTION CCI / Clark Construction Inc. PCO #155 Project: 2209 - COBI Police & Municipal Court Bldg 901 Hildebrand Lane NE 8804 Madison Avenue North Bainbridge Island, Washington 98110 Bainbridge Island, Washington Phone:(206) 842-5450 Fax: (206) 842-3895 Prime Contract Potential Change Order #155: CE #155 - NWP - Delayed completion - Union Labor Rate Increase TO: City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBER/REVISION: 155 / 0 CONTRACT: 1 - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED BY: Marty Telschow(Clark Construction, Inc.) STATUS: Approved CREATED DATE: 6/8/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $15,498.08 POTENTIAL CHANGE ORDER TITLE: CE #155 - NWP - Delayed completion - Union Labor Rate Increase CHANGE REASON: Owner/Architect POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #155 - NWP - Delayed commotion - Union Labor Rate Increase Change order received from North West Partitions. This cost is associated with the delay to the project which has now moved into a union labor rate increase for carpenters on 6/1123 and tapers/finishers on 7/1123. Per the subcontract schedule, NWP was to be complete with our scope prior to the union labor rate increase. Approved via email from Chris Weabicki 6-14-23 6-26-23 - Noticed an error. The wrong total was entered for NWP. Revised and resent to Chris W. for approval. Approved via email from Chris Weabicki 6-26-23 ATTACHMENTS: NEW Union Wage Rates odf , OLD Union Wage Rates odf , COBI Police- COR-2410-024 - Delayed Comple8on Date Union Labor Rate Increase odf # Budget Code Description Amount 1 09-050.0 Drywall.Other Union Labor Rate Change $14,034.00 2 01-810.0 Project managemenLOBter Management & Processing $130.00 3 50-400.0 WSHA.Other WISHA $283.28 4 50-200.0 CGL.Other CGL $132.91 5 50-300.0 B&O taxes.Other B&O $87.48 6 50-500.0 BOND.Other BOND $92.41 7 50-100.0 Fee.Other Fee 5% $738.00 Grand Total: $15,498.08 CC[ / Clark Construction Inc. Page 1 of 2 Printed On: 7/17/2023 11:21 AM MCLARK CONSTRUCTION Matthew Coates (Coates Design Architects) 710 John Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE CCI /Clark Construction Inc. DATE City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 PCO #155 Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE SIGNATURE DATE Page 2 of 2 Printed On: 7/17/2023 11:21 AM NORTHWEST PARTITIONS To: Clark Construction Contact: Chris Dykeman Description: Delayed Completion Date - Union Labor Rate Increase Labor Foreman Time Foreman Time Frame Interior Frame Interior Hang Interior GWB Hang Interior GWB Lath / Mesh / Security Mesh Lath / Mesh / Security Mesh Bullet Panels Bullet Panels Fire Tape Fire Tape Finish Tape Finish Tape Clean Clean Truck/Shop Time Truck/Shop Time Total Miscellaneous Charges Insurance 1.5% Page 1 of 1 REQUEST FOR CHANGE ORDER Ref.# COR-2410-024 External/RCO# GC Ref# Date May 19, 2023 Job # 2410 Project: Bainbridge Island Municipal Court & Police Station 8804 Madison Ave North Bainbridge Island, WA 98110 _ Quantity UOM Unit Total Rate Total 238.00 Hrs 238.00 93.76 $22,314.88 -238,00 Hrs -238,00 8Z92 -$20,924.96 112.00 Hrs 112,00 88.23 $9.881.76 -112.00 Hrs -112.00 82.78 -$9,271.36 768.00 Hrs 768.00 88.95 $68,313.60 -768.00 Hrs -768.00 83.49 -$64,120.32 148.00 Hrs 148.00 88.95 $13,164.60 -148.00 Hrs -148.00 83.49 -$12,356.52 30.00 Hrs 30.00 88,95 $2,668.50 -30.00 Hrs -30.00 83.49 -$2,504.70 90.00 Hrs 90,00 85,84 $7.725.60 -90.00 Hrs -90,00 81.21 -$7.308.90 540.00 Hrs 540.00 85.84 $46,353.60 -540.00 Hrs -540.00 81,21 -$43,853.40 273,00 Hrs 273.00 88.23 $24,086.79 -273.00 Hrs -273.00 82.78 -$22,598.94 120,00 Hrs 120.00 62.90 $7,548.00 -120.00 Hrs -120.00 59.12 -$7,094.40 Total Labor $12,023.83 Total $180 36 Total Miscellaneous Charges $180.36 Notes: This cost is associated with the delay to the project which has now moved into a union labor rate increase for carpenters on 611123 and tapers/finishers on 7/1123. Per the subcontract schedule, NWP was to be complete with our scope prior to the union labor rate increase. AUTHORIZED BY: ON BEHALF OF: Clark Construction PROJECT MANAGER: Brian Kehler ESTIMATOR: Brian Kehler Labor Total: $12,023.83 Misc. Total: $180.36 Sub Total: $12,204.19 Mark Up: $1,829.81 Total: $14,034.00 20006- 14401 A,enue NL. Woudur, Ile. WA 98073 Run on June 8, 2023 10'. 38 AM T 425-375-2500 P 425-37i 2540 hup /hco.c nwpnrt cam « « N l I « N I I M I ' s - 1- m W d d •- ' m a o a F T n - LL � 0 a > V a O W n ry n ry - n ' y y w w w � •, w w w O d s a - o o o M CLARK CONSTRUCTION PCO #157 CCI / Clark Construction Inc. Project: 2209 - COBI Police & Municipal Court Bldg 901 Hildebrand Lane NE 8804 Madison Avenue North Bainbridge Island, Washington 98110 Bainbridge Island, Washington Phone: (206) 842-5450 Fax: (206) 842-3895 Prime Contract Potential Change Order #157: CE #157 - Dimensional / COBI IT meeting recommended changes TO: City of Bainbridge Island FROM: Clark Construction, Inc, 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBER/REVISION: 157 / 0 CONTRACT. 1 - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED BY: Marty Telschow (Clark Construction, Inc.) STATUS: Approved CREATED DATE: 6/20/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $19,764.79 POTENTIAL CHANGE ORDER TITLE: CE #157 - Dimensional / COBI IT meeting recommended changes CHANGE REASON: Owner/Architect POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #157 - Dimensional / COBI IT meeting recommended changes Dan Cann with Dimensional Communications and the COBI IT department had a meeting to review the AV in the courtroom. Dan recommended some changes to make the zoom capabilities better. This change order is to track and detail those changes. • Synergy -Additional rough -in work from Synergy Electrical for raceways and wire -pulling; Adding one 120V receptacle. • Dimensional - 1. Provide a USB connection from the sound processor to the Clerk's PC location. This will provide a connection to the Clerk's PC that will allow for audio recording of the court session (using the FTR software that they currently use for their court recordings). 2. Add a monitor and a fixed camera for the judge location. 3. Add a monitor and a fixed camera for the witness location. 4. Add a pan/tiltlzoom camera at the front of the room for viewing of the attorneys and the gallery. 5. Add a quad view windowing processor. This processor will provide a split screen of the courtroom cameras with 4 windows for viewing of the judge camera, the witness camera, the attorney camera, and a content presentation feed all in one view for viewing from the far end of a web conference call. 6. Add a 82" display in the front of the room for viewing of the room presentation and web conferencing by the attorneys and the gallery. The added front camera for the attorneys will be located directly adjacent to the added front display. This display may need to be a ceiling hung display and camera configuration because of the window. This should be the only addition that will require additional low voltage rough -in and a 120 VAC receptacle. 7. We recommending changing the wireless gooseneck microphones to wired gooseneck microphones. The wireless microphones require batteries and are less reliable than a wired microphone. In this application we believe the wireless desktop gooseneck microphones provide no additional value and the management of the batteries for the microphones adds another task that a City of Bainbridge employee will have to manage. There would be a cost savings by going to wired microphones for the desk microphones. We would still provide 2 wireless microphones for non -stationary use. 8. We recommend changing the traditional AV switching system to a network encoder/decoder AV switching system. This is newer technology, it is available to ship, and it should provide a cost savings. 9. Add an input for an owner furnished Zoom computer. The Zoom computer will be available as a source for the system, and will be tied into the room audio system for use during web conferencing, CC[ / Clark Construction Inc. Page 1 of 2 Printed On: 7/18/2023 10:33 AM CLARK �\ CONSTRUCTION PCO #157 10. Add a ceiling microphone above the attorney area to provide microphone pick-up for when the attorneys are not using their tabletop microphones. Approved via email from Chris Wierzbicki 7-5-23 ATTACHMENTS: CO#22-RFI 157-AV System Changes gdf # Budget Code Description Amount 1 16-050.0 Electrical rough in and trim o.Other Dimensional Changes to AV. $16,293.41 2 01-790.0 Supervision - interior.Other Onsite coordination and OA/OC $1,250,00 3 01-810.0 Project management.Other Management & Processing $520.00 4 50-400.0 WSHA.Other WSHA $361.27 5 5D-200.0 CGL.Other CGL $169.51 6 50-300.0 B&O taxes.Other B&O $111 57 7 50-500.0 BOND.Other BOND $117 85 8 50-100.0 Fee.Other FEE 5% $941.18 Grand Total: $19,764.79 Matthew Coates (Coates Design Architects) 710 John Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 SIGNATURE DATE Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE CCI / Clark Construction Inc. Page 2 of 2 Printed On: 7/18/2023 10:33 AM synERGY ELECTRICAL COnTRACTInG P.O. Box 1544 Port Angeles, WA 98362 Email: synergyelectricalcontracting@gmail.com June 28, 2023 Clark Construction, INC 901 Hildebrand Lane Northeast Suite 200 Bainbridge Island, WA 98110 JOB: Bainbridge Police and Municipal Court C.O. #22 — RFI 9157 Changes to AV System Description: As a result of the City of Bainbridge's meeting with Dimensional Communications, and their work -up of added scope, we are relaying the additional costs associated. Additional rough -in work from Synergy Electrical for raceways and wire -pulling; Adding one 120V receptacle. Synergy Electrical Material: $456.75 Labor: $1,860.13 SubTotal: $2,316.88 OH&P @ 15%: $347.53 Dimensional Quote: S12,980.00 OH&P @ 5%: $649.00 Total Price: $16,2930.41 (not inclutlinn! tax) Mark W. Shamp (Owner) Synergy Electrical Contracting, LLC SYNERGY ELECTRICAL CONTRACTING INC. PROJECT NAME COBI Police Station & Municipal Court Facility PROJECT CHANGE ELECTRICAL# CO #22 Description: RFI 157-AV System Changes Major Materials: $ - Lighting $ - Minor Materials: $ - Swilchgear $ - Miscellaneous Materials: $ 450.00 UPS $ - Consumables: $ 6.75 Generator 3 - Carting/Freight: $ - ATS $ - Tax: Exempt 1 $ - Firestopping $ - TOTAL MATERIAL: (A) $ 456.75 Items to consider Straight Premium reauired Direct Labor: 14.00 Hrs. a $101.49 $ 1,420.86 0 Hrs. q $139.26 $ - Foreman Labor: 1.40 Hrs. @ $109.04 $ 152.66 0 Hrs. a $149.99 $ - Supervisor Labor: 1.40 Hrs. q, $109.04 $ 152.66 0 Hrs.n $149.99 $ - DrawingReviewLabor: 0.35 Hrs. "ri $109.04 $ 38A6 0 Hrs. y $149.99 $ Coordination Labor: 0.3511 rs. 4i $109.04 $ 38.16 0 Hrs.@ $149.99 $ - Trash Cleanup: 0.15 Hr, . a $101.49 $ 15.63 0 Hrs Qn. $139.26 $ - LostProductivityLabor: 0.00 Hrs. a $101.49 $ - 0 Hrs. rc $139.26 $ Project Management: 0.351irs. a $120.00 $ 42.00 0 Hrs..e $180.00 $ - TOTAL LABOR: (a) $ 1,860.13 Travel: (C) $ Acceptance Testing: (D) $ Coordination, Drafting, Engineering, Record drawings: (E) $ Special Equipment: Lift Rental/Rigging (F) $ _ Permits: (G) $ Sub -Total: $ 2,316.88 Overhead & Profit: 15.00% $ 347.53 Subcontractor Total: $ Bond: iJ.O g TOTAL: $ 2,664.41 0 $ - Submitted Amount: $2,664.41 THIS PRICE FIRM FOR THIRTY (30) DAYS. Please note that a time extension of 0 days will be required to complete this wort: LOgpOnOL�400n©o moo CITY OF BAINBRIDGE ISLAND MUNICIPAL COURT BUILDING AV SYSTEMS CHANGE ORDER PROPOSAL Date: June 26, 2023 To: Jeremy Felton From: Dan Cann Subject: RFI 157 AV System Changes Correspondence #: DCI-COP-003 Project: COBI Municipal Court AV Systems No. Pages: 1 CC: job file / operations / accounting We hereby propose the following project changes. Per the response to RFI 157 make the following changes: 1. Provide a USB connection from the sound processor to the Clerk's PC location. This will provide a connection to the Clerk's PC that will allow for audio recording of the court session (using the FTR software that they currently use for their court recordings). 2. Add a monitor and a fixed camera for the judge location. 3. Add a monitor and a fixed camera for the witness location. 4. Add a pan/tilt/zoom camera at the front of the room for viewing of the attorneys and the gallery, 5. Add a quad view windowing processor. This processor will provide a split screen of the courtroom cameras with 4 windows for viewing of the judge camera, the witness camera, the attorney camera, and a content presentation feed all in one view for viewing from the far end of a web conference call. 6. Add a 82" display in the front of the room for viewing of the room presentation and web conferencing by the attorneys and the gallery. The added front camera for the attorneys will be located directly adjacent to the added front display. This display may need to be a ceiling hung display and camera configuration because of the window. This should be the only addition that will require additional low voltage rough - in and a 120 VAC receptacle. 7. We recommending changing the wireless gooseneck microphones to wired gooseneck microphones. The wireless microphones require batteries and are less reliable than a wired microphone. In this application we believe the wireless desktop gooseneck microphones provide no additional value and the management of the batteries for the microphones adds another task that a City of Bainbridge employee will have to manage. There would be a cost savings by going to wired microphones for the desk microphones. We would still provide 2 wireless microphones for non -stationary use. 8. We recommend changing the traditional AV switching system to a network encoder/decoder AV switching system. This is newer technology, it is available to ship, and it should provide a cost savings. 9. Add an input for an owner furnished Zoom computer. The Zoom computer will be available as a source for the system, and will be tied into the room audio system for use during web conferencing. 10. Add a ceiling microphone above the attorney area to provide microphone pick-up for when the attorneys are not using their table top microphones. Bainbridge Island Municipal Court AV Systems - DCI Project Proposal Page 1 LLLi[1LL LLI:LL L"L' LUi Ll LLLLL1vLLLat 1220 Anderson Road, Mt. Vernon, WA 98274 360-424-6164V 360-424-8872F DCI@dimensional.net Make the following changes Quantity -5 Crestron DM-RMC-4KZ-100-C HDMI Receiver TMOI $ 3,21T50 -4 Crestron TM-TX-4KZ-100-C-lG-B-T HDMI Transmitter $ 2,860.00 -1 Crestron DM-MD8X8-CPU3 8x8 Di italMediaTM Switcher $ 3,074.50 3 Crestron DMC-4KZ-CO-HD 2-Channel Di italMedia 813 Output Card $ 2,788.50 -4 Crestron DMC-4KZ-C Di italMedia SG Input Card $ 3,146.00 1 Crestron DMC-4KZ-HD HDMI Input Card for DM® Switchers $ 572.00 -1 Shure ULXD4Q $ 5,436.60 6 Shure ULXD8 Gooseneck Base $ 2,792.40 -6 Shure MX415LP/C 15" gooseneck Microphone $ 1,271.40 1 Samsun BE82T-H 82" Display $ 2,021.60 1 Chief CMS492C 2' x 2'Ceiling Storage Box with Column Drop $ 628.50 1 Chief LCM1U Large Fusion Micro -Adjustable Ceiling Mount $ 342.00 1 Chief Mount accessories for Ceiling Mount $ 262.50 2 QSC I/O USB Bridge Q-SYS $ 3,750.00 1 QSC NS26-300+ 26- ort network switch $ 2,692.50 6 Shure MX418D/C Desktop Gooseneck Condenser Microphone $ 2.151.00 1 Shure MXA920W-S Ceiling Microphone Array $ 4,726.50 4 Visionary Solutions PacketAV E4100 HDMI Encoder $ 3,570.00 1 Visionary Solutions PacketAV E-WP-H-WHITE Wall late HDMI Encoder $ 1,462.50 6 Visionary Solutions PacketAV D4100 HDMI Decoder $ 5,355.00 3 Beetronics 15HD7 15" 1080p Monitor $ 1,795.60 1 PTZ Optics I PT12X4KWHG3 Pan TiltZoom Camera $ 2,160.00 1 PTZ Optic HCM-I-WH Camera Wall Mount $ 135.00 2 Mokose 1080 Fixed Camera $ 329.85 2 VideoSecu Camera Mount $ 86.97 1 Crossbow HDMI Quad -view Processor $ 1,198.50 1 Ma ewell HDMI to USB Coverter $ 448.50 1 Crestron HD-TX-4KZ-101 HDMI Transmitter $ 300.00 1 Crestron HD-RX-4KZ-101 HDMI Receiver $ 300.00 24 DCI Installation and Programming Labor $ 4,422.54 Total: $ 12,980.06 Respectfully Submitted, Dan Cann Project Manager Accepted Total for COP-003: $12,980.00 + WSST Bainbridge Island Municipal Court AV Systems - DCI Project Proposal Page 2 LLLW Lt LLLLL LLLUiL' LLLLL uLLLLE 1220 Anderson Road, Mt. Vernon, WA 98274 360-424-6164V 360-424-8872F DCI@dimensional.net MCLARK CONSTRUCTION CCI / Clark Construction Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Phone: (206) 842-5450 Fax: (206) 842-3895 PCO #165 Project: 2209 - COBI Police & Municipal Court Bldg 8804 Madison Avenue North Bainbridge Island, Washington Prime Contract Potential Change Order #165: CE #165 - Frame & Finish around ductwork at door 202 TO: City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBERIREVISION: 16510 CONTRACT: i - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED BY: Marty Telschow (Clark Construction, Inc.) STATUS: Approved CREATED DATE: 7/7/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $3,184.08 POTENTIAL CHANGE ORDER TITLE: CE #165 - Frame & Finish around ductwork at door 202 CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CEA165 - Frame & Finish around ductwork at door 202 Ductwork was intalled at Door 202, Per the plans, no framing is shown at this location. In order to not block the doorway, It will need to be build at an angle. Work includes framing and finish at this location. Approved Via Email from Chris Wierzbicki 7-11-23 ATTACHMENTS: COBI Police - COR-2410-029 - Frame & Finish Around Ductwork at Door 202 p # Budget Code Description Amount 1 09-050.0 Drywall.Other Framing & Finishing around ductwork#202 $2,530.00 2 01-790.0 Supervision - interior.Other Onsite coordination & QA/Qc $250.00 3 01-810.0 Project management Other Management & Processing $130.00 4 50-400.0 WISHA.Other WISHA $58.20 5 50-200.0 CGL.Other CGL $27.31 6 50-300.0 B&O taxes.Olher B&O $17.97 7 50-500.0 BOND.OIher BOND $18.98 8 50-100.0 Fee,Other FEE $151.62 Grand Total: $3,184.08 CCI / Clark Construction Inc. Page 1 of 2 Printed On: 7/17/2023 11:32 AM M CLARK CONSTRUCTION Matthew Coates (Coates Design Architects) 710 John Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 SIGNATURE DATE CCI / Clark Construction Inc, Page 2 of 2 PCO #165 Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE Printed On: 7/17/2023 11:32 AM NORTHWEST PARTITIONS To: Clark Construction Contact: Chris Dykeman Description: Frame & Finish Around Ductwork at Door 202 Page 1 of 1 REQUEST FOR CHANGE ORDER Ref.# COR-2410-029 External/RCO# GC Ref# Date Jul 05, 2023 Job # 2410 Project: Bainbridge Island Municipal Court & Police Station 8804 Madison Ave North Bainbridge Island, WA 98110 Labor Quantity UOM Unit Total Rate Total Foreman Time 2.00 Hrs Z00 93.76 $187.52 Layout 0.50 Hrs 0.50 93.76 $46.88 Frame Interior 3.00 Hrs 3.00 88.23 $264.69 Hang Interior GWB 3.00 Hrs 3.00 88.95 $266.85 Finish Tape 6.00 His 6.00 86.84 $515.04 Clean 2.00 Hrs 2.00 88.23 $176.46 Stock 1.00 His 1.00 88.23 $88.23 Truck/Shop Time 4,00 Hrs 4o0 62,90 $251.60 Total Labor $1,797.27 Material Size Quantity UOM Unit Price Total Material - Steel EACH 1.00 E4 218.03 EA $218.03 Material -Drywall EACH 1.00 EA 81.00 EA $81.00 Material - Taping EACH 1,00 EA 40.15 EA $40. 15 Material - Misc. EACH 1,00 EA 31.25 EA $31.25 Total Material $370.43 Total Miscellaneous Charges Total Insurance 1.5% $32.52 Total Miscellaneous Charges $32.52 Notes: Ductwork was intalled at Door 202. Per the plans, no framing is shown at this location. In order to not block the doorway, it will need to be build at an angle. Work inlcudes framing and finish at this location. AUTHORIZED BY: ON BEHALF OF: Clark Construction PROJECT MANAGER: Brian Kehler ESTIMATOR: Brian Kahler Labor Total: $1,797.27 Material Total: $370.43 Misc. Total: $32.52 Sub Total: $2,200.22 Mark Up: $329.78 Total: $2,530.00 20006 - 144dh Avenue NF. Woodim ille. WA 98072 Run on July 5, 2023 8'.18 AM T 425-375-2500 F 425-375-2540 hup //%\\AP mcpon Cons M CLARK CONSTRUCTION PCO #167 CCI / Clark Construction Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Phone: (206) 842-5450 Fax: (206) 842-3895 Project: 2209 - COBI Police & Municipal Court Bldg 8804 Madison Avenue North Bainbridge Island, Washington Prime Contract Potential Change Order #167: CE #167 - Trellis Removal TO: City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBER/REVISION: 167 / 0 CONTRACT: 1 - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED BY: Marty Telschow (Clark Construction, Inc.) STATUS: Approved CREATED DATE: 7/7/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $2,019.07 POTENTIAL CHANGE ORDER TITLE: CE #167-Trellis Removal CHANGE REASON: Owner/Architect POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #167 - Trellis Removal Per email from Chris. Removal of the trellis was requested. Costs include time, equipment, and disposal needed for removal Approved Via Email from Chris Werzbicki 7-11-23 ATTACHMENTS: # Budget Code Description Amount 1 02-900.0 CCI Demolition Labor.Other Labor for removing trellis (4) $1,054.80 2 02-100.0 Site work.Olher Equipment & Disposal $250.00 3 01-790.0 Supervision - inledor.Other Onsite coordination & QA/QC $250.00 4 01-810.0 Project management.Other Management & Processing $130.00 5 50-400.0 WSHA,Other WISHA $33,70 6 5D-200.0 CGL.Other CGL $15.81 7 50-300.0 B&O taxes.Other B&O $10.41 8 50-500.0 BOND.Other BOND $10.99 9 50-100.0 Fee.Other FEE 15% $263.36 Grand Total: $2,019.07 CCI / Clark Construction Inc. Page i of 2 Printed On: 7/17/2023 11:37 AM MCLARK CONSTRUCTION Matthew Coates (Coates Design Architects( 710 John Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE CCI / Clark Construction Inc. DATE City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 PCO #167 Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE SIGNATURE DATE Page 2 of 2 Printed On: 7/17/2023 11:37 AM M CLARK CONSTRUCTION CCI / Clark Construction Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Phone: (206) 842-5450 Fax:(206) 842-3895 PCO #025-3 Project: 2209 - COBI Police & Municipal Court Bldg 88D4 Madison Avenue North Bainbridge Island, Washington Prime Contract Potential Change Order #025-3: CE #025-3 - ASI-003 - ASI- 004 - ASI-005 - ASI-006 - Plan Changes - Field Directive 06 TO: City of Bainbridge Island FROM: Clark Construction, Inc. 280 Madison Avenue North 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 Bainbridge Island, Washington 98110 PCO NUMBER/REVISION: 025-3 / 0 CONTRACT: 1 - City of Bainbridge Island Police and Municipal Court Facility Project. REQUEST RECEIVED FROM: CREATED BY: Marty Telschow(Clark Construction, Inc.) STATUS: Approved CREATED DATE: 6/2/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT. $161,311.97 POTENTIAL CHANGE ORDER TITLE: CE #025-3 - ASI-003 - ASI-004 - ASI-005 - ASI-006 - Plan Changes - Field Directive 06 CHANGE REASON: Client Request POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract /s Changed As Follows) CE #025 - ASI-003 - ASI-004 - ASI-005 - ASI-006 - Plan Changes - Field Directive 06 ASI-003 Owner Requested Revisions • Items in this change order • Casework changes / Z drawings • Install of evidence locker • Butcher paper dispenser • Lab Hood Installation • Freight to site for Lab Hood • Roof top unit feeder relocation Approved per email from Chris Wierzbicki 7-14-23 ATTACHMENTS: CO#19 RTU Feeder Relocate.pdf , Pinchiff CO 12 to install extraction hood odf , _Suraent -Install 4 Evidence Lockerszd , 2209 - Casework Changes ASI-003.pdf # Budget Code Description Amount 1 10-050.0 Finish hardware.Other Butcher Paper Dispenser & Paper $387.66 2 06-250.0 Interior trim, ceilings & paneLOther Casework & Judge's Courtroom $116,096.15 3 1D-050.0 Finish hardware.Other Evidence Locker Install $3,914.88 4 15-100.0 Forced air heal system.Other Lab Hood Installation $3.500.00 5 15-100.0 Forced air heat syslem.Other Lab Hood Freight to site $125.00 6 16.050.0 Electrical rough in and trim o.Other Roof lop unit feeder relocation $5,282.43 CCI / Clark Construction Inc. Page i of 2 Printed On: 7/17/2023 11:42 AM ECLARK CONSTRUCTION PCO #025-3 # Budget Code Description Amount 7 01-790.0 Supervision - interior.Other Onsite coordination & QA/QC $15.000.00 8 01-810.0 Project management.Other Management & processing $3,120.00 9 50-400.0 WISHA.OIher WISHA $2,948.52 10 50-200.0 CGL.Other CGL $1,383.45 11 50-300.0 B&O taxes -Other B&O $910.55 12 50-500.0 BOND.Other BOND $961.81 13 50-100.0 Fee.Other Fee $7,681.52 Grand Total: $161,311.97 Matthew Coates (Coates Design Architects) 710 John Nelson Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE City of Bainbridge Island 280 Madison Avenue North Bainbridge Island, Washington 98110 SIGNATURE DATE Clark Construction, Inc. 901 Hildebrand Lane NE Bainbridge Island, Washington 98110 SIGNATURE DATE CCI / Clark Construction Inc. Page 2 of 2 Printed On: 7/17/2023 11,42 AM BASEBIO A51-003M Quantity Unit Prlte Extension Quantity Unit Prin Extension Count -115. Courtccm Casework Includes handrails at ramp and steps to fudge's platform (4 halal) Drawings AS.13 Delta Ft A0, 14 1 $51,530.00 $51,530.00 1 $63.511.34 $63,511.34 $11,99134 Site Survey and Installation 1 $23,525 00 $23,525.00 1 $11,468.35 519,463.35 -54,056.65 Court - 21S- Courblury separation Rails NEW Prim Includes fabrication ®installation assistance (receiver plates) of Jury Separation Rails per drawing 4 215 RA, 215.98 per Architects review and comments dated 5/11/2023 Separatoa Rolls 0 Soon $0,00 1 $7,643.51 $7,643,51 $7,643.51 Court-215. Court Handrails Upgrade -Per Architects Review/Comments NEW Price Includes handrails per Architects review/comments an 5/11/2023 and a credit for handrails provided In original proposal Court Hantlrails 0 Solon $a no 1 $6.389.92 $5,389.92 $6.39992 Increase in maledal5 due to lure conference/ All Cecil's lunch Casework Room 203 additional catiinalry Casework 1 $0,200.00 $9,20. an 1 $8.94570 $8,945.70 $745]0 Ins[allanon 1 $S,SOo00 $5,50000 1 $5,204,46 $5)04A6 $204.46 Increase In materials due to Reception Fir Wall Panels B Quaint Countertops Room 211 Fir Veneer Plywood Casework 1 $19.881 $19,890.00 1 $21,fi4iW $211645.10 $2,765.10 Installation 1 $RI00.00 $0,100.00 1 $8,556.69 $95$669 $4S6.69 Increase In materials due to laminate choice and drawer Count lunch Casework Room 23S configurations Casework 1 $10,650.00 $10,65o0D 1 $11,978.50 $11,978.50 $1,328,50 Installation 1 $4,950.ED SASSO.00 1 $5,704A6 $5,704.46 $754.46 Inme.e. In dou rgh, clue t0 Polite Lunch Casework Room 231 laminate choice and delay Casework 1 $12,185 W $12,185 00 1 512,296 89 $12,296 B9 $111.89 Insallatian 1 $5,590 00 $5,590.00 1 55,104.46 55j04.45 5114.411 Reception P Lam COunlerlops and Supports 102 Casework 1 $2,869.02 S2,86902 1 $2,96902 $209.02 No Change Saco Installation 1 $2,02,23 $2,852.23 1 $2,85223 $2.952.23 $0.00 HD Shaul, 114 (LA9l Casework NEW Casework 0 $o00 Soon 1 $9,9925R $8,99258 $8,997.58 Installation 0 $0.00 5000 1 $5,204A6 $SJ04.46 $5,704,46 Bag 8 Tag 12A L.AahCasework8 Table NEW Casework 0 $O.M $000 1 $20,19]9 $20,152]9 $20.157,79 Installation 0 Solon $0.00 1 $8,556 69 $8,556 69 59,55569 Admin. Casework -13U Casework 1 $9.533,63 $9,533.63 1 $9,533.63 $9,533.63 No Change $0.00 Inuailol., 1 $5,704,46 $5,704.46 1 55.704,46 $5,204.45 $0.00 Coffee Counter Casework 131B No Change Casework 1 55,479,21 $5,479,21 1 $5,479.21 $5,479,21 $0.00 Installation 1 $2,85213 $1;85113 1 $2,852.23 $2,852.23 $000 MCEr's edefing/Repmts Casework 141 NEW Casework 0 $0,00 $0.00 1 $6,088,94 $6,O9B94 $6,088 94 Installation 0 $O,Oo 000 1 55,704.46 $5,204.46 55,204.46 Conference IT 132 BAUORE North- Casework -13l Interview NEW Casework 0 $0.00 $0.00 1 $19,193.20 $19,183 28 $19,183.28 Installation 0 $0,00 $0.00 1 $5,204.46 $5J04A6 $5,204.46 Weapons Counter/shelf NEW Casework 0 $o on $000 1 $6,209.11 $6,70,11 $6,10911 Installation 0 soon So 00 1 $1,85010 $1,850,00 $1,85000 Bale Bid Courtroom S25,055.00 Delta $116p96.13 Base Bid Cabinetry $104,34S.79 A51 O03R4 Courtroom $92,979.69 A51 003RA Cabinelry $212,512,24 $295.496.93 $11809fi.15 synERGY ELECTRICAL conTRACTinG P.O. Box 1544 Port Angeles, WA 98362 Email: synergyelectricalcontracting@gmail.com June 28, 2023 Clark Construction, INC 901 Hildebrand Lane Northeast Suite 200 Bainbridge Island, WA 98110 JOB: Bainbridge Police and Municipal Court C.O. #19 — Roof -Top Unit Feeder Relocate Description: An existing corridor wall at SW corner of 2"d floor, near top of stairwell, was demo'd. This wall contained the raceway/feeder wiring for the existing Roof -Top Unit. This requires the relocation of the required raceway/wiring into another wall. Work Includes: Remove and re -install 2" raceway from the first floor up to the second floor, along with one junction -box on first floor and a second junction -box on the second floor, above the Acoustic Ceiling Tiles. Pull new wire in-between junction boxes. The system will be re -energized and tested at the Disconnect on the Roof -Top. Material: MC connectors/bushings; x2) 18"x8"x8" NEMAI enclosures; deep strut; 2" EMT conduit & fittings: couplings, connectors, 901s; 250MCM THHN CU wire; 4 AWG THHN CU; insulated mechanical wire connectors; 2-port solderless lug for 2 AWG CU. Labor: One electrician x26 hours Total Price: $5,282.43 (not includinl7 tax) Mark W. Shamp (Owner) Synergy Electrical Contracting, LLC. SYNERGY ELECTRICAL CONTRACTING. INC. PROJECT NAME COBI Police Station & Municipal Court Facility PROJECT CHANGE ELECTRICAL# CO 419 Description: RTU Feeder Relocate Major Materials: $ - Lighting $ Minor Materials: $ 1,122.06 Switchgear $ - Miscellaneous Materials: $ - UPS $ - Consumables: $ 16.83 Generator $ - Carting/Freight: $ - ATS $ - Tax: Exem t $ - Firestopping $ TOTAL MATERIAL: (A) $ 1,138.89 Items to consider Straight Premium required Direct Labor: 26.00 Hrs. a $10 L49 $ 2,638.74 0 Hrs. r@ $139.26 $ - Foreman Labor: 2.60 Hrs. a $109.04 $ 283.50 0 Hrs. r $149.99 $ Supervisor Labor 2.60 Hrs. a $109.04 $ 283.50 0 Hrs. ra $149.99 $ Drawing Review Labor: 0.65 Hrs. @ $109.04 $ 70.88 0 Hrs. « $149.99 $ Coordination Labor: 0.65 Hrs. Ca $109.04 $ 70.88 0 Hrs. d $149.99 $ - Trash Cleanup: 0.29 Hrs a $I0IA9 $ 29.03 0 Hrs r $139.26 $ - LostProductivityLabor 0.0011rs.? $101.49 $ - 0 Hrs. @ $139.26 $ Project Management: 0.651-I rs« $120.00 $ 7&00 0 Hrs a $180.00 $ - TOTAL LABOR: (B) $ 3,454.53 Travel: (C) $ Acceptance Testing: (D) $ Coordination, Drafting, Engineering, Record drawings: (E) $ Special Equipment: Lift Rental/Rigging (F) $ Permits: (G) $ Sub -Total: $ 4,393.42 Overhead & Profit: 15.00% $ 689.01 Subcontractor Total: $ Bond: NO $ TOTAL: $ 5,282.43 0 $ Submitted Amount: $5,282.43 THIS PRICE FIRM FOR THIRTY (30) DAYS. Please note that a time extension of 0 days will be required to complete this work Pinchiffa MECHANICAL Design • Installation • Service CHANGE ORDER PROPOSAL June 27, 2023 Clark Construction Bainbridge Island, WA Project: COBI Police & Courts Building Re: Lab Hood Installation REFERENCED DRAWINGS • MOVEX ME 100 spec sheet and installation brochure • Mechanical plan M2.01 SCOPE OF WORK COP 22023 —12 1. Install MOVEX ME 100 extraction arm exhaust unit in Room 124 2. Provide strut and/or angle iron support for extraction are to attach to structure Note: MOVEX ME 100 extraction are to be provided by Clark Construction TOTAL PRICE FOR THIS WORK $3,500 Please provide a Change Order to our contract for this work. Submitted by, Ken Pinchiff — President (206) 643-2046 cell ken P(a)pinchiffmechanical.com 355 Treck Drive, Suite 201, Tukwila, WA 98188 (206) 767-1111 Surgent Incorporated P.O. Box 1238 Snohomish WA 98291-1238 425-488-0611 License: SURGEI'900C6 To: Clark Construction Inc P.O. Box 10625 Bainbridge Island WA 98110 Request for Change Order Order#: 1 Order Date: 05/31/2023 Project: 1526 COBI Police & Municipal Court Bldg 8804 Madison Avenue North Bainbridge Island WA 98110 The contractor agrees to perform and the owner agrees to Plans Attached El for the following changes to this contract. Ordered By: Customer Order: Specifications Attached ❑ of work COR01 Install 4 Evidence Lockers Installation of evidence lockers NOTE Locker unloading may need to be done with general contractor supplied fork lift Notes Negative changes will lower the overall contract price requiring no additional payment by owner. Requested Amount of Change Owner: Date: Contractor: Date: Amount 3,914.88 3,914.88