Loading...
RES 93-41 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAMRESOLUTION NO. 93- 41 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BAINBRIDGE ISLAND, WASHINGTON, ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, as amended, the City Council of the City of Bainbridge Island has previously adopted a Comprehensive Street Program and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accomplished under the said program, determined current and future city street and arterial needs , and based upon these finds has prepared a Six- year Transportation Improvement Program for the next ensuing six (6) calendar years, and WHEREAS, a public hearing has been held on the said Six -Year Transportation Improvement Program, and WHEREAS, the City Council finds that there will be no significant adverse environmental impacts as a result of adoption of implementation of the Six -Year Transportation Improvement Program; now, therefore, THE CITY COUNCIL OF THE CITY OF BAINBRIDGE ISLAND, WASHINGTON, HEREBY RESOLES AS FOLLOWS: Section 1. Program Adopted. The Six -Year Transportation Improvement Program for the City of Bainbridge Island, as revised and extended for the ensuing six (6) calendar years, a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth, which program sets forth the project location, type of improvement and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board for the State of Washington. RESOLVED this 16th day of Dec r1993. SAM J (RA ATO, Mayor ATTEST/AUTHENTICATE: 0:-) usan P. Kasper, City Clerk APPROVED AS TO FORM: ROD P. KASEGUMA, City Attorney FILED WITH THE CITY CLERK: 10-1-93 PASSED BY THE CITY COUNCIL: 12-16-93 RESOLUTION NO. 93-41 c:1wp5I VesoAtip.res Six Year Transportation Program 11/23/93 0 to 6 Page 1 Agency COBI City 0058 County 35 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total Util Start Federal Fund (Local Agency) Cl Pri ---------------------------------------------------------------------------------------------------------------------------------- Identification Type Length Code Date Cost Fund Code local Src Cost Total 1st 2nd 3rd 4th -6th ---------------------------------------------------------------------------------------------------------------------------------- 00 01 FERNCLIFF AVE 4 0.76 0 PE /94 115 STP 18 0 133 133 0 0 0 RW 0 0 0 0 0 0 0 0 WINSLOW WAY TO HIGH CN /95 1,087 STP 17 0 1,104 0 0 600 600 SCHOOL ROAD TOTAL 1,202 35 0 1,237 RECONSTRUCTION 06 02 MANITOU BEACH RD 03 0.33 P PE 0 12 0 12 12 0 0 0 EAST OF FALK RD; RW 0 100 0 100 100 0 0 0 RECONSTRUCT 8 CN 0 500 0 0 500 500 0 0 0 INSTALL GUARDRAIL TOTAL 0 612 0 612 08 03 WING POINT WAY 04 0.50 0 PE 0 60 0 60 0 0 0 0 RW 0 0 0 0 0 0 0 0 FERNCLIFF TO WING PT RD CN 0 565 T 847 1,412 1,059 353 0 0 RECONSTRUCTION TOTAL 0 625 847 1,472 06 04 FLETCHER BAY RD 0.00 PE 0 25 0 25 0 25 0 0 RAVINE CULVERT FAILURE RW 0 0 0 0 0 0 0 0 CN 0 80 0 80 0 80 0 0 TOTAL 0 105 0 105 06 05 WYATT WAY 04 0.50 0 PE /94 51 STP 8 0 59 59 0 0 0 RW /94 51 STP 8 0 59 0 59 0 0 MADISON TO EAGLE CN /94 445 STP 70 0 515 0 0 515 0 HARBOR/BUCKLIN HILL TOTAL 547 86 0 633 RECONSTRUCTION INCLUDING WYATT NAY/GROW AVE INTERSECTION AND WYATT WAY/FINCH ROAD INTERSECTION. 08 06 MADISON AVE 04 0.10 0 PE /94 40 STP 12 0 52 0 0 52 0 RW /94 52 STP 13 0 65 0 0 65 0 WINSLOW WAY TO PARFITT CN /95 286 STP 170 0 456 0 0 0 456 RECONSTRUCTION TOTAL 378 195 0 573 06 07 BRIEN AND BJUNE 04 0.76 0 PE /95 37 STP 8 0 45 0 0 44 0 WINSLOW WAY TO MADISON RW /95 44 STP 11 0 55 0 0 54 0 RECONSTRUCTION CN /96 228 STP 180 0 408 0 0 0 408 TOTAL 309 199 0 508 08 08 HIGH SCHOOL ROAD 04 0.50 0 PE 0 41 0 41 41 0 0 0 RW 0 0 0 0 0 0 0 0 MADISON TO SPORTSMAN CLUB CN 0 2,550 0 2,550 0 0 0 2,550 RD TOTAL 0 2,591 0 2,591 RECONSTRUCTION 06 09 WINSLOW WAY E 02 0.35 PE 0 98 0 98 0 0 0 98 FERNCLIFF TO SR305 RW 0 100 0 100 0 0 0 100 RECONSTRUCTION AND CN 0 409 0 409 0 0 0 409 WIDENING TOTAL 0 607 0 607 Six Year Transportation Program 11/23/93 0 to 6 Page 2 Agency COBI City 0058 County 35 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Func Project Imp Total UtiL Start Federal Fund (Local Agency) Cl Pri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 2nd 3rd 4th -6th 06 10 ___________________________________________________________________________________________________________ WINSLOW WAY E 03 0.50 PE 0 144 0 144 0 0 0 144 SR305 TO MADISON RW 0 0 0 0 0 0 0 0 RECONSTRUCTION CN 0 600 0 0 600 0 0 0 600 TOTAL 0 1,958 0 1,958 08 11 WINSLOW WAY W 04 0.25 0 PE 0 63 0 63 0 0 0 63 RW 0 0 0 0 0 0 0 0 MADISON TO LOVELL CN 0 50 T 200 250 0 0 0 250 RECONSTRUCTION TOTAL 0 113 200 313 GRAND TOTAL 2,436 5,912 1,047 9,395