RES 93-41 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAMRESOLUTION NO. 93- 41
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BAINBRIDGE
ISLAND, WASHINGTON, ADOPTING A SIX-YEAR TRANSPORTATION
IMPROVEMENT PROGRAM AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION
IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77
and 47.26, as amended, the City Council of the City of Bainbridge
Island has previously adopted a Comprehensive Street Program and
thereafter periodically modified said Comprehensive Street Program
by resolution, and
WHEREAS, the City Council has reviewed the work accomplished
under the said program, determined current and future city street
and arterial needs , and based upon these finds has prepared a Six-
year Transportation Improvement Program for the next ensuing six
(6) calendar years, and
WHEREAS, a public hearing has been held on the said Six -Year
Transportation Improvement Program, and
WHEREAS, the City Council finds that there will be no
significant adverse environmental impacts as a result of adoption
of implementation of the Six -Year Transportation Improvement
Program; now, therefore,
THE CITY COUNCIL OF THE CITY OF BAINBRIDGE ISLAND,
WASHINGTON, HEREBY RESOLES AS FOLLOWS:
Section 1. Program Adopted. The Six -Year Transportation
Improvement Program for the City of Bainbridge Island, as revised
and extended for the ensuing six (6) calendar years, a copy of
which is attached hereto as Exhibit A and incorporated herein by
this reference as if fully set forth, which program sets forth the
project location, type of improvement and the estimated cost
thereof, is hereby adopted and approved.
Section 2. Filing of Program. The City Clerk is hereby
authorized and directed to file a copy of this resolution together
with the exhibit attached hereto, with the Secretary of
Transportation and the Transportation Improvement Board for the
State of Washington.
RESOLVED this 16th day of Dec r1993.
SAM J (RA ATO, Mayor
ATTEST/AUTHENTICATE:
0:-)
usan P. Kasper, City Clerk
APPROVED AS TO FORM:
ROD P. KASEGUMA, City Attorney
FILED WITH THE CITY CLERK: 10-1-93
PASSED BY THE CITY COUNCIL: 12-16-93
RESOLUTION NO. 93-41
c:1wp5I VesoAtip.res
Six
Year
Transportation Program
11/23/93
0 to 6
Page
1
Agency
COBI
City
0058
County
35
Project Costs
in Thousands
of Dollars
Phase Data
Expenditure
Schedule
Func
Project
Imp
Total
Util
Start
Federal
Fund
(Local Agency)
Cl Pri
----------------------------------------------------------------------------------------------------------------------------------
Identification
Type
Length
Code
Date
Cost
Fund Code
local Src Cost
Total
1st
2nd
3rd 4th -6th
----------------------------------------------------------------------------------------------------------------------------------
00 01
FERNCLIFF AVE
4
0.76
0 PE
/94
115
STP
18
0
133
133
0
0
0
RW
0
0
0
0
0
0
0
0
WINSLOW WAY TO HIGH
CN
/95
1,087
STP
17
0
1,104
0
0
600
600
SCHOOL ROAD
TOTAL
1,202
35
0
1,237
RECONSTRUCTION
06 02
MANITOU BEACH RD
03
0.33
P PE
0
12
0
12
12
0
0
0
EAST OF FALK RD;
RW
0
100
0
100
100
0
0
0
RECONSTRUCT 8
CN
0
500 0
0
500
500
0
0
0
INSTALL GUARDRAIL
TOTAL
0
612
0
612
08 03
WING POINT WAY
04
0.50
0 PE
0
60
0
60
0
0
0
0
RW
0
0
0
0
0
0
0
0
FERNCLIFF TO WING PT RD
CN
0
565 T
847
1,412
1,059
353
0
0
RECONSTRUCTION
TOTAL
0
625
847
1,472
06 04
FLETCHER BAY RD
0.00
PE
0
25
0
25
0
25
0
0
RAVINE CULVERT FAILURE
RW
0
0
0
0
0
0
0
0
CN
0
80
0
80
0
80
0
0
TOTAL
0
105
0
105
06 05
WYATT WAY
04
0.50
0 PE
/94
51
STP
8
0
59
59
0
0
0
RW
/94
51
STP
8
0
59
0
59
0
0
MADISON TO EAGLE
CN
/94
445
STP
70
0
515
0
0
515
0
HARBOR/BUCKLIN HILL
TOTAL
547
86
0
633
RECONSTRUCTION INCLUDING
WYATT NAY/GROW AVE
INTERSECTION AND WYATT
WAY/FINCH ROAD
INTERSECTION.
08 06
MADISON AVE
04
0.10
0 PE
/94
40
STP
12
0
52
0
0
52
0
RW
/94
52
STP
13
0
65
0
0
65
0
WINSLOW WAY TO PARFITT
CN
/95
286
STP
170
0
456
0
0
0
456
RECONSTRUCTION
TOTAL
378
195
0
573
06 07
BRIEN AND BJUNE
04
0.76
0 PE
/95
37
STP
8
0
45
0
0
44
0
WINSLOW WAY TO MADISON
RW
/95
44
STP
11
0
55
0
0
54
0
RECONSTRUCTION
CN
/96
228
STP
180
0
408
0
0
0
408
TOTAL
309
199
0
508
08 08
HIGH SCHOOL ROAD
04
0.50
0 PE
0
41
0
41
41
0
0
0
RW
0
0
0
0
0
0
0
0
MADISON TO SPORTSMAN CLUB
CN
0
2,550
0
2,550
0
0
0 2,550
RD
TOTAL
0
2,591
0
2,591
RECONSTRUCTION
06 09
WINSLOW WAY E
02
0.35
PE
0
98
0
98
0
0
0
98
FERNCLIFF TO SR305
RW
0
100
0
100
0
0
0
100
RECONSTRUCTION AND
CN
0
409
0
409
0
0
0
409
WIDENING
TOTAL
0
607
0
607
Six
Year Transportation Program
11/23/93
0 to 6
Page
2
Agency
COBI
City
0058
County
35
Project Costs
in Thousands
of Dollars
Phase Data
Expenditure
Schedule
Func
Project
Imp Total
UtiL
Start Federal
Fund
(Local
Agency)
Cl Pri
Identification
Type Length
Code
Date Cost Fund Code
Local Src
Cost
Total
1st 2nd
3rd 4th -6th
06 10
___________________________________________________________________________________________________________
WINSLOW WAY E
03 0.50
PE
0
144
0
144
0
0
0
144
SR305 TO MADISON
RW
0
0
0
0
0
0
0
0
RECONSTRUCTION
CN
0
600 0
0
600
0
0
0
600
TOTAL
0
1,958
0
1,958
08 11
WINSLOW WAY W
04 0.25
0 PE
0
63
0
63
0
0
0
63
RW
0
0
0
0
0
0
0
0
MADISON TO LOVELL
CN
0
50 T
200
250
0
0
0
250
RECONSTRUCTION
TOTAL
0
113
200
313
GRAND TOTAL 2,436
5,912
1,047
9,395