RES 53-14 AUTHORIZING SIGNATURES A RF~0LUTION Of the Town Council of the T~wn of Winslew,
Washington, authorizing signing of contracts for construction
of a water distribution system and construction of m i~0,000
gallon steel reservoir.
WHIRFA~, response to the Townee advertised call for bids produced
twelve competitive bide for construction of a water system and five for
construction of a steel reservoir, _=~i
WI~IP~AS, these bids were publicly read and low bidder d~ter-
mined, and
WI~REAS, the ~ngine~er and Town Attorney have reviewed the bide
and rendered their recommendations;
N0W, Tmm~n~0i~, ~1 IT I3~OtVE by the Town Council of the T~fA
of Winslow, as follows:
That the Town accept the bid of the lowest bidder for construc-
tion of the water system, namely Nanson Construction Company, of Seattle,
Washington.
Tlmt the Town accept the bid of the lowest bidder for constrnc-
tion of a 1~0,000 gallon steel reservoir, namely Reliable Welding Works
Comp_n__~y, of Olympia, Washington.
~h~t the Mayor is hereby authorized to execute the contract
with each of the bidders named above on behalf of and in the name of the
Town, and the Clerk is hereby instructed to attest the signing of said
contracts as the authorised action of the Council.
PA~SE unanimously by the Council of the Town of Winslew, Wash-
ington, a~d approved by its Mayor this 18th day of March, 1953.
Attest~
"~ / 'f Clerk