RES 84-18 STREET IMPROVEMENT PROGRAMRESOLUTION NO. 84-18
A RESOLUTION ESTABLISHI~G A COMPREHENSIVE SIX
YEAR STREET IIIPROVEMENT PROGRAM FOR TIlE CITY
OF WINSLOW, WASHINGTON.
~tEREAS, Pursuant to the requirements of RCW 35.77.010,
Laws of the State of Washington, the City of ~inslow, has
prepared a revised and extended Si2/-Year Street Program for
the ensuing six calendar years, 1985 through 1990 and,
WHEREAS, TIlE CITY COUNCIL of the City of Winslow being
the legislative body of said City did hold a public hearing
on said Street Program at 7:00 P.M. at the City Hall in ~qinslow,
Washington on the 2nd of August, 1984.
THE CITY COUNCIL OF TIlE CITY OF WINSLOW, WASHINGT~I RESOLVES
AS FOLLOWS:
That, the revised and extended Six-Year Street Program,
for the ensuing six calendar years, 1985 through 1990 be and
the same is hereby adopted; and,
BE IT FURTttR RESOLVED, that a copy of said revised and
extended Six-Year Street Program for the ensuing six calendar
years, 1985 through 1990, together with a copy of this Resolution,
be filed with the Director of Itighways of the State of Washington.
PASSED by the Council of the City of Winslow, Washington, this
Second day of August, 1984.
F ~Z I~~'4~4'~''~
Deputy Mayor
ATTEST:
Clerk/Treasurer
_~ City/Courtly/
z
51 X' YEAR TRAMBPORTATION
OBLIGATION
PI~OJECT IDENTIFICATION
'~it lc, Rout , Road Log No.~ eection No.,
Lacati~rmini~D~ecription oF Work,
Beginning Milepost ~ bridBe No.
1 M ,A. DI ,S, ON ~/, l~I raN, S,L lOW .
IMPROVEMENT PROGRAM
PRO G RAM --
_ST 4 .....
2 H,IG,H, S,C,HQ,O,L, AS,R,~0,5, ,-, ~,E,AF,E,R, 2~,A, SD,F
GKO
3 WmYA ,T,T/.Cs OU iNi'Tif , ,L~I .N ,Er ,EiR~I iCmK~ .E ,N,
2~ F,E~R,N, CL,I,F~F]/,W~I sN,SF~ ,O~ r ,H, I~G,H, ~ ,C~ ~
5 MmA.DIII SO,N/,W,I,N~ 1L, O~ I .W~ ,Y,-~ ,A~ PhF ,I,T~F
6 H, I,G ,H.
GKO
2~A, ~D,F
GKO
2~A~ BD,F
G K
,S,CH ,O,O, L,/,Si Pi3,0~ r ,F, EmR,N, CrL ,ZF .~ ?2F"/~AI .t~D,F
GKO
iWiY,-,BiII3 ~,S,C~
7 GR.O,W, ,A,V~/,W,I~I,SL ~O.W,
8 G, LD,F_D ,N, /~,R, OW ,- ,E, lID,
3[~A, E~D,F
G K
DOT S40-O49
Jan. 4980
19 ss TO 19 9o
D%51RI B' ~TI ON
I C ' DISTRICT 5TAT~ AID [~IN[ER
I COPY QE.A.B. (COUMTIE~ O~LY)
4,14~'~41"~8 · ' !~ 5'L_'_~ 'T'
, ~21 5>1 R X' i38 iO,, ,' ,
&6. ~ R , 4, 510 ~
~8, 7 R I 5, 60 ~5
, & 7, 5 R , 5, ~0 ~
, ~iB R , 1, 15 , ,
, ~2,3 R IZ.:]O I ,
, ,13, E R ,2,95 , ,
, ~0,,c R ~2~ Q0 , ,
.~ CitSl/Cour~fy
City. No.
"County
5~'X"'YEAR TRANSPORTATION IMPROVEMENT PROGRAM
OBLIGATION PROGRAM--
PP-OJECT IDENTIFICATION
Til|¢, Rout , RoGd Log No.~
z~cot~;rmini,oe, cripfion oF Work,
Beginning ~ilcpo~ + 5ridee No.
'-2;'
9 S,TE sT,SO ,N:/b7 toOroOD m'l g~ ,D, ,
I111
10 I',RtE,N,E, ,P,L,/,E~A/g,LiE~ ,P,L~,C,]~-tE, Np, , ,
11 E, AIg ,L, E, ,PI L,/,Wm'I~ ,S, Lp ,W, ,W IY, -~At W~ ,E, Y,
12.W,F~,VF~ ~,/,NY,A,T,T,-,FfN,D, ,,,, ,, , ,'~ ,
13 W, LNIS, DO,W, ,WmAT v/]M, ApmI,Sp,N,-iL~OmVjE,L, Li
14 K, NE,C, BT,EL ,/,M, AD,I, ~O,N,-~,R~ ,C,K, StE,N, ;
DOT 'lz;O-~t9
D',5'~RI E.' '*'rl ON
I C ' DISTRICT STATE AID I~NGiN[ER
I COPY C.R.A,B, ('COUNTIES 0MJ-Y)
19 s5TO19 90
Az:lopf~on D~t~ 'B - %- - ~ hL
t · R~8o]ut ion Nu~ bet '~H - I '~
~ ~= ~ PR+O'D:ECT, COSTS' 11',,1 THOU,OANDS' O'F 'DOLLA R5
NOTE:
INSTRUCTIONS FOR PREPARING SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM
This form is ~t up in "Elite" typewriter format (12 character~ per inch) for coding computer inpuL Only chat Infon~ado~
appearing in the coding blocks will be entered on the computer. Additional information may be included on che form for
~e A~ency's convenience but will no t be placed on the computer file.
A. An obligation program Indicated the allocation of funds to major phases of project development i.e. preliminary engineering
right-of-way and construction. Show the funding amount for the entire phase or phases in the expected year of obligation even
though the expenditure of funds may take place over several years..
:
B. Include all proposed projects regardless of location or source of funds, however, urban arterial trust fund projects need to be
included only in six-year transportation improvement programs beginning In_od__d. numbered years.
C. Complete the form for the dx-year program in accordance with the following instructions:
HEADING
City/County:
County Number:
City Number: ....
Hearing Date: ..............
Adoption: .................
Resolution Number:
Enter name of local agency and appropriate county.
Enter the O.F.M. assigned number in code blocks 7 & 8.
Enter the O.F.M, assigned number In code blocks 3 thru 8.
Enter the date of action by the City Council or County Legislative Authority.
Enter the date of action by the City Council or County Legislative Authority.
Enter City Council or Co. Legislative Auth. resolution number (if applicable).
COLUMN NO.
1. Item No ................
2. Project Identification .... ;,
Enter local agency project identifying numbers in chronological order.
Enter appropriate information noted in column heeding. Enter Route Name and
terminl in code blocks 9 thru 35.
Major Class of Work ....... Enter the appropriate code number(s). Enter major code in block 36.
!. New construction on new alignment 6. Traffic control
2. Major widening (additional lanes) 7. Capital purchases
3. Minor widening (increase lane width, add shoulders) 8. Non capital impr0vementl
4. Rehabilitation/reconstruction. 9. Non Motor Vehide use
5. Resurfacing
Work Codes .............
A. Grading
B. Draining
C. Light Bituminous Surf/ca
D. A.C. or P.C.C. Pavement
E. Sealcoat
F. Curbs & Gutters
G. Sidewalks
H. Channelizatlon
I. Signalizatlon
J. Lighting
K. Signing
Enter appropriate code letter(s). Enter'major Items of work in code blocks 37 thru 40. L, Bridge
M. Landscaping
N. Paths & Trails
O. Bikeways
P. Transit Facility
Q. Commuter Pod
R. High Occupancy Vehicle Lanes
S. Surveillance Control & Driver Information
T. Ferry Facility
U. Project Studies
Total Length in Miles ...... Enter Length of project to nearest hundredth in code blocks 41 thru 44.
Functional Class .......... Enter one appropriate code letter in code block 45.
M - Major Arterial (Principal) S - Secondary Arterial (Minor) C - Collector Arterial (Collector) A - AccItl
Rural - Urban ............ Enter the appropriate letter: R - Rural
U - Urban in code block 46.
Carryover Project ......... Enter (x) if project is carried over from previous years annual element. (Funds were
not obligated during previous year). Enter in code block 47.
9. 1st Year (Annual Element)... Enter total project costs to be obligated in the first calendar year of the
program in code blocks 48 thru 51.
10 - 12. (2nd, 3rd. 4, 5 & 6th years) .. Enter estimated project costs to be obligated in each year or years in code block~
52 thru 55.
13. 15. & 16. Funding by Source .... Enter the dollar amount to be obligated under applicable funding source column ir
appropriate code blocks.
14.
17.
Program .............. .
Total Funds '
; i':'
:. ..;;
Enter the funding source program. (FAUS. FAS, SOS, etc.) in code blocks 68 thru 71
Enter total project cost in code blocis 80 thru 85.