RES 89-44 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM[{ESOLUTION NO. 8~-44
A RESOLUTION 'OF TIlE CITY COUNCIL OF TIlE CITY
OF WINSLOW , WASHINGTON, ADOPTING A SIX-YEAR
'FI1ANSPOIITATION IMPROVEMENT I~I]OGI]AM AND DIIIEC'I'-
ING TIlE SAME '['O BE FILED WITII TI-|I~ STATE SECIII~-
TARY OF 'I'I1ANSI'ORTATION AND TIlE ~.RANSPORTATION
IMPROVEMENT BOARD.
WIIEHEAS, pursuant to th6 requiremen.ts of I'{CW Chapters
35.77 and 47.26, as a,~ended, the City Coqncil of the City of
Winslow has previously adopted a Comprehensive Street Program and
thereafter periodically modified said Co,~prehensive Street
Program by resolution, and
WHEREAS, the City Council has reviewed the work accom-
plished unde~ the said program, determined current and future
City street and arteria~ needs, and based upon these Eind~ngs has
pre|~ared a Six-Year Transporkatio,~ Improvemen~ Pl~ocJralll for. the
next ensuing s~x (6) calendar years, and
WIIEREAS, a public hearing has been held o~ the said
Six-Year Transportation Improvement Program, and
WIIEIIEAS, the City Council finds that there will be no
significant adverse environmental impacts as a result of adoption
..
or implementation of the Six-Year Transportation Improvement
l~Fogram, now, therefore ,
TIlE CITY COUNCIL OF THE CITY OF WINSLOW, WASHINGTON,
llEHEBY RESOLVE AS FOLLOWS:
Section 1. Progra,,~ Adopted. The Six-Year Transporta-
tion Improvement Program for the City of Winslow, as revised and
extended for the ensuing six (6) calendar years {1990-1995
il~clusive), a copy of which is attached hereto as Exit|bit A and
incorporated heFein by this reference as if fully set forth,
which program sets forth the project location, type of impl~ove-
ment and the estimated cost thereof, is hereby 'adopted and
.:
approved.
Section 2. Filing of Program. The City Clerk is
hereby authorized and directed to file a copy of this resolution,
together with the exhibit attached her.eto, with the Secretary of
Transportation and the Transportation Improvement Board for the
State of Washington.
RESOLVED this 27th day of September
, 1989.
Approved:
ALIC~ B. TAWRESEt, Mayoj~
ATTEST/AUTHENTICATE:
FILED WITH THE CITY CLERK: September 1, 1989
PASSED BY THE CITY COUNCIL: September27, 1989
RESOLUTION NO. 89-44
IIIII
~m ~>dd
Z Z Z
X :a >. >,
O I- I-.-
all (,) ~
~ O
v _
rr
O '
u. --
0 --
z '
9 '
I- '
o,
L)
ul
,m
-
Z
I-
Q)
>' d d
0 I.- I---
u ~
>"
I--. C.,)
o~ ~:om~U
IIII
NOTE:
INSTRUCTIONS FOR PREPARING SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM
This form is set up in "Pica" lypewriler format (10 characters per inch) for coding computer input, Computer space for the description of
work is limited so brevity is encouraged.
A planning obligation program indicating the allocation of funds to mni~ f,beses of project development, i.e. preliminary engineering, right-of-
way and conslructlon. Show the funding amount for the enlire phn . Iir phases in the expected year ot expenditure even though Ihe
expenditure of funds may take place over several years.
loci,de all proposed projects regardless of location of source of fundry, however, urban end rural criertel trusl fund projects need Io be
included ~ In six-year trensporletion improvemenl progress beginning in od~d numbered years.
Show the amount of Federal funds to be obligeled in the appropriate column of Ihe Federal Obllgelton Plan.
Complete the form for the six-year program In accordance with the following instrucllons:
HEADING
City/County: ................. Enter name ot local agency end appropriate county.
Co,sty Number: .............. Enler the O.F.M assigned number In code blocks.
City Number: ................ Enter Ihe O.F.M. assigned number In code blocks.
Hearing Date: ................ Enter Ihe data of action by the City Council or County Legislative Aulhorlly.
Adoption: ................... Enter Ihe dale of action by the City Council of County Legislative Aulhorlly.
Rosefulton Number: ........... Enter City Council or Co. Legislalive Auth. resolullon number (if applicable).
COLUMN NO.
f
g fhru 12
13
14 Ihru t6
18
19 & 20
Funcllon81 Classification .... Enter Ihe appropriate two digil code denoting the Federal Functional Claeslffcallons (Note:
The Federal Functional Clasalticetione shown on the official funclionel cleenitloation maps
prepared by WSDOT,)
Rural (under 5,O00) Urban (Over 5,0(30)
Code Code
Block Block
1 2 DescrIption I _2 DesCripf!o__.n
~ ~ Principal Arterial--Interstate I f Principal Arterial--lnterslele other Freeways
0 2 Principal Arterial--Other (Slate) I 2 Principal Arterial--or Expressways
0 6 Minor Aderlal I 4 Principal Arterial--Other (FAM)
0 7 Major Collector (FAS) 1 6 Minor Arteriel--(FAM)
O 8 Minor Collector t 7 Collector-(FAM)
O g Locnl (Access) I 9 Local--(Access)
(Note: It Rural or Urban Arterial Trust Funds (Col. 15) are Io be used su funding source, the epproprlele code number must be shown.)
,Priority No .............. Enler local agency project identtlying numbers in priorily order.
Project Identification ....... Enter appropriate information noted.
Major Class of Work ...... Enter the appropriate code number(s).
f. N~w construction on new alignment 6. Traffic control
2. Major widening (additional lanes) 7. Capilel purchases
3. Minor widening (incrnase lane width, add shoulders) 8. Non capital improvemania
4. Rehabildalion/reconslruclion g. Non motor vehicle use
5. Resurfacing
tO. Trotnell Capital Project
I I. Transit Operaling Project
t2. Tranait Planning project
Work Codes ............. Enter appropriele code lollarts).
A. Grading L. Bridge
B. Draining M. Landscaping
C. Light Bituminous Surface N. Paths & Trails
D. A.C. or P.C.C. Pavement O. Bikeways
E. Sealcoat P. Transil Facility
F. Curbs & Gullera Q. Cur/Van Pool Program
G. Sidewalks R. Hi~Jh Occupancy Vehicle Lanes
H. Channelizalion S. Surveillance Cooltel & Driver Information
I. Signalizelion T. Ferry Facilily
J+ Lighting U. Projecl Studies
K, Signing
Telel Lenglh in Miles ...... Enter Length el project to nearest hundredlh.
Carryover Project ......... Enter (x) if project is carried over from previous year. (Funds were planned for expeedllure
but were not expanded during previous year.)
Funding Stalus ........... Use 1he lunding code thai best describes the likelihood glibis project being co~slrucled,
F. Funded
P. Proposed for Funding,
U. Funding is Unknown
(let, 2nd, 3rd, 4, 5 & 6th yearn) ............ Enter the estimated project cents (In thousands el dollars) planned
expendilure in each year.
Total Funds ............. Enter telel project cost, (This should equal Col. 9-12. It should also equal Cot. 14-16.)
Funding by Source ........ Enler the dollar amount (in thousands of dollars) planned to be programmed under the appli-
cable funding source column in appropriate coding blocks. (1he Federal programs require
completion of Federal Obligation Plan, Columns 18 thru 20.)
Utility Codes ............ Enter the eppropriufe code letter(s) for the utilities thai would need to be reloceted of ere
impacted by proposed construction of Ihe project.
C. Cable (TV)
G. Gas
P. Power
T. Telephone
S. Sewers (Other than Agency Owned)
O. Olher
Federal Project No ...... A.(4) ..... Program=aReS, aRM, BRS, RS, M, HES, RRP, RRS, sic.
(xxxx-xxxx-xxx) ....... B.(4) ....... Roule=Federal Route Number.
( A - B - C ) ....... C.(3) ....... Sequence=Assigned al fund approval stage by Slate Aid.
Federal Funding Obligation
......... RIW
......... Coast
Enter the amount (in Ihouaends el dollars) of Ihe proposed Federal
funds to be obligated in lhe approprtnle columrt. (This ilem should nol
include any phases fo~ which Federal funds have already been autho-
rized.)
(Same an P.E,)
(Same as P.E.)
C3
~ n 7
D 0
~ 0 D
~ n 0
· '~ 0 c~
LU 13 IJ.I
I ~ rr
~:dd
Z Z Z
0 F.-
0 F~ Z
~ :D
>' 0
I--
j
o .~o~zTr~ =
~ m ~
o 6 o Q
NOTE:
INSTRUCTIONS FOR PREPARING SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM
This form Is set up in "Pica*' typewriter format (10 characters per inch) for coding computer input, Computer Space for the description of
work is limited so brevity is encouraged,
A planning obligation program indicating the allocation el funds to mni~r s,hases of project development, i.e, preliminary engineering. fight*of*
way end construcllon. Show the luridlog amount for the entire php · ,It phases in the expected year of expendllure eves though Ihe
expendilure of funds may take place over several years.
Include all proposed projects regardless el location or source of funds, however, urban and rural arterial trust lund projecla need Io be
included ~ In six*year hansportellon improvement programs beginning in odd numbered years,
Show the amounl of Federal funds to be obligated In the appropriale column el Ihe Federal Obligation Plan.
Complele Ihe form for the six-year program in accordance with the following instructions:
HEADING
City/County: ................. Enter name of local agency and appropriate county.
Counly Number: .............. Enter the O.F.M assigned number In code blocks.
City Number: ................ Enter the O.F,M. assigned number In code blocks.
Hearing Date: ................ Enter the date el action by the Cily Council or County Legislative Authority.
Adopllon: ................... Enler Ihe date of action by the Cily Council or Counly Legielallve Aulhority.
Resolution Number: ........... Enler City Council or Co. Legislative Auth, resolution number (il applicable).
COLUMN NO.
t
P thru 12
13
t4 thru t6
17
18
19 & 20
Funcllonal Claseiflcallon .... Enter the appropriate two digit code denoting the Federal FUnctional Claaslflcallona (Note:
The Federal Functional Classifications shown on the official lunctional claeeiflcellon map8
prepared by WSDOT,)
Rural (under B.OO0) Urban (Over 5,000)
Code Code
Block Block
I 2 Description t 2 Description
~ I Principal Artertal~lnleralate ~ ~ Principal Arterial--Interstate Other Freeways
0 2 Principal Arterlel--Olher (State) t 2 principal Arterial--or Expressways
0 6 Minor Aderlel f 4 Principal Arterial--Other (FAM)
0 7 Major Coilenter (FAS) t 6 Minor Arteriat--(FAM)
0 8 Minor Collacier 1 7 Collector-(FAM)
0 g Local (Access) 1 g Local--(Accegs)
(Note: If Rural of Urban Arterial Trust Funds (Col. 15) ere to be used es funding source the appropriate code number must be shown,)
priority No .............. Enter local agency project identifying numbers In priority order.
Project Identilicetion ....... Enter 8pproprlele informalion noted,
Major Class of Work ...... Enter the appropriate code number(s).
1. New construction on new alignment 6. Trefflc control
2. Major widening (additional lanes) 7. Capital purchases
3. Minor widening (increase lena width, add shoulders) 8, Non capilal improvements
4. Rehabilitation/reconslruction 9. Non motor vehicle use
5, Beautracing
I0. Transit Capilal Project
t I, Transit Operating ProJecl
12. Transit Planning ProJecl
Work Codes ............. Enter appropriate code letler(s).
A, Grading L. Bridge
B. Draining M. Landscaping
C. LIghl Bituminous Surface N. Palhe & Trails
D, A.C, or P.C,C. Pavement O. Bikeways
E. Sealcoat P. Transit Facility
F. Curbs & Gullets Q Car/Van Pool Program
G, Sidewalks R. Righ Occupancy Vehicle Lanes
H. Chennelizalion S, Surveillance Control & Driver Information
I, SignelizaBon T. Ferry Facility
J, Lighting U, ProJecl Studies
K, Signing
Total Length in Miles ..... Enler Length el project to nearest hundredth.
Carryover Project ........ Enter (x) if prolecl is carried over Ires previous year. (Funds were planned Ior expenditure
but were not expanded during previous year,)
Funding Sialus ......
F, Funded
Proposed for Funding.
U. Funding is Unknowe
.... Use Ihe lunding code that best describes the likelihood el this project being constructed.
(tel, 2nd, 3rd, 4, 5 & 61h years) ............ Enter the estimated project costs (in Ihousands el dollars) planned lot
expendituru in each year.
Told Funds ............. Enter Iolal project cost. (This should equal Col. 9-12. II should also equal Cd. 14-16.}
Funding by Source ........ Enler the dollar amount (in Ihousends of dollars) planned Io be programmed under Ihe appli-
cable funding source column in appropriate coding blocks, (The Federal programs require
completion of Federal Obligation Plan, Columns 18 Ihru 20.}
Ulility Codes ............ Enter the appropriate code letter(a) for the utilities that would need to be relocated or ere
'impacted by proposed construction el Ihe project.
C. Cable (TV)
G. Gas
P. Power
T, Telephone
S, Sewers (Other Ihen Agency Owned)
0, Other
Federal Project No ...... A.(4) ..... Program=aReS, aRM, RRS, R~, M, HES. RRP, RRS. etc.
(xxxx-xxxx-xxx) ....... B.(4) ....... Route=Federal Route Number.
( A - B , C ) ....... C.(3) ....... Sequence=Assigned at fund approval stage by State Aid.
Federal Funding Obligelion .......... P.E. = Enter the amounl (in thousands of dollars) of the proposed Federal
funds to be obligated in Ihe appropriate col,an. (This Item should not
include any phases Ior which Federal funds have already been lulho-
rlzed.)
.......... RIW = (Same as P.E.)
.......... Conet = (Same as P.E.)
C3
I- Z
0 Z
0
Z ~
i- .J
G. 0
0 uJ
b] '~ CO
.H
~dd
Z Z Z
0 ~- I-
>' 0
NO TE:
INSTRUCTIONS FOR PREPARING SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM
This form is set up in "Pica" lypewriler format ( I0 characters per inch) for coding computer input. Computer space for the deacriplion of
work i9 limited so brevily is encouraged.
A planning obligation program indicating Ihe allocation el lunds to mni~r i,hases el projecl developmeal. Le. preliminary engineering, right-or-
way end conalructlon. Show the lundtng amounl for the entire phi, ,it phases in the/1xpecled year of expenditure even though the
expenditure of funds may take place over sever/11 years.
Include all proposed projects regardless of location or source of hmd~, however, urban end rural arterial trust tund projects need to be
included only In 91x-year transportation improvemeal progress beginning in od~d numbered years.
Show the amount of Federal funds to be obligated in Ihe appropriate column of Ihe Federal Obligation Plan.
Complete the form for the six-year program In accordance wilh the following instructions:
HEADING
CitytConnty: ................. Enter name of local agency and eppropriale county.
Connly Number: .............. Enter Ihe O.F.M. assigned number in code blocks.
City Number: ................ Enler Ihe O.F.M. asuigned number in code blocks.
Hearing Dale: ................ Ealer Ihe date of aceion by the City Council or County Legislative Authority.
Adoption: ................... Ealer Ihe dale of action by Ibe Cily Council or County Legislalive Aulhority.
Resolution Number: ........... Enler Cily Council or Co. Legislative Auth. resolulion number (it applicable).
COLUMN NO.
g lhru 13
13
14 thru 16
19 & 20
Functional Classification ....
Enter the appropriate two digit code denoting the Federal Functional Classifications (Nole:
The Federal Functional Clesuificelionu shown on the official functional ole/1slllc/1tlon maps
prepared by WSDOT)
Rurel (under 5,OO0) Urban (Over 5,000)
Code Code
Block Block
t 2 Description _1 2
~ '~ Principal Arlerlel--lnleratste I 1
0 2 Principal ArleriaI--Other (Stele) I 2
0 6 Minor Aderlal I 4
0 7 Major Colicclef (FASt I 6
O B Minor Collector f 7
O g Local (Access) f 9
Descfiplip.n
Principal Arterial--Interstate Other Freeways
Principal Arlerial--or Expressways
Principal Ariafief--Other (FAM)
Minor ArIeriRI--(FAM)
Colleclor-(FAM)
Locel--(Access)
(Note: It Rural or Urban ArterlRI Trusl Funds (Col. 15) are to be used as lundlng source, the epproprisle code number must be shown.)
Priorilx N~o: ............. Enter local agency projecl idenllfying numbers In priority order.
Project Identification ....... Enter appropriate inletmalign noled.
Major Class of Work ...... Enter the appropriate code number(9).
1. New construction on new alignmeal 6. Traffic control
2. Major widening (additional lanes) 7 Capital purchases
3. Minor widening (lucreasP lane width. add shoulders) 8. Non capital Improvementu
4. Rehabilltalion/reconstruc/ion 9. Non motor vehicle use
5. Resurfecing
tO. Transit Capital Projecl
I 1. Transll Operaling Projecl
12. T~ansil Planning Project
Work Codes ............. Enter appropriate code letler(9).
A. Gradinq L. Bridge
B. Draining M. Landscaping
C. Light Bituminous Surface N. Palbs & Trails
D. A.C. or P.C.C. Pavement O. Bikeways
E. Sealcoat P. Transit Facility
F. Curbs & GuRers O. Car/Van Pool Program
G. Sidewalks R. High Occup/1ncy Vehicle Lanes
It. ChennelizRfion S. Surveill/1nce Control & Driver Informalion
J. Lighting U. Project Studies
K. Signing
Total Length in Miles ...... Enter Length of projecl to nearest hundreffih.
Carryover Project ......... Enter (x) if projecl in carried over from previous year. (Funds were plnnned Ior expenditure
bul were not expanded during previous year.)
Funding Sialus ........... Use Ihe lunding code that beat describes Ihe likelihood of tblu proloci being conutrucled.
F. Funded
P. Proposed lot Funding,
U. Funding is Unknown
(1at, 2nd, 3fd, 4, 5 & 6th years) ............ Ealer the estimated project costs (in thousands of dollars) pl/1nned for
expenditure In each year.
Total Funds ............. Enler lotel project cost. (This should equal Col. 9-12. It should also equal Col. 14-16.)
Funding by Source ........ Enter the dollar amounl (in Ihousunds el dollars) planned to be pregrammed under the appli-
cable funding/1ource column in appropriate coding blocks. (1he Federal progress require
complelion of Federal Obligation Plan, Columns 18 thru 20.)
Ufilily Codes ............ Enter Ihe appropriate code letter(s) for Ihe ulililles thai would need to be relocated or ere
'impacted by proposed construction of the project.
C. Cable (TV)
G. Gee
P. Power
T. Telephone
S. Sewers (Other Ihsn Agency Owned)
O. Olher
Federal Project No ...... A.(4) ..... Program=aReS, aRM, BRS, RS, M, HES, RRP, RRS, sic.
(xxxx-xxxx-xxx) ....... B.(4) ....... Route=Federal Roule Number.
( A . B - C ) ....... C.(3) ....... Sequence=Assigned el lund approv/11 siege by Stele Aid.
Federal Funding Obligatio~n .......... P.E. = Enter the amount (in Ihousends of dollars) of the proposed Federal
funds to be. obligaled In the appropriate column. (This Item should/Iol
include any phases lot which Federal funds have already been/1ulho-
rized.)
.......... R/W = (Same ms P.E.)
.......... Consl = (Same as P.E.)
DOT ~40.04g (BACK) QX A.250
uJ I- Z
.,~ O Z
13 Z 0
Z F- _J
rr n 0
· '~ 0 ~
ILl n UJ
'T ..~ rr'
>' d d
7 Z- Z
(J D 7
>' O
o
z
.-,,
Ci