STAFF REPORTCITY OF BAINBRIDGE ISLAND DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT STAFF RECOMMENDATION Date: January 25, 2017 To: Stafford Smith, Hearing Examiner From: Kelly Tayara, Associate Planner Project: Montessori Country School File No: PLN 17677 SPR / CUP Applicant: Montessori Country School 10994 Arrow Point Drive NE Bainbridge Island, WA 98110 Request: Increase campus student population from 83 to 146 and staff from 10 to 18. Construct six new buildings (in addition to the existing building), expanding floor area from 3,550 square feet to 11,853 square feet. Modify existing parking lot and access drive dimensions. Location: 110994 Arrow Point Drive Consolidated Project Review: In accordance with regulations contained in BIMC 2.16.170, an applicant for a single project proposal requiring more than one of the land use applications identified in BIMC 2.16.010 may be processed under the consolidated project review process. The applicant requests consolidated review of the applications for Site Plan and Design Review and Conditional Use Permit. Public Notice / Environmental Review: A pre - application conference was held on October 20, 2015. A public participation meeting was held on January 4, 2016. Applications for Site Plan Review and Conditional Use Permit were received on June 15, 2016; the applications were deemed complete on July 5, 2016. Public meetings were also held before the Design Review Board and the Planning Commission. The project is subject to State Environmental Policy Act (SEPA) review as provided in Washington Administrative Code (WAC 197 -11 -800). Utilizing the optional DNS process provided in WAC 197 -11 -355, the City issued a combined Notice of Application /SEPA comment period on July 15, 2016. The 14 -day comment period ended on July 29, 2016; public comment is discussed in Section I.C. of this report. The City, acting as lead agency, issued a SEPA threshold determination for this proposal on December 21, 2016; the appeal period expired on January 4, 2017 and no appeals were filed. Montessori Country School PLN 17677 SPR /CUP Page 1 of 19 Recommendation: Approval of the request subject to the following conditions: SEPA CONDITIONS 1. To avoid impacts to vegetation, no construction activity shall occur in landscape buffers or within the critical root zone of significant trees within landscape buffers, including staging, storage, materials laydown, parking, construction vehicle turnaround, or equipment. 2. To avoid impacts to historic and cultural resources, work shall immediately stop if any historical or archaeological artifacts are uncovered during excavation or construction and the Department of Planning and Community Development and the Washington State Office of Archaeology and Historic Preservation shall be immediately notified. Construction shall only continue thereafter in compliance with the applicable provisions of law. PROJECT CONDITIONS The authorization for construction activities automatically expires and is void if the applicant fails to file for a building permit or other necessary development permit within three years of the effective date of the Site Plan and Design Review and Conditional Use permits except: The applicant must file for building permit to accommodate phased construction of building six within ten years of the effective date of this permit or the authorization to construct building six expires. 4. Construction plans shall substantially conform to plans submitted on June 15, 2016, except for modifications reflecting compliance with these conditions of approval, and except as follows: Sheet A -0.1 submitted on July 11, 2016; Sheets A -1.2, C1, C2, L1 and L2 submitted on January 24, 2017. 5. Prior to any construction activities, the applicant shall obtain the appropriate permits from the City of Bainbridge Island, including but not limited to clearing, grading, and /or building permits. 6. The project shall comply with the following conditions of the City Engineer: a. Final civil improvement plans shall be submitted with building permit application. Upon approval to construct, all necessary infrastructure serving the site must be completed prior to the first final building inspection. b. As -built civil construction plans stamped by a civil engineer shall be provided by the applicant prior to the first final building inspection. c. The preconstruction condition of Arrow Point Drive fronting the property shall be photo - documented to the satisfaction of the City Engineer prior to issuance of any permit. Prior to the final inspection of the final building damage to the road caused by heavy construction equipment and traffic shall be fixed by the permit holder. d. Shoulder improvements along the frontage of Arrow Point Drive are required as a condition of development to include construction of a three -to -five foot width gravel shoulder. e. Paved driveway aprons matching the surfacing on Arrow Point Drive shall be provided from the roadway for a distance of 20 feet from the edge of the Arrow Point pavement. f. A maintenance plan for the internal roadway and parking lot is required with the first building permit. Track -out of dirt and silt from the site onto the roadway is not allowed. Cloudy runoff leaving the site is not allowed. Montessori Country School PLN 17677 SPR /CUP g. All on -site stormwater facilities shall remain privately owned and maintained. 1) The applicant shall submit an operation and maintenance plan for the on -going maintenance of the storm drainage systems to the satisfaction of the City Engineer with the first building permit application. 2) Annual inspection and maintenance reports shall be provided to the City. 3) A recorded Declaration of Covenant for Stormwater System Operation and Maintenance will be required prior to the first final building inspection. The approved language for the Declaration of Covenant is found in BIMC Chapter 15.21, Exhibit A. h. Prior to the first final building inspection the applicant shall provide a recorded covenant protecting the forested area as identified in Sheet C2 Utility and Drainage Plan submitted to the City on January 24, 2017. 1) The covenant should be carefully worded to allow for installation and maintenance of stormwater facilities and drainfield facilities which are within the area proposed for retention of significant trees and understory. A right -of -way construction permit is required prior to any construction activities within the right -of -way and is subject to separate conditions and bonding requirements. j. A Stormwater Conveyance System Connection Application shall be submitted with the right -of- way construction permit application for locations where stormwater will enter the City system. k. The project requires a Construction Stormwater General Permit from the Washington State Department of Ecology. No land clearing or construction permits shall be issued prior to obtaining the State permit. 7. The project shall comply with the following conditions of the Fire Marshal: b. The project shall be equipped throughout with a monitored fire alarm system. c. All classrooms shall exit directly outside. d. Occupant load shall be determined by the Building Official. e. Any building or room with an occupant load greater than 50 shall be equipped with an automatic fire sprinkler system and panic hardware on approved exit doors. f. All access roads shall be designed to accommodate fire apparatus (load, width, grade, angle of approach and departure). g. Minimum 12 -foot access road width shall not be diminished by parked vehicles. No Parking / Fire Lane signage is required in areas where this could occur. h. Fire lane on north side of property shall be marked 'No Parking / Fire Lane'. All fire apparatus access roads shall have a clear overhead height of not less than 13.5 feet. 8. Vehicle parking or standing, and / or construction staging, shall be prohibited within the right -of -way during the construction period unless specifically authorized by the Public Works Department. 9. A total of six bicycle spaces must be provided at a minimum. Bicycle facilities shall allow secure locking of both the frame and wheels of a bicycle. 10. With application for any construction activity, including grading and /or vegetation removal, the applicant shall provide plans that identify areas of prohibited disturbance which are necessary to preserve ecological function, including but not limited to: The dripline or critical root zone (as Page 3 of 19 identified by a consulting arborist) of significant trees, areas proposed for other retained vegetation, future raingarden areas, and future planting areas which are larger than 400 square feet in size. The plans shall label fencing required through these conditions of approval, along with any vegetation protection measures identified by the applicant's arborist. 11. Prior to permit issuance for any construction activity, fencing shall be erected and posted with signs to protect areas of prohibited disturbance. Protective fencing shall remain until construction is complete, and removal of any portion of the fencing is subject to approval of the Planning Division. a. Fencing materials and signage shall be approved by the Planning Division prior to installation. b. Temporary chain link fence a minimum five feet in height with tubular steel poles or "T" posts shall delineate the area of prohibited disturbance that lies within the perimeter boundary of the roadside buffer, the area of existing vegetation to be retained between the roadside buffer and the parking lot, and the interior landscape perimeter buffer adjacent to the southernmost parking spaces. The fencing shall be configured to provide for installation of the driveway, path and stormwater pipe through the buffer. Special care shall be taken to protect the significant trees and vegetation adjacent to the driveway. c. Orange plastic fencing shall delineate the perimeter landscape buffer adjacent to the proposed primary drainfield. 12. Roadside and perimeter landscape buffers shall be maintained for the life of the project: At a minimum, roadside buffers shall meet the full- screen standard and perimeter buffers shall meet the partial screen standard of BIMC 18.15. 13. New plantings shall be the following heights at time of planting: Evergreen trees shall be not less than six feet in height; Deciduous trees shall be not less than two -inch dbh; Evergreen shrubs shall be not less than 18 inches in height. 14. All plantings shall be installed or installation financially assured in accordance with BIMC 18.15.010.H. prior to occupancy of any of the new buildings. Subsequent to installation approval by the Department, maintenance assurity shall be required in accordance with BIMC 18.15.010.H. 15. Internal walkways shall be surfaced with nonskid hard surfaces, meet handicapped - accessibility requirements and be designed to provide a minimum of five feet of unobstructed width. 16. Where walkways cross vehicular driving lanes, the walkways shall be constructed of contrasting materials or with maintained painted markings. The walkway adjacent to the pick -up / drop -off lane shall be curbed and raised six inches above adjacent vehicular surface grade, except where required to meet accessibility standards. 17. Raised curbs shall be used to define driveways from the public right -of -way, landscape areas within the parking lot, the ends of parking aisles, and the vehicular circulation pattern. 18. Outdoor lighting fixture shall meet the standards contained in BIMC 18.15.040. 19. Outdoor trash / recycle receptacles shall be enclosed with a solid structure / gated and screened from view with evergreen vegetation. 20. Prior to building permit issuance, the landowner must record a notice on title listing these conditions of approval with the Kitsap County Auditor. Pz:,ge 4 c t 13 Staff Analyses I. Findings of Fact A. Site Characteristics 1. Tax Assessor Information: a. Tax Lot Number: 172502 -1- 087 -2000 b. Owner of record: Montessori Country School c. Lot size: 4.38 acres d. Land use: Community and Educational / Educational Facility 2. Background The Montessori Country School is a non - profit private school that is currently located on two campuses. The school requests approval to expand the Arrow Point Drive campus in order to serve the entire student population on one site. In 1990, the school received approval from Kitsap County for a revision to an Unclassified Use Permit, approving two preschool sessions per weekday with a maximum of 34 students per session, and an elementary program with a maximum of 30 students (a total of 98 students). Montessori Country School PLN 17677 SPR /CUP Page 5 of 19 3. Zoning and Comprehensive Plan Designation: The subject property is within the R -1 district and the Open Space Residential (OSR -1) designation. The properties to the north and east are also zoned R -1 and the Comprehensive Plan Designation is OSR -1. The properties to the west, across Arrow Point Drive, and to the south are zoned R -0.4 district and the Comprehensive Plan designation for these properties is OSR -0.4. 4. Existing Development: The property contains a private school campus with a school building and associated development including a parking lot and playground. The property to the north is undeveloped. The property to the east contains single - family residential development. The property to the west is a public park (Battle Point Park). To the south, both properties contain single - family residential development. 5. Access: Vehicular access is provided from Arrow Point Drive via a one -way loop. 6. Soils and Terrain: Site soils are composed of ice - contact deposits overlying Vashon till. The existing school building, parking lot and playground are located in the southwest portion of the site and the existing septic system is located in the southern portion of the site. The remainder of the site is heavily wooded with second growth forest. The topography of the west third of the site is relatively flat. The remainder of the site slopes from west to east with inclinations ranging from 10 to 40 percent. A small area in the middle of the site contains a slope that exceeds 40 percent. The area has no individual section greater than ten feet in height. The geotechnical reconnaissance indicates that this slope is relatively stable, no groundwater seepage was observed, and no adverse geologic strata sequence was evident. The geotechnical engineer concluded that there are no geologically hazardous areas. 7. Public Services and Utilities: a. Police: City of Bainbridge Island Police Department b. Fire: Bainbridge Island Fire District c. Water: On -site Well d. Sewer / Septic: On -site Septic e. Storm drainage: On -site dispersion is proposed for the east side of the site, and on -site detention for the west side. B. Comprehensive Plan Goals and Policies 1. Land Use Element a. Historic Preservation - Goal 3 Archaeological resources should be identified, preserved, and / or left undisturbed. Should any historical or archaeological artifacts be uncovered during excavation or construction, project work must stop and the applicant must notify the Department of Planning and Community Development and the Washington State Office of Archeology and Historic Preservation. (Condition 2) Montessori Country School PLN 17677 SPR /CUP 'age 6 of 19 2. Economic Element a. Economic Element - Goal 1 Retain and enhance a diversified local economy. The City should embrace diverse and innovative business opportunities compatible with the community and develop programs to make Bainbridge Island an attractive location for those businesses. The redevelopment provides for expansion of a private not - for - profit elementary and pre - school educational facility. b. Economic Element - Goal 5 Encourage a broad range of civic activities and organizations. Support the non - profit sector of human and social service providers. The school partners with One Call for All, an umbrella organization that provides funding to over 100 Bainbridge Island non - profits. The school also supports Raising Resilience, a non - profit which offers parenting education and resources, and lends space to provide parenting classes that are open to the general public, as well as meeting space for the Resilience Guild. Additionally, the school dedicates ten percent of its budget to student financial aid. Montessori Country School students and staff participate in a variety of community service activities including food drives and visits to local assisted - living facilities. The school provides volunteers for the Friends of the Farm annual harvest fair, an educational event that celebrates local farming, and the Bainbridge Island Rotary Club annual auction, an event that last year raised over $557,000 to fund local nonprofit organizations, community service and international humanitarian projects and vocational scholarships. 3. Cultural Element a. Arts Education - Goal 2 Demonstrate commitment to quality arts education and lifelong learning by advocating for comprehensive inclusion of the arts in our schools and community settings. Support a comprehensive quality arts education program in the schools and the community. The development provides for expansion of the existing music and art program. The redevelopment affords a building dedicated to the fine arts, and the new commons building provides room for music classes. b. Humanities - Goal 7 Foster the spirit of community in which the richness of human experience is explored and nurtured through ongoing analysis and exchange of ideas about the relation to self, others and the natural world. The school relies on the natural environment to address Montessori education principles and methods. The Montessori program responds to individual stages of child development by providing carefully prepared environments and experiences that meet students' needs. Montessori Country School PLN 17677 SPRtCUP Par 7 c" S The project emphasizes outdoor spaces and the discovery of the natural world. For example: The proposed development provides playgrounds with all- natural materials, a campus with trails through a natural environment, and the school relies on its proximity to Battle Point Park to further interaction with the natural environment; Buildings are oriented to capture natural light and are designed to avoid competition with the natural setting. C. Public Comment Two public comments were received: 1. One commenter requested assurance that the well, septic and stormwater facilities are adequate to serve the project and avoid impacts to neighboring properties and the shoreline. Additionally, the commenter stated that there may be a small wetland in the woods on the property south of the subject property. As originally proposed, stormwater was directed to an off -site stormwater pond with outfall to the Puget Sound; as this is prohibited in the Shoreline Master Program (largely because of the category of aquatic environment), the applicant revised the stormwater plan. The City Engineer finds that the revised plan conforms to surface and stormwater requirements, will not cause undue burden on the drainage basin, and will not unreasonably interfere with the use and enjoyment of properties downstream. The Health District approved the application, and finds proposed water and septic facilities adequate to serve the development. Staff observed no wetland on the neighboring property. 2. One commenter expressed concern that the increase in students increases the risk of groundwater and aquifers depletion or contamination. Additionally, the commenter stated that noise levels emanating from the children's play area may potentially impact telephone conversations held in a virtual office located within a residence which is adjacent to the subject property. The project requires upgrades to the on -site water system. The Kitsap Public Health District reviewed the applications for Site Plan and Design Review and Conditional Use Permit and recommends approval. Building occupancy is subject to County Health District approval: Upon installation, the water system must be inspected and approved by both the Washington State Department of Health Office of Drinking Water and the County Health District prior to occupancy. The commenters' residence was constructed in 2015. The existing play area on the subject property is 170 feet from the commenters' residence. No change to the play area or playground equipment is proposed within 270 feet of the residence; the proposed development adds two play fields beyond that distance. Based on the comment letter, current playground activities are not disruptive, but noise levels resulting from the redevelopment could potentially impact the commenters' business conversations. As there is no change proposed to playground equipment or play area within 270 feet of the home, and additional equipment and play fields are proposed outside that distance, one may reasonably conclude that the existing play area and equipment that lies between 170 and 270 feet of the residence will support the same number of users subsequent to redevelopment. Additionally, there is a vegetated swath 55 feet in width between the play area and the commenters' property, and an additional 25 foot width vegetation buffer on the commenters' property. Noise levels exceeding 70 decibels are loud enough to be considered annoying, intrusive, and interfere with telephone use. By comparison, the sound of a dishwasher is 80 dba at a distance of 16 feet; 70 dba is the sound emanating from a freeway at a distance of 50 feet. Noise levels of children on playgrounds can approach 115 dba, equivalent to the level of noise experienced standing three feet from a power mower.' Decibel levels are reduced by approximately 6 dba for every doubling of the distance from the noise source: At a distance 200 feet, sounds emanating from play areas are reduced to less than 85 dba. The exterior walls of a home typically provide noise level reduction of 25 — 30 dba, reducing the sounds from the play areas to 60 — 65 dba inside the residence, the level of noise typical for an office environment and below noise levels considered to interfere with telephone conversations.2 While staff encourages the applicant to be a good neighbor and to exercise a reasonableness standard in supervising play activities, the expected noise levels within the home office are within acceptable limits. D. Agency Comment The Kitsap Public Health District approved the application, and subsequent building permits are subject to Health District approval. The Bainbridge Island Fire District approved the project as conditioned. (Condition 7) E. Land Use Code Analysis 1. BIMC Title 18 Zoning a. BIMC 18.09.020 Use Table Educational facilities are conditional uses in the R -1 district, and shall be processed as major conditional uses in residential zones (BIMC 18.09.030). Kitsap County granted an Unclassified Use Permit to the Montessori Country School in 1990. The private school serves preschool and elementary -age children. This application includes a request to amend the existing Conditional Use Permit. b. BIMC 18.12.020 -2 Standard Lot Dimensional Standards for Residential Districts i. Lot Size, Lot Coverage and Building Height Requirements Minimum lot size is 40,000 square feet in the R -1 district, and minimum lot width is 80 feet. Lot coverage is the portion of the lot area that may be covered by buildings (BIMC 18.12.050.K). Maximum lot coverage for lots in the district is 15 percent provided, institutions located in residential districts may not exceed 50 percent of the allowable lot coverage (i.e. 7.5 percent). Maximum building height is 30 feet. The lot is 4.38 acres in size, and therefore meets the minimum lot size requirement. The lot width well exceeds the required 80 feet. Proposed lot coverage is 13,660 square feet 7.1 percent of lot area, and therefore meets this requirement. All existing and proposed buildings are less than 30 feet in height. Montesson Country School PLN 17677 SPR, CUP Page 9 of 19 ii. Setbacks The front lot line setback is a minimum of 25 feet. The minimum side setback is ten feet, and side setbacks must total 25 feet. The rear lot line setback is a minimum of 15 feet. A portion of the existing school building that is less than 70 square feet in size encroaches up to three feet into the side setback along the south property line. All other existing or proposed structures within the setbacks such as fencing and walkways are permitted setback modifications as provided in BIMC Table 18.12.040. All proposed buildings are well outside required setbacks. c. BIMC 18.15.010 Landscaping, Screening, and Tree Retention, Protection, Replacement Tree Retention, Protection and Replacement 1) Perimeter Buffering and Screening A 25 foot width full screen buffer is required along the perimeter of the property for non - residential use in residential districts; this buffer may be averaged to provide not less than a ten foot width to accommodate a unique situation, such as continuation of an existing use. A 25 foot width partial screen is required along rights -of -way; this buffer may be averaged to provide not less than a 15 foot width. The site must have at least 40 tree units per acre following redevelopment; trees within required landscape buffers do not count toward the tree unit requirement (BIMC 18.15.010.G.4). The perimeter buffer is averaged as permitted in the municipal code. Buffer widths along the northwest and southwest are reduced in three locations from the required 25 feet to 15 feet, a total reduction of 7,650 square feet. Buffer widths are increased along the northeast, southeast and east property boundaries to provide a contiguous 35 foot width boundary, a total increase of 8,700 square feet in size. The averaging takes into account existing development within the required buffers, including parking areas, a portion of a building, and fencing around the play area along the south boundary, and also provides for utilities along the north boundary. The project is conditioned to maintain the buffers for the life of the project. (Conditions 12,14) The development is required to provide 177 tree units (40 * 4.42 acres), exclusive of trees within the landscape buffers, to meet the tree retention requirements of BIMC 18.15. The tree retention schedule (Sheet L -2) demonstrates that the project provides 199 tree units. 2) Parking Lot Landscaping Parking lots adjacent to the right -of -way must provide one tree for every four parking stalls; a minimum of 30 percent of the trees must be evergreen. Deciduous trees must be at least two -inch caliper and evergreen at least six feet high at time of planting. Evergreen shrubs must be at least 18 inches in height _ Page 10 of 19 at time of planting and spaced no more than three feet on center to provide a continuous hedge. Evergreen ground cover must be planted and spaced to achieve total coverage within two years. The parking lot must provide a landscaped area at the end of parking aisles. The proposed landscaping configuration provides adequate room to screen parking from the right -of -way and provides landscape islands to separate parking stalls. The project is conditioned to ensure plant size requirements at time of planting. (Condition 13) 3) Protection during Construction In order to preserve future ecological function, the applicant shall identify areas of prohibited disturbance, generally corresponding to the dripline or critical root zone (as identified by a consulting arborist) of the existing vegetation, trees and /or tree canopy of tree stands to be retained, buffers, areas of existing vegetation to be maintained, future rain gardens, and future planting areas larger than 400 square feet (i.e. landscape islands in parking lots). A temporary five -foot high chain link fence with tubular steel poles or "T" posts shall delineate the area of prohibited disturbance, identified in the above paragraph, unless the Director approves use of a four -foot high plastic net fence as an alternative. The fencing must be posted with signage denoting the vegetation protection area. No impervious surfaces, fill, excavation, vehicle operations, compaction, removal of native soil or storage of construction materials shall be permitted within the area defined by the required construction fencing. If construction and compaction in future planting areas is unavoidable, the landscape plan for the project shall include methods for aerating and /or augmenting compacted soil to prepare for new planting. The project is conditioned to identify areas of prohibited disturbance, and to adequately protect those areas which are in proximity to construction activities with fencing and signage. (Conditions 10,11) d. BIMC 18.15.020 Parking Spaces Required Elementary school must provide one space per 50 students and one space per employee. Parking lots must comply with State minimum requirements for handicapped - accessible parking spaces. Above - ground parking lots exceeding the number of spaces required by this section are not allowed unless approved by the Planning Commission. The proposed development serves 146 students and 18 staff. The required parking is 21 spaces. The proposed parking lot provides 26 spaces, including one handicapped - accessible parking space. Additionally, to accommodate all- school event parking, such as an open house, the school has a parking agreement with the Bainbridge Island Metropolitan Parks District to use the parking facilities at Battle Point Park which lies across Arrow Point Drive. The Planning Commission recommended approval of the parking facilities as proposed. Montessori Country School PLN 17677 SPR /CUP e. BIMC 18.15.030 Mobility and Access i. Circulation and Walkways for Non - residential Development Parking lots and driveways shall provide well- defined, safe and efficient circulation for motor vehicles, bicycles and pedestrians. Entrances from the right -of -way, ends of parking aisles and the circulation pattern shall be defined by landscaped areas with raised curbs. Pedestrian walkways should be provided around buildings to assure safe access. Internal walkways shall be surfaced with nonskid hard surfaces, meet accessibility requirements and provide at least five feet of unobstructed width. Walkways that cross driving lanes shall be constructed of contrasting materials or maintained painted markings. Walkways must be curbed and raised six inches above adjacent vehicular surface grade, except where the walkway crosses vehicular driving lanes or to meet accessibility standards. The project provides pedestrian access from Arrow Point Drive through the parking lot and an additional pedestrian access from the parking lot, both connecting to the internal sidewalk that fronts the buildings. A dedicated drop -off / pick -up lane allows students to exit directly onto the internal sidewalk, avoiding interaction between students and vehicles in the parking lot. Walkways and decks provide pedestrian connectivity between buildings. The project conditions provide appropriate curbs, walkway dimensions and surfacing. As determined by the City Engineer, the streets and pedestrian ways that serve the site are well - defined, safe and efficient. (Conditions 4,8, 15 -17) ii. Bicycle facilities The development must provide one bicycle space for every five vehicle parking spaces, with a minimum of four spaces provided for each parking lot. A bicycle rack is proposed on the southeast side of the parking lot. Based on the number of vehicular parking spaces, six bicycle spaces are required. The project is conditioned to provide six bicycle spaces at a minimum. (Condition 9) f. BIMC 18.15.040 Outdoor Lighting All outdoor lighting must result in no light trespass. Outdoor lighting must be shielded and aimed downward, with no escaping direct light permitted to contribute to light pollution by shining upward into the sky or onto adjacent properties. Spotlighting on landscaping and foliage is limited to 150 watts incandescent (2,220 lumens output). Outdoor lighting is proposed on buildings and along walkways. As proposed, the lighting meets regulations. The project is conditioned to demonstrate compliance with these regulations at time of building permit application. (Condition 18) g. BIMC Chapter 18.18 Design Guidelines The project is subject to the General and Commercial and Mixed Use Guidelines. The Design Review Board reviewed the proposal and unanimously recommended approval. $c tvri f't f. v Cli t'I PI.{ i.76'77 SI ! ' i. Site Design. Create small parking clusters connected by vegetated landscaping and pedestrian walkways. Parking lots should be located behind or to the side of buildings. Pedestrian walkways should offer connections to adjoining properties. Exterior lighting should not exceed 14 feet in height and should incorporate shields. Trash containers should be shielded from view. The redevelopment provides a 25 -foot width vegetated buffer from Arrow Point Drive, and the parking lot lies between the buffer and the buildings, which are set back at least 80 feet from the right -of -way. Parking facilities are located in a manner that provides appropriate separation between vehicular traffic and the campus. The parking lot is comprised of grouped spaces which are separated by landscape areas. Pedestrian walkways provide internal connection between the buildings and between the parking lot and the buildings. The development provides numerous outdoor spaces, including playgrounds, play fields and trails; while most are oriented behind the buildings to serve the student population, one courtyard features prominently in front of the buildings and is the terminus of the pedestrian walkway connection to Arrow Point Drive. The proposed outdoor lighting appears to meet design guidelines, and the project is conditioned to demonstrate compliance with regulations at time of building permit application. Trash containers are located in the southeast corner of the parking lot and the proposed screening appears to meet design guidelines; the project is conditioned to demonstrate compliance with this guideline at time of building permit application. (Conditions 12, 19) ii. Building Design. Buildings should utilize elements such as massing, materials, windows, canopies, and pitched or terraced roof forms to create a visually distinct base and cap. Building materials and patterns should be varied to produce variations in texture. Building elevations shall be vertically and horizontally modulated to avoid massive scale. Facades facing public ways shall incorporate setbacks or articulation, and shall include features such as columns or recessed entries. Blank walls shall not be visible to public spaces. Building designs should respond to nearby buildings by using shared elements, materials or massing. Principal entrances should be visually prominent and incorporate elements such as setbacks, recesses, and porches. Rooftop mechanical equipment should be concealed by and integrated within the roof form. The architect's goal is to create a campus that exemplifies environmentally aware building practices and design. Buildings are oriented to capture natural light and provide views of the outdoors. Building materials include natural wood siding, corrugated metal, cement board, recycled wood trim and decking and reclaimed timber. All buildings are single story, and no blank walls are proposed. Covered walkways, porches and canopies afford protection from the elements. The visitors' entrance to the campus is located within the office / commons building; the walkway from the parking lot leads to this entrance, and the entrance is prominently marked with signage. No rooftop mechanical equipment is proposed. M me son Country School PLN 17677 SPR /CI. P Pa,,,,r: 13 Of ].g 2. BIMC 2.16 Decision Criteria As conditioned, the development meets the decision criteria for approval; a. BIMC 2.16.040.E Site Plan and Design Review — Decision Criteria The Director and Planning Commission shall base their respective recommendations on the criteria below. The Planning Commission held a public meeting on January 12, 2017 to review the proposal. The Commission unanimously recommended approval provided: That the applicant provide a diagram to show where chain link versus orange netting (for vegetation protection) will go; That the requirement for chain link versus orange netting be left to the discretion of the Director; That the protective covenant for forested areas associated with stormwater (referred to in Condition 6h) include the drainfield areas (staff's recommendation to the Commission included a condition requiring that the drainfield areas be excluded from the covenant). The project is conditioned to require a plan depicting the area of disturbance and protective fencing. (Conditions 10,11). The applicant revised the civil plan to exclude the area of the primary drainfield from the forested area which is retained to meet stormwater requirements (i.e. as opposed to vegetation retained to meet the landscaping requirements of the BIMC 18.15), and the project is conditioned to carefully word the covenant, as it is not expected that understory within the reserve drainfield area can be maintained if the reserve area is needed. (Condition 6). L The site plan and design is in conformance with applicable code provisions and development standards of the applicable zoning district. A portion of the existing school building encroaches into the side setback and is legally non - conforming to required setbacks. The project meets required lot size and lot coverage and building height requirements. Landscape buffer widths are averaged as provided in BIMC 18.15.010, and where necessary, the project is conditioned to specify vegetation protection. The project provides adequate parking facilities, including overflow parking for events. The redevelopment is conditioned to meet applicable design guidelines, and is conditioned to meet lighting regulations. (Conditions 1, 10 - 12,18, 19) ii. The locations of the buildings and structures, open spaces, landscaping, pedestrian, bicycle and vehicular circulation systems are adequate, safe, efficient and in conformance with the Non - motorized Transportation Plan. The project is conditioned to provide a shoulder facility along Arrow Point Drive as required in the Non - motorized Transportation Plan. The City Engineer finds that as conditioned, the project provides adequate circulation systems and is consistent with the Non - motorized Transportation Plan. (Condition 6) Monlessori Country School PLN 1 7677 SPRIII, -_ Oage 14 of .19 iii. The Kitsap County Health District has determined that the site plan and design meets the following decision criteria: The proposal conforms to current standards regarding domestic water supply and sewage disposal. The Kitsap Public Health District approved the proposal. iv. The City Engineer has determined that the site plan and design meets the following decision criteria: The site plan and design conforms to regulations concerning drainage in BIMC 15.20 and 15.21; The site plan and design will not cause an undue burden on the drainage basin or water quality and will not unreasonably interfere with the use and enjoyment of properties downstream; The streets and pedestrian ways as proposed align with and are otherwise coordinated with streets serving adjacent properties; The streets and pedestrian ways as proposed are adequate to accommodate anticipated traffic; The site plan and design conforms to the "City of Bainbridge Island Engineering Design and Development Standards Manual ". The City Engineer finds that, as conditioned, the project conforms to surface and stormwater requirements, will not cause undue burden on the drainage basin, and will not unreasonably interfere with the use and enjoyment of properties downstream. The stormwater management plan is prepared by a licensed professional engineer in accordance with BIMC 15.20. On -site stormwater is managed through dispersion, infiltration and detention. The applicant's model demonstrates that surface and stormwater that flows off -site mimics pre - developed, forested conditions. The stormwater management system must be monitored and maintained as required in BIMC 15.20 / 15.21. The traffic impact analysis provides adequate information to demonstrate that the impact of development passes the concurrency test (BIMC 15.32.020), and the City Engineer issued a Certificate of Concurrency. The streets and pedestrian ways are coordinated with streets serving adjacent properties and are adequate to accommodate anticipated traffic. As conditioned, the project conforms to the City Design and Construction Standards and Specifications manual. As conditioned, the City Engineer recommends project approval. (Condition 6) v. The site plan and design is consistent with applicable design guidelines. The Design Review Board recommends approval of the project as proposed. vi. No harmful or unhealthful conditions are likely to result from the proposed plan. Adequate provision is made for the public health, safety and welfare, and public use and interest. The project is conditioned to ensure adequate access, including emergency services, water, septic, and stormwater facilities. (Conditions 3 - 9) vii. The site plan and design is in conformance with the comprehensive plan and other applicable adopted community plans. The project provides for expansion of a not - for - profit educational facility which includes an arts education program and fosters appreciation of the natural world. Montessori Country School PLN 17677 SPR /CUP P -gF 15 01 19 viii. Any property subject to site plan and design review that contains a critical area or buffer conforms to all requirements of that chapter. The site is unencumbered by critical areas or their buffers. ix. Any property subject to site plan and design review that is within shoreline jurisdiction conforms to all requirements of that chapter. The property is not within shoreline jurisdiction. x. The site plan and design has been prepared consistent with the purpose of the site design review process and open space goals. The purpose of Site Plan and Design Review to establish a comprehensive site plan and design review process that ensures compliance with the adopted plans, policies, and ordinances of the City. This application for Site Plan and Design Review permit is reviewed consistent with the adopted review process to ensure compliance with current plans, policies and regulations. b. BIMC 2.16.050.D Conditional Use Permit — Decision Criteria L The conditional use is harmonious and compatible in design, character and appearance with the intended character and quality of development in the vicinity of the subject property and with the physical characteristics of the subject property. The 4.8 acre school property is across the street from a public park. The proposed single -story buildings are designed to complement a natural setting. ii. The conditional use will be served by adequate public facilities including roads, water, fire protection, sewage disposal facilities and storm drainage facilities. The City Engineer finds that the streets and pedestrian ways are coordinated with streets serving adjacent properties and are adequate to accommodate anticipated traffic. The project is adequately served by roads and storm drainage facilities. As conditioned, the City Engineer recommends project approval. (Condition 6) The Health District finds that the project is adequately served by water and sewage disposal facilities. The Fire Marshal finds that as conditioned, the development provides adequate fire protection facilities. (Condition 7) iii. The conditional use will not be materially detrimental to uses or property in the immediate vicinity of the subject property. The school has been located on the property for over 25 years, and as conditioned, expansion of the existing use will not be materially detrimental to uses or property in the immediate vicinity of the subject property. iv. The conditional use is in accord with the Comprehensive Plan and other applicable adopted community plans, including the Non - motorized Transportation Plan. The redevelopment is in accord with economic and cultural goals contained in the Comprehensive Plan. The project is conditioned to meet Non - motorized Transportation Plan requirements. (Condition 6) Vions ssori _:ou u y ;rho 31'PL -N! 1 i67r S II ,'CUP Page 16 Oi 19 v, The conditional use complies with all other provisions of the Bainbridge Island Municipal Code. The project complies with all applicable provisions of the municipal code as discussed in Section E.2.a above. vi. All necessary measures have been taken to eliminate or reduce to the greatest extent possible the impacts that the proposed use may have on the immediate vicinity of the subject property. The project is conditioned to take special care to protect retained trees and vegetation within buffers. The original proposal was modified to provide improved vehicular circulation and to keep car traffic from backing up on Arrow Point Drive, to provide a student pick -up / drop -off area segregated from vehicular traffic, and to provide overflow parking. (Conditions 8, 10, 11) vii. Noise levels shall be in compliance with BIMC 16.16.020 and 16.16.040.A. All development within the City is subject to noise limitations in BIMC 16.16. viii. The City Engineer has determined that the conditional use meets the following decision criteria: The conditional use conforms to regulations concerning drainage in Chapters 15.20 and 15.21 BIMC; The conditional use will not cause an undue burden on the drainage basin or water quality and will not unreasonably interfere with the use and enjoyment of properties downstream; The streets and pedestrian ways as proposed align with and are otherwise coordinated with streets serving adjacent properties; The streets and pedestrian ways as proposed are adequate to accommodate anticipated traffic; If the conditional use will rely on public water or sewer services, there is capacity in the water or sewer system (as applicable) to serve the conditional use, and the applicable service(s) can be made available at the site; The conditional use conforms to the "City of Bainbridge Island Engineering Design and Development Standards Manual," unless the City Engineer has approved a variation to the road standards in that document based on his or her determination that the variation meets the purposes of BIMC Title 18. The City Engineer finds that, as conditioned, the project conforms to surface and stormwater requirements, will not cause undue burden on the drainage basin, and will not unreasonably interfere with the use and enjoyment of properties downstream. The stormwater management plan follows BIMC 15.20 and utilizes on -site dispersion, infiltration and detention. Post - development off -site flows mimic pre - developed conditions. Ongoing monitoring and maintenance is required once the stormwater facilities are place (BIMC 15.20 / 15.21). The traffic impact analysis demonstrates that the project passes the concurrency test, and the City Engineer issued a Certificate of Concurrency. The streets and pedestrian ways are coordinated with streets serving adjacent properties and are adequate to accommodate anticipated traffic. Water and septic systems provide adequately for the site and as conditioned, the project conforms to the City Design and Construction Standards and Specifications manual. As conditioned, the City Engineer recommends project approval. (Condition 6) pct ,.�1 ?I_N i ✓cJ r SYP . /C Page 17 of 19 ix. A conditional use maybe approved with conditions. If no reasonable conditions can be imposed that ensure the application meets the decision criteria of this chapter, then the application shall be denied. The project is conditioned to ensure compliance with all applicable regulations and address environmental impact. (Conditions 1— 20) x. Additional Decision Criteria for Institutions in Residential Zones: a) All sites must front on roads classified as residential suburban, collector or arterial on the Bainbridge Island functional road classification map. The property fronts Arrow Point Road, classified as a collector road, and therefore the site meets this requirement. b) If the traffic study shows an impact on the level of service, those impacts have been mitigated as required by the City Engineer. The City Engineer finds the traffic study shows an acceptable level of service impact with the conditional use and issued a certificate of concurrency. c) If the application is located outside the Winslow Study Area, the project shall provide vegetated perimeter buffers in compliance with BIMC 18.15.010. The site is outside the Winslow Study Area. As provided in BIMC 18.15.010, buffer averaging is utilized to reduce the buffers to the minimum allowed width of 15 feet in three areas in the northwest and southwest portions of the lot, and the buffer width is increased from 25 feet to 35 feet along the northeast, southeast and east property boundaries. d) The proposal meets the Commercial/ Mixed Use Design Guidelines. Compliance with the Commercial / Mixed Use guidelines, is discussed in Section E.1.g above. The Design Review Board unanimously recommends approval of the project. e) The scale of proposed construction including bulk and height and architectural design features is compatible with the immediately surrounding area. The single -story buildings incorporate various materials designed to be compatible with a natural setting. f) Lot coverage does not exceed 50 percent of the allowable lot coverage in the zone in which the institution is located. Maximum lot coverage in the R -1 zoning district is 15 percent; institutions including religious facilities may not exceed 50 percent of the allowable lot coverage (i.e. 7.5 percent). Lot coverage is approximately 13,660 square feet, or 7.1 percent of the lot area, and therefore meets this requirement. Yon—, r_ CL o � � n Lf .. S-h ,,,i I'li 6 t7 S R ,':u Page 18 of 19 II. Conclusions As conditioned, the proposed development is consistent with the Comprehensive Plan and zoning regulations. The project meets the decision criteria of BIMC 2.16.040 Site Plan and Design Review and BIMC 2.16.050 Conditional Use Permit. Appropriate notice of application was made and comments were considered. The application is properly before the Hearing Examiner for decision. Footnotes: 1 World Health Organization. Children and Noise. http: // www. who.int /ceh /capacity /noise.odt n.L-J,. Accessed December 20, 2016. Metropolitan Airports Commission. Aviation Noise & Satellite Programs Office. Tips for Insulating Your Home against Aircraft Noise. httos:// www.mocnoise.com /Siteslmacnoise .cam /f`ileslpdf /tips.pdf n.d. Accessed December 20, 2016. Montessori Country School PLN 17677 SPR /CUP Page 19 of 19