SUB18840 HEX Exhibit 22Transmittal
Date: May 11, 2015
To: Janelle Hitch, P.E.
City of Bainbridge Island
From: Kelsey Laughlin, P.E.
kq—
Browne Wheeler Engineers, Inc.
Re: BGH Sunrise Preliminary Plat Report PRE18840 — Revision 1
Enclosed is the revised Report for the Rolling Sunrise Preliminary Plat dated 5/11/2015. The
plans have not been revised.
The general items that were revised in the report are the following:
1. The threshold determination discussion incorporates the Hearing Examiner's
revocation of COBI's policy to allow infiltration to be taken into consideration when
evaluating Minimum Requirement thresholds.
2. Minimum Requirement No. 7 thresholds.
3. Soil explorations completed, assumed infiltration rates and the additional studies
required prior to plat utility design.
4. Assumption of a typical residential lot and rain garden sizing applicable to the
preliminary lot layout.
5. Summary of Stormwater Minimum Requirements in Table 2.
6. Engineering Calculations including:
a. Breakdown of predeveloped and developed land areas and types,
b. WWHM3 screen shots of predeveloped and developed site areas and
resulting flows, illustrating below the 0.1-cfs increase threshold,
c. South and north access driveways infiltration trench sizing,
d. Rain garden sizing for a typical residential building lot for rooftop and
driveway areas.
Please contact us if you have questions.
Browne Wheeler Engineers, Inc. 241 Ericksen Avenue NE Bainbridge Island, WA 98110
phone 206.842.0605 fax 206.780.9322
EXHIBI1'
22
BROWNE • WHEELER
ENGINEERS, INC
Revision 1 May 11, 2015
March 24, 2014
Michel Girard
BGH Development, LLC
Michel@BGHdevelopment.com
206.335.1649
Re: Rolling Sunrise Subdivision - Preliminary Plat
Dear Michel:
This letter presents our preliminary drainage, utility and road design for the proposed BGH Rolling
Sunrise Preliminary Plat. The proposed plat includes the subdivision of one 3.41 -acre parcel into 7
single family residential parcels.
EXISTING CONDITIONS
The site is located south of the road end of Sunrise Drive, and north of Hyla Avenue. Currently the
l site is undeveloped with grass, brush and trees. The site is served by a gravel access driveway
l through a 20 -ft easement from Sunrise Drive.
The soil is mapped by the United States Department of Agriculture as Harstine gravelly ashy sandy
loam. The site slopes generally to the south gently to steeply across the site.
SITE ACCESS
Existing
The site currently has a gravel driveway located in an easement which provides access to the site
from Sunrise Drive to the north.
Proposed
The existing access driveway to the north will be widened to meet road standards and fire access
requirements and extended to serve the north 4 lots. The driveway will be widened to 12 -ft with 2
and 3 -ft gravel shoulders as required by the City. The length of driveway with 2 -ft shoulders rather
than 3 -ft is 200 -ft, from Sunrise Drive through the 20 -ft wide access easement to provide space for
a 2 -ft wide infiltration trench paralleling the driveway.
A new south access is proposed off of Hyla Avenue to the southwest in which an easement through
private property exists. The new access approach will be at a 90 -degree turn in Hyla Avenue.
1 Because both access roads are gravel surfacing, the road approaches are proposed to be gravel.
1-
241 ERICKSEN AVENUE NE, BAINBRIDGE ISLAND, WA 98110 206.842.0605 infoRi BrowneWheeler.com
REVISION 1
STORM DRAINAGE
Existing
Stormwater appears to infiltrate into the soils on-site or flows in a dispersed manner with no
indications of runoff on-site.
Downstream System
The site drains south toward Hyla Avenue and two private properties (see Drainage Map). Hyla
Avenue is a gravel road that does not have any stormwater management infrastructure installed.
Stormwater runoff appears to flow in a dispersed manner south to a closed depression along Hyla
Avenue, approximately 200 -ft from the southwest of the subject property. The property owner
southwest of the project indicated that water frequently ponds on both sides of Hyla Avenue on
private and public property where it eventually infiltrates.
The property southeast of the project site also has an apparent closed depression along the south
edge but the owners have not indicated any issues related to stormwater runoff.
Proposed
The proposed project consists of providing storm drainage facilities for two access driveways to
serve the seven lots. The storm drainage system will be designed to infiltrate 100% of the
stormwater runoff from the driveways on-site through the installation of infiltration trenches along
the two access driveways. All new gravel access driveways will drain through a grass shoulder to
an infiltration trench along the driveway to allow stormwater runoff from the driveway area to
infiltrate into native soils. Check dams will be installed along the infiltration trenches as required to
disperse infiltration and prevent accumulation of water in one spot.
Threshold Determination
The impervious areas for the proposed access driveways were used to evaluate the Minimum
Requirements, as summarized in Table 1.
Table 1 - Impervious Areas
Proposed Total
Existing Impervious
New Impervious
Impervious Area (sf)
Area (sf)
Area (sf)
North Driveway 6,450
1,970
4,480
South Driveway 4,350
0
4,350
Total 10,800
1,970
8,830
A portion of the north access driveway overlaps the existing gravel driveway, about 9 -ft wide, and
will be widened to meet the City road standard. The driveway overlap reduces the new impervious
area of the north driveway to 4,480 -square feet (sf). A total of 8,830-sf new impervious area will be
created by the north and south driveways; therefore Minimum Requirements No.'s 1-10 apply to the
project as outlined by DOE in the Stormwater Management Manual for Western Washington
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island Browne Wheeler Engineers, Inc.
Lu-
/NiO� N
0 75 150 300 600 900
TOPOGRAPHIC INFORMATION BASED UPON
KITSAP COUNTY LIDAR AERIAL SURVEY, 2-FT SCALE: 1" = 300'
CONTOURS. ELEVATION DATUM: NAVD88.
DRAINAGE MAP
BGN - SUNRISE
FIMN E: GAAP.f PLOTOATF. Y1 l I Into eu of nr nc�nrc ixnr��i
BROWNE • WHEELER
ENGINEERS, INC
241 ERICKSEN AVENUE NE
BAINBRIDGE ISLAND, WA 98110
P 206.842.0605 INFO@BrowneWheeler.COM
REVISION 1
i� (SWMMWW), 2005 edition (Figure 2.2). Table 2 describes how each of Minimum Requirements
No.'s 1-10 will be met.
Minimum Requirement No. 7, Flow Control requires construction of flow control facilities if any of
the following thresholds are exceeded:
If the project will have a total of 10,000-sf or more of "effective" impervious surfaces. Table
1, above, shows the project will result in greater than 10,000-sf. However this area is not
..effective" because the runoff will be fully infiltrated and not discharged off-site.
2. If the project converts %-acres or more of native vegetation to lawn or landscape, or
converts 2.5 -acres or more native vegetation to pasture. We assumed 4,000-sf of
landscape per lot which results in approximately 0.64 -acres, which is below the %-acres
threshold. There will be no conversion of native vegetation to pasture.
3. If the project will result in an increase in the 100 -yr frequency peak flow of 0.1 -cubic foot per
second (cfs) or greater, as estimated by Western Washington Hydrology Model Version 3
(VWVHM3). WWHM3 was used to model the entire site, including the access driveways and
projected rooftop, driveway and landscaped areas for each of the seven lots. The model
predicted an increase of 0.05-cfs, which is below the 0.1-cfs threshold.
The attached calculations present a breakdown of land type areas used in the WWHM3
model for the predeveloped and the developed scenarios. The predeveloped scenario is a
moderately and steeply sloping forested condition with Type C soils. In the developed
scenario, the areas of driveway and rooftop which are infiltrated in either rain gardens or
infiltration trenches are removed from the area modeled in the developed scenario because
they are designed to infiltrate 100%.
Minimum Requirement No. 7 indicates "that portion of any development project in which the above
thresholds are not exceeded * shall apply Onsite Stormwater Management BMPs in accordance
with Minimum Requirement No. 5." Following the SWMMWW, on-site BMPs will be utilized to
infiltrate water on-site because flow control facilities are not required.
* Deleted "in a threshold discharge area" per BIMC 15.20.060.B.
Soil Infiltration
The City determined that the on-site soil investigations performed by Daves Septic Services, Inc.,
dated 7/3/2013, is adequate soil exploration for Preliminary Plat submittal and approval. An
infiltration rate of 0.5-inches/hour was used for preliminary facility sizing, as outlined in our memo
dated November 6, 2014. Prior to Plat Utility Permit submittal, a geotechnical engineer will need to
perform soil investigations to verify site suitability of the soil for infiltration via trenches and water
quality treatment in accordance with Chapter 3.1 Roof Downspout Controls and SSC -6 Soil
Suitability for Treatment in Chapter 3.3.7 Site Suitability Criteria in Vol. III of SWMMWW. If the soils
are found to be unsuitable for infiltration trenches, rain gardens, with different site suitability criteria,
will be used.
4
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island Browne Wheeler Engineers, Inc.
Sur,Yi sQ,
Start Here
Does the site have
Yes
See Redevelopment
35% or more of
existing impervious
Minimum
coverage?
Requirements and
Flow Chart
Does the project convert
(Figure 2.3)
N=
'/a acres or more of native
vegetation to lawn or
Does the project add
No landscaped areas, or
5,000 square feet or
convert 2.5 acres or more
more of new
of native vegetation to
impervious surfaces?
pasture?
Yes
Yes No
Does the project have
All Minimum
2,000 square feet or
Requirements apply to
more of new, replaced,
the new impervious
or new plus replaced
surfaces a— nd converted
impervious surfaces?
pervious surfaces.
------
Yes
No
Minimum
Does the project have
Requirements #1
land -disturbing
through #5 apply to
activities of 7,000
the new and replaced Yes
square feet or more?
impervious surfaces
and the land disturbed.
No
See Minimum
Requirement #2,
Construction
Stormwater Pollution
Prevention
Figure 2.2 – Flow Chart for Determining Requirements for New Development
�InewS, Inc
5
February 2005 Volume I – Minimum Technical Requirements P_9
REVISION 1
) Individual Lot Development
The development area of each lot will be determined by the individual purchaser. All stormwater
runoff generated from each lot will be kept on-site to the maximum extent practicable through the
installation of rain gardens or other methods to infiltrate all stormwater from new impervious areas.
We evaluated the preliminary home layouts shown on the plans which range between 1,100-sf and
2,400-sf of rooftop area with driveways to each lot varying between 400-sf and 1,250-sf. Attached
is a WWHM3 output illustrating an average 2,000-sf rooftop area and 1,000-sf driveway area
combination infiltrating 100% of stormwater runoff through a 200-sf rain garden. This is NOT the
largest impervious lot coverage allowed by code but a reasonable coverage for the lot based on
preliminary plans. Drainage plans for individual lots will be developed during their respective
building permit applications. Disturbed landscaping areas will have the soil amended in accordance
with BMP T5.13 Post -Construction Soil Quality and Depth.
ON-SITE UTILITIES
WATER
Existing
There is no water utility connection currently to the property. Kitsap PUD's water system is in the
vicinity of the project.
Proposed
A new 8 -inch water main will be connected to the water system in Sunrise Drive. The new water
main will be extended south through the access easement and west and south to provide water
service to all seven lots. Two fire hydrants will be installed, one along the North access driveway
and one along the South access driveway and will be served by this new water main.
Water service for the proposed seven lots will be provided through seven new 5/8" water meters,
connected to the water main extension.
SANITARY SEWER
Existing
There are no sewer services currently serving the property.
Proposed
Each of the seven lots will have a private on-site septic system. The systems have not been designed
but space is allocated for drainfields to maintain required separations from stormwater facilities.
Power, telephone, and television cable will be designed by others.
6
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island Browne Wheeler Engineers, Inc.
REVISION 1
FRONTAGEIMPROVEMENTS
Existing
There are no frontage improvements required since the property does not front any right of way.
Proposed
The property does not front any rights of ways and no frontage improvements are proposed.
EROSION CONTROL
The Contractor will be responsible for maintaining erosion control facilities on the site during
construction and for ensuring that sediment does not leave the site. The general principles of
construction pollution prevention are:
• Retain native vegetation
• Prevent erosion rather than treat sediment laden water
• Employ site specific best management practices (BMPs)
• Divert upslope runoff around disturbed area
• Phase construction operations to reduce total amount of disturbance at one time
• Amend soils before seeding
• Minimize the slope length and steepness of disturbed areas
• Reduce runoff velocities
• Prevent the tracking of sediment off site
• Employ BMPs that address not only erosion but also other potential pollutants.
A detailed erosion and sediment control plan will be developed during final design.
Very truly yours,
BROWNE WHEELER ENGINEERS, INC.
5/11/2015 5/11/2015
LM-
��0?FClB T_ERt% Cl� r0� R� 48030 EO
ss10NAL E��\ �SSIONAL E�w
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island Browne Wheeler Engineers, Inc.
i�
REVISION 1
Table 2
Summary of Stormwater Minimum Requirements
Minimum Requirement
Comment
1. Stormwater site plan
A stormwater site plan will be presented.
2. Construction stormwater
A detailed construction stormwater pollution
pollution prevention
prevention plan will be developed during final
design.
3. Source control of pollutants
Not applicable.
4. Preservation of natural
All stormwater will continue to discharge in the
drainage systems and outfalls
same location.
5. On-site stormwater
Stormwater will be kept on-site to the maximum
management
extent practicable through infiltration and the
amendment of all landscaping areas.
6. Runoff treatment
Water quality treatment for the access
driveways will be provided through onsite best
management practices. Stormwater treatment
facilities are not required.
Water quality treatment requirements for
driveways on each lot will be determined during
development of their respective building permit
submittals.
7. Flow control
Infiltration of stormwater runoff will reduce
runoff rates below thresholds to require flow
control facilities. On-site BMPs will be utilized
to infiltrate water on-site.
8. Wetlands protection
Not applicable.
9. Basin and watershed planning
Not applicable.
10. Operation and maintenance
An operation and maintenance manual will be
prepared during final design.
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island
8
Browne Wheeler Engineers, Inc.
i�
REVISION 1
ENGINEERING CALCULATIONS
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island Browne Wheeler Engineers, Inc.
BGH - Rolling Sunrise
Browne Wheeler Engineers, Inc
5/11/2015
PREDEVELOPED
Area (sf)
Area (ac) Slope
Area (sf)
Area (ac) SD Method
Model Land Type
Area (sf)
Area (ac) Slope
Area (sf)
Area (ac) Land Type
Property
149035
3.4214 Mod 5-15%
82305
1.8895 C, Forest
38844
0.8917
Steep>15%
66730
1.5319 C, Forest
N. access Ease.
3976
0.0913 Mod 5-15%
3976
0.0913 C, Forest
S. access Ease.
1159
0.0266 Mod 5-15%
1159
0.0266 C, Forest
Total
154170
3.5393
154170
3.5393
DEVELOPED
10
Area (sf)
Area (ac) Slope
Area (sf)
Area (ac) SD Method
Model Land Type
Property
149035
3.4214 Mod 5-15%
54180
1.2438
1.2438 C, Forest
Steep>15%
38844
0.8917
0.8917 C, Forest
Mod 5-15%
28000
0.6428
0.6428 C, Lawn
North Road
Flat 0-5%
3625
0.0832 Infiltrated
- Road, Flat
South Road
Mod 5-15%
3386
0.0777 Infiltrated
- Road, Mod
Flat 0-5%
14000
0.3214 Infiltrated
- Rooftop
Mod 5-15%
7000
0.1607 Infiltrated
- Driveway
N. access Ease.
3976
0.0913 Mod 5-15%
1172
0.0269
0.0269 C, Lawn
Flat 0-5%
2804
0.0644 Infiltrated
- Road, Flat
S. access Ease.
1159
0.0266 Mod 5-15%
203
0.0047
0.0047 C, Lawn
Mod 5-15%
956
0.0219
0.0219 Road, Mod
Total
154170
3.5393
154170
3.5393
2.8318
10
REVISION 1
Entire Site & Access WWHM3 Model
HW HM3 BGHN Ie Site
■
MweEbade
Subbesin r DNla�mBwwnla Poe:
Solace lm.B 6re,maeMw
Flnwe To :
AewainBe.m r snw,wysde<roa
j
PevweTdel ®pum Immmua iaa BZ19 Mee
J Been idtl BTB _..__. Mm
J
Dm Zeo I Go I
11
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island Browne Wheeler Engineers, Inc.
Subbmin NemeSWQFlaws
To:in B.m
FSh O*Stleeedi B6NSh1Ni �REIN
FEW]
�—1
I– fl oFi RAT 0
rPR.Pmpm, M
f"'.D AYSF1ki 0�
r AS.PUNe,saro CJ
r ofl1VEWAT5M0o LJ
�" TI
rAS�Irm M1��
r AIB.Isml,Mstl D
f"oflNEWAYSSTEEP
r' IDEWAtKSMAT D
C F,l
r GFaeq.Fld 0
r' SmEW MDD
SIDEW STEEP
F: GFae6Mw 80071 I
F [. FdaLSbeP 16319
r 0
r P T
(" PAA N MDD B
_ _ _ _ _ F C Ptlu( o
r GPeWe, atl ' o
f PABF➢IDSTEFP D
r PDND �J
r C, Pear Slum O
_ f.GLM
Mlm Ebrieltt
F 4Larm.Mod o
Jr C Lein Strop
11
_
�
_ _ _ _ Periurstdd 358{ M.,m
I�memve id6 � 4an
Bm T.d 1583
Ma
Sere xy Lo.Mty
J
JJ
J
xt
Y-
Dexbcl Ze'o Snlxn Nrr--
Go
Q WWHM3 BGH Vin tette
D&EOPCD
FBe Fbl Yiw Hdp
MweEbade
Subbesin r DNla�mBwwnla Poe:
Solace lm.B 6re,maeMw
Flnwe To :
AewainBe.m r snw,wysde<roa
j
PevweTdel ®pum Immmua iaa BZ19 Mee
J Been idtl BTB _..__. Mm
J
Dm Zeo I Go I
11
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island Browne Wheeler Engineers, Inc.
REVISION 1
0 WWHM3 BOHMde Site
Fle Edk Yew Hdp
❑ filal&'.. -
® W 010'►
ID
-
911 PoCl PedeveMee4�
Pl.. eragaenw
-,
®
10E
801 PoCt Mdg01ad lVw
P1ow(CP5) Predevel.pad
M1tlpa�ed
2 Year =
0.1095
0.0992
5 Year =
0.1698
0.1562
b
10 Year -
0.2037
0.1960
U l0E C
25 Year
0.2393
0.2478
50 Year
0.2613
0.2871
100 Year =
0.2800
0.3269
0
YY Feaka
I lMIM-18g9e4Of
99°egg98e°
1949
0.1296
0.1213 5
3e040^
1950
0.2272
0.2699
1951
0.2372
0.2129
8888g8
1952
0.0811
0.0812
°8
1933
0.0641
0.0593
1
1934
0.0918
0.0834
1 10 20 30 40
60 60 70 00 90 99
1955
0.1711
0.1421
Cumulative Probability
1956
0.1409
0.1368
1957
0.1169
0.1236
DuaOau
Fbx Fieaxnry 1
Wde Dae9y 1
1950
0.1163
0.0992
Hyd�
Wdi0M F13clueti9n
0etlw,9e P4gwFy
1959
1960
0.0954
0.1680
0.0808
0.1566
Md7ze dMesel4
1961
0.0951
0.0794
1962
0.0599
0.0541
1963
0.0791
0.0795
1964
0.0922
0.0880
1965
0.0730
0.0689
1966
0.0736
0.0800
1967
0.1683
0.1603
1960
0.0983
0.0903
N Dtlaien FIOw Slag° fledp Evap MC1
1969
1970
0.1011
0.0836
0.0931
0.0057
1971
0.0721
0.0815
1972
0.1937
0.19D0
* L PexswT e111
(' E°9 Paaim Type 111170
1973
0.0911
0.0798
r Wab
n none
^ ^ua^
ievelcxd Increase C.0gt9 < O. I efs Threslwld
12
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island Browne Wheeler Engineers, Inc.
REVISION 1
._ pWWHMT BGHwFaTBHpI SOUT14
I Poe Wit Y Hdp --. ----_ _
n
QvA W RGH MM 1NNCH
Fla FdM1 ViawHap
HWefl
OWe12
Outlet
I]aWll6beem C. nne Chen
Basin l Mhigrtm
Subbesin Neme BOMAaam flaw F Dedada m Rypaa to PJC:
Orifice Oiumeter Height OM.
rA/6.IAvat4luy 10 r'SIDEWA M00-
r C. Faetl.FlY _ 0 r SIDEW STEEP 0
SWNCoen
POaBsulace
late1pn aaded
Gun
flaws Te: G,a JTmrhBdl GiewlTmrh Bfill
_
La 2papdy 0
F C, Faea.Mm r NGIFiAT
fr PAflpNGMOD 0
Area in Hasln rr5lw D*Srwei
—_ Lain 3 P. -A, l6l 0
Lbav3pamb 0
Fadlily Oimansidns
InGItalian W �
r 4Patlu6,M 0 r PAGIUN 5TEEP u
I- C. Petlae.Me6 F FUND
_
Avadablu PerVlpae Avalabls ImP6msus ll
�f NR, FaaLFW �C� r1. MT 0
_. r AIB F.e Mme pO plgUaDSMOD DTP 3r�W SF
Rw HeON m) Ip
05
O
Eft Tdd D,th 215
Rua D'aMe(n)
VES
adlan Meed T,mrh DDT
r AIB FnerLSMro u� r POAD55TEEP �`
10256
0
F CPaem Slw 1O—
NOVA TM
�nf ilk-cilon
—
f NS. Pnha.Fld p� r flODFTOp$AUT
F A/B. Padae.Mm 0 r RNEWAVSAIAT-
i3
1
f0 �
f" AR Per6ae51aa pO r DPNEWAYSMOD
rCLa
NI
u
r AS.Lelm,ilal pO I- Dfl A STEEP
frSIOEV�-1
QvA W RGH MM 1NNCH
Fla FdM1 ViawHap
HWefl
OWe12
Outlet
I]aWll6beem C. nne Chen
Fa—]
Orifice Oiumeter Height OM.
rA/6.IAvat4luy 10 r'SIDEWA M00-
r C. Faetl.FlY _ 0 r SIDEW STEEP 0
_
Ouh*Trend)
_
La 2papdy 0
F C, Faea.Mm r NGIFiAT
fr PAflpNGMOD 0
Fedllfy Oouam Elevation (X)
—_ Lain 3 P. -A, l6l 0
Lbav3pamb 0
Fadlily Oimansidns
InGItalian W �
r 4Patlu6,M 0 r PAGIUN 5TEEP u
I- C. Petlae.Me6 F FUND
_
F lladamWdh y.
Rw HeON m) Ip
05
O
Eft Tdd D,th 215
Rua D'aMe(n)
VES
adlan Meed T,mrh DDT
Run Type IHd
10256
0
F CPaem Slw 1O—
NOVA TM
�nf ilk-cilon
-tMnch along accass) a6d
i3
r C.Laen Fld -� D
rCLa
NI
s
..Ir C_Iam.S 0
Pmw,rad �Mw liamnn Tdd ®Mn
_— ____.
1J J
J
J
Ram Tdd ®Ana
Da ZeO FaInr,F F — GO I
QvA W RGH MM 1NNCH
Fla FdM1 ViawHap
HWefl
OWe12
Outlet
I]aWll6beem C. nne Chen
Fa—]
Orifice Oiumeter Height OM.
Fedlity Type GIaM T,m3VRed T—
F- Prt *tenAp*dWFaiy
Ouh*Trend)
r v M NG
La 2papdy 0
Fedllfy Oouam Elevation (X)
—_ Lain 3 P. -A, l6l 0
Lbav3pamb 0
Fadlily Oimansidns
InGItalian W �
T,w Lm A M
OWat slum
F lladamWdh y.
Rw HeON m) Ip
05
O
Eft Tdd D,th 215
Rua D'aMe(n)
VES
adlan Meed T,mrh DDT
Run Type IHd
10256
0
LeASH Sbpe 0
fly25ide56pe o
NOVA TM
�nf ilk-cilon
-tMnch along accass) a6d
--. Material Wrs tar
Lga,I TFA:Wwn 01 25
Orifice Oiumeter Height OM.
L.yal aamBy Da
Number (In) (FI) (ds)
La 2ilicpma011 0
1 re -1 �-1 a
La 2papdy 0
2 Ip �{�� B
—_ Lain 3 P. -A, l6l 0
Lbav3pamb 0
3 0 IBt/7 0✓ g rIFGLT-(r p kv�
�a I L-4
InGItalian W �
rla AVdmetl Run IaoM 01
MeauamlMreDvlRtlaWl.l
PndlnuaD10 -rI
--_ IdAationflmuaupn Fade
05
� Shaw Pondcmd Tehle Upm TeEb -1
Uro WdIm Salam ArealMnwbl
VES
-1
_J idalVpludlnf8aapmMl
J TddVW.areTMneh Mmr(Mel)
10256
0
TddVdrle Thaughl'aaW.Ml 10256
PmMlarbM 100 lco� INr'ILE?A1 Tv
i3
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island Browne Wheeler Engineers, Inc.
REVISION 1
® WWMM3 WH MM TBNCH Willem (1 I tcl _Z,4D ---/ _AjFl L I Lz.rTioN I /C.ewc
I H, Uit V-Hdp
❑6'®a
n M
' BavinlMNgaleJ
ENARIOS Subbasin Name Nana® r 0eu4abss8mattw POC
Nvtltft"flm3 9ulme Imatbw G'w as
' Flows To: Gia JTmd�Badl GavdTm Bw
Mtipa d
Aree in Bnsin Shdv Orb Sdacled
I Mailebla Perviou.� yAveileble lm erviou D1116-�_
FYFW.q ___.. .. _- _ - _....-. _..__-- _Jr a/B.Faed�Matl 0 r FlNDSMOD 0
WONr AR. Fwmtslw � r NDCD55-�-�
I- .Lava.Sbeo
0
1�—�
r c.;, at
u
W fj Mo
r CFda45kw
r D,PmW0. FW
pO
r CPSNe Matl
C�
r C, Pa.n.e.SaeP
r c.LawtBd
��
rc.tawi. MnX
oO
Jrc.La.�slao
Pa.orTdd
0�-1 ene.
r pflrYT:wanmpD
r OBNFNA STEEP
r SIOEWAl15/FlAi
r s1DEWalxsnnpD
F BIDEWW!tnTEEP
r PARBNSr T
r PPAMNGMOD.
F PAAgNGSTEEP
F ND _
I� Tdd 1176 Awes
J _ Bamidd 1176 Aan
J DeWvl Zmo SnlarYflvf Go I
VMM1Y10,13 BGHWBLTBNCH
fo,'f 2`I sf
Fde M yaw Hdp
oG9ei6
SCM1r IM �9' f GMvtl TaBedl Mnigaled
SCENARIOS -11I FefacilityNe.ame G,evd TmFM1 BeXt
rNda"tk J Outlell 00e12 Outlet3
Oovmeboam Cannectian 0 Ip 0
N Megdm FacilityType jgrmtl7m to,l
flin5cevio r Rayidmappfed roFacAY Ouie3t Trends
r vaodaEonPcoidloF
Facility Bottom Ela.,atan (it) 0
MPHFacility Oimeneione
F,-❑eneh Betll T,a AL.Vp Oa et Structure
i�aah Bdlpn WdlM1 2
®®®'- EXaeve Tdd OegM1 275 Bim pbmddfl r--�
1 Bdbm dmad Tiwdl DBBI.. Bim Type �—J ('
Ndd Law ��SJ
/ o not u;5,,a o I'nfatva&"-J'Y4ench cx4arig
- -ChL- Material Layers Ior l r ' • )Ndre
La ITte 110 25 Oririca OI�Hei� 0 QS a& O YW,)
Lint Why 0.4 Number (In) (Ft) (de
Lga2iNcbett llB 0 1
Lav2".* 2
Lap 3iHdvett 1111 G 3�-{F0 0
O.S in/hr jn Watia%►ate
MweEbm3a InDlUaeon QTS - Dad =a Pha H.MtaaN .011
Memae3lrPodm Nde (NNI ri Padlmawa D10
- --
IrMttl Bedrmi Faso p5 J Show Pord Tnble 0r -T" J
_. DUWdIM Solace/ ealtkardal YES :{
TddVaM Tl aled(awMl 1916 raayW yNwghl,�y(aae5) 19.1%
Xaravy�LeatlltV J Tdd VO THot*RaI leweB) 0 P.m Id dW IM
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island Browne Wheeler Engineers, Inc.
Typical Residential Lot Rain Garden Sizing
i �Yry1HM3 BGH ah RG
11
FM Ede Y H 1
Xhemepc , Bvm 1 MHigdd
SCEIUNOS SubbaeinN Tried SM La-
r
a r Ge,yn mBy{ewIw POC
rR. nm i'p asFfltd SW—
I IamBaw 6lwdnm
1-11%
___..._ M.T. Gsd rrtM BM1 _]GiseilmdiBell ���
F MOyetl
Are H.d.r'. SF a*Sd M
rare.ram.sM.P I
r Are,Pawe.Fla
r aB.v—.wed
r'N13,Pmhie,St\eo
r ArD.ua�FM l
r aG�1
r Clwn M[d
Move EWm9r JF CICS
— Pmwrrael A. t. rad ®pwp
-!Lj J
Decehd Zea 1 Rnlrrf FMf ••;1 I;n I
WNHM3 9GH ah RG
REVISION 1
`pocSf y/rwcy-40t
2rcOOS( V.DoV op
w� w
f Retle�dxetl
t C
Sr
Fedliy N..SER mGehn
OutletT Met OWd3
aFMapW
_.__
__ r
__.
-.._
Onwn:beem conneca'ne G p pO
FedlM Type G,wdi,etl,9M
F RapietimAapbdlaFxYy OuikTmndl I
r.[VrvPd011pbpbFMli'f
Rin Saran
®®®
®■m
B®®®
ffII9�
SFR Ami-
— -
F.diry NO.. Elamfion(h) t0
FadIM Dimeniene
Tm La p OWet Sbudum
Pan Hera
LierA BmmWdn 1p in) tl Vi ��l7
w Dixeld[ni 6 c
tr`1
a eiadDp 3 Rr �`.J\
Bdlvn {sed rrtrcM1 DO[GI Rw J ,FJ
b95i65ye 3 NdN�r
ter
1
Materiel lnyere lar
Lernl il:ckmnlnl 13 Grifirs Dinmeler Heghl OM—
Lgnlwmrr 0.1 Number &) (Fl) (de)
__.
ladtrlvkm.lRl p r F0`415--.1 D
Iar+zowoRrp 2 loo -1 r—:i D
Ipn3Ti Q11 p. p �� fd—A U.. jam` J.�fM yyj`{
1nM3WmiY p �Z'J�.J (n�11Y tr{IlWabV„ ale—
Mwe Fbaaa
InlilVefion [5 -*{ r mb dnedRva aM lmedl Dli
Meewe11il4din Rdef l (r —'�F\ Shaw evn G10 ;{
1eiLdm RdmmFwio ps � Show FRntl Tebla Dyn retie
1J
___..._
—&
1 Lard
J
'�
J
Uwwdbd Seleaaee lnBexeM) fyFS--
rddvd.relduaeywmlp 9.51 TdSVw Tl Fedty(xen1 IM
rddvd.namwy,Runlmexl o PmcarHxuda Im `�pI �NPWVV 'CED
IS
BGH- Rolling Sunrise Preliminary Plat, Bainbridge Island Browne Wheeler Engineers, Inc.