Loading...
SUB18840 HEX Exhibit 7City of Bainbridge Island Department of Planning & Community Development 280 Madison Ave. K Bainbridge Island, WA 98110 (206) 842-2552 www.ci.bainbridge-isl.wa.us To: Sean Conrad, Planner From: Janelle Hitch, Development Enginee�'j/ Date: April 4, 2014 eSLt 88 �/C� Development Engineer Conditions for Approval Re: Rolling Sunrise Subdivision Plan Review Related Application Number: SUB18840 Bainbridge Island APR _ 4 M4 Dept. of Planning & Community Development The applicant proposes to subdivide one parcel totaling 3.4 acres into 7 lots. The property is located south of the south end of Sunrise Drive and north of Hyla Avenue. The development engineer has reviewed the above land use proposal for subdivision. A Certificate of Concurrency has been issued by the development engineer. The subdivision conforms to the requirements of BIMC Chapter 17 and the standards in the COBI Design and Construction Standards and Specifications. The development engineer l recommends approval of the subdivision application with the following conditions: J GENERAL 1. Civil construction will be required before building permits shall be issued. No building construction shall be started prior to civil construction is completed or bonding established. Civil construction plans and profiles for all roads, storm drainage facilities, sanitary sewer and water facilities and appurtenances for each project stage, prepared by the developer's engineer shall be submitted to COBI for review and approval. 2. As -built civil construction plans will be provided by the applicant prior to final subdivision approval. STORMWATER 3. A Stormwater Pollution Prevention Plan (SWPPP) is required prior to building and civil construction activities. Stormwater quality treatment, erosion and sedimentation control shall be designed in accordance with BIMC15.20. The submittal documents shall be prepared by a civil engineer licensed in the State of Washington. 4. Prior to any construction activities, the applicant shall apply for a Department of Ecology General stormwater Construction Permit. Any jobsite one acre or greater in size must comply with NPDES Phase II Department of Ecology requirements by applying for this permit. 5. Prior to final plat submittal, the applicant shall submit an operation and maintenance plan for the on-going maintenance of the storm drainage system. 6. All on-site stormwater facilities shall remain privately owned and maintained. The owner shall be responsible for maintenance of the storm drainage facilities for this development following construction. Annual inspection and maintenance reports shall be provided to the City. A Declaration of Covenant for stormwater system operation and maintenance will be required to be recorded before final plat submittal. The approved language for the Declaration of Covenant is found in BIMC Chapter 15.21, Exhibit A. 7. At the time of Building permit Application for the individual lots, demonstration of compliance with applicable stormwater management requirements shall be required in accordance with BIMC 15.20. This not shall be listed on the face of the final plat. TRAFFICAND ROADS 8. The developer's engineer shall certify that there is adequate entering sight distance at the site entrances and within the access driveways. Such certification shall note the minimum required sight distance, the actual sight distance provided, and a sight distance diagram showing the intersection geometry drawn to scale, topographic and landscaping features, and the sight triangle. The sight distance shall meet the requirements of the COBI Design and Construction Standards. 9. Transportation facilities shall be reviewed and approved by fire officials during the civil construction design. UTILITIES 10. It shall be the responsibility of the applicant to verify the adequacy of the proposed water main to meet fire flow requirements pursuant to the City of Bainbridge Island Municipal Code 13.10.065. Fire flow requirements to neighboring property must be maintained. Plans and calculations showing how this level of pressure will be maintained will be provided to the city. 11. The applicant and the water service provider, Kitsap PUD, shall verify that the proposed water main extension provides for future extension to other properties within the service area. OTHER 12. All lot corners shall be staked with three-quarter inch galvanized iron pipe and locator stakes. A survey of the property must be completed and submitted with the final plat application. 13. A right-of-way (ROW) construction permit will be required prior to any construction activities within the right-of-way. The ROW permit will be subject to separate conditions and bonding requirements. 14. A binding Water Availability Commitment is required prior to building permit issuance. In lieu of completion of improvements with conditions of a preliminary subdivision approval, the City may accept an assurance device, other than a bond, in an amount and in a form determined by the City. The assurance device must secure and provide for the actual construction and installation of the improvements or the performance of the conditions within one year, or such additional time as the City determines is appropriate after final plat i \ i l approval. In addition, the City shall require an assurance device, including a bond, securing J the successful operation of improvements for one year after city's acceptance of the improvements; provided, that the city council may, upon recommendation of the City engineer or the director, extend the term of the assurance device for up to two years for improvements that will not demonstrate compliance with construction or installation requirements within one year. These are the recognized issues related to the review package in possession of the City as of the date of this memo. The applicant is required to adhere to all Planning/Building Department findings, City of Bainbridge Island Municipal Code and Design & Construction Standards, State and Federal Law and good engineering and survey practices where applicable. Any recognized deviation from these requirements will require correction by the Applicant, regardless of the approval status of plans or construction status. Any revisions of these plans, specifications or calculations require the affixed Surveyor's or Professional Engineer's seal of a surveyor or engineer (as applicable) licensed in the State of Washington, and subsequent review of the plans and revisions by the City of Bainbridge Island. CrFY OF BAINBRIDGE ISLAND DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT 280 MADISON AVENUE NORTH BAINBRIDGE ISLAND, WA 98110-1812 PHONE: (206) 842-2552 FAX (206) 780-0955 Web Site: www.ci.bainbridge-isl.wa us PCD Engineer Review Project Name: ROLLING SUNRISEBGH SUB Date Material Received: 12/3/2013 Project Number: PRJ-0018840 Case Number: SUB18840 Parcel Number: 14250220512003 Site address: WA 98107 Sunrise Drive 12/3/2013, Sean Conrad, Sunrise Drive. Preliminary subdivision to subdivide a 149,039 sf parcel into 7 lots. #378 Bainbridge Island APA - 4 1014 Dept. of Planning 8 Community Development 12/3/2013 - original submittal: preliminary subdivision application, owner/agent agreement, legal description, lot closures, soil logs, water availability letter, open space management plan, environmental checklist, title report and site/survey plan: BGH Development's check #1088 in the amount of $555.00 made payable to the Health District representing prepayment for Health District review for both this preliminary subdivision and boundary line adjustment BLA18840. Application w/attachments to: Sean Conrad - Planning Steven Brown - Health Aaron Claiborne - O&M Comments Due By: 12/15/2013 Date Sent: 12/06/2013 Comments: Please select one of the following options and return to planning. No Comment x See Ott ed Conditions s//�Comments /� Signed: -�" `' /'� , Date: y Printed: Janelle Hitch - PCD Engineer Luke Carpenter - Fire Non -motorized Transportati Created By: MEM May 2001 leterof trans