ORD 2003-43 2004 CAPITAL FACILITIES ELEMENT SIX-YEAR UPDATE ORDINANCE 2003 - 43 AN ORDINANCE OF THE CITY OF BAINBRIDGE ISLAND, WASHINGTON ADOPTING THE 2004 UPDATE OF THE SIX-YEAR FINANCING PLAN OF THE CAPITAL FACILITIES ELEMENT OF THE BAINBRIDGE ISLAND COMPREHENSIVE PLAN. WHEREAS, in accordance with the Growth Management Act, the City of Bainbridge Island adopted a Comprehensive Plan on September 1, 1994, which Plan contains a capital facilities element that establishes goals and policies for the provision and financing of capital facilities for the citizens of Bainbridge Island; and VfI-IEREAS, the Growth Management Act requires that the six-year financing plan be updated at least biennially and adopted as an amendment to the Comprehensive Plan and Comprehensive Plan Policy CF1.7 requires annual updates; and WHEREAS, the 2004 updated Six-Year Financing Plan addresses all of the goals and requirements set further in the Growth Management Act and the Bainbridge Island Comprehensive Plan; and WHEREAS, the 2004 update of the Six-Year Financing Plan is in conformance with the decision criteria for amendments to the Comprehensive Plan as set forth in BIMC 18.117.060; and WHEREAS, through its staff, the Planning Commission and the City Council have received, discussed and considered the testimony, written comments and material from the public; now, therefore THE CITY COUNCIL OF THE CITY OF BAINBRIDGE ISLAND, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION 1. The 2004 update of the Six-Year Financing Plan of the Capital Facilities Element of the Bainbridge Island Comprehensive Plan is adopted as of December 17, 2003. SECTION 2. In the event that there are instances where the dollar amounts or timing of capital projects included in this update differ from those in other sections of the Comprehensive Plan, the amounts and timing in this update shall prevail. SECTION 3. This ordinance authorizes the reformatting of the information in this update of the Capital Facilities Plan and the transmission of this information to the State of Washington as the City's Transportation Improvement Plan which is required on or before July 31, 2004. City of Bainbridge Island 2004 Capital Facilities Plan INTRODUCTION The 2004 update of the Capital Facilities Plan continues to build on the prior updates. Because the City is in the middle ora major review and update of the Comprehensive Plan, almost no policy changes have been considered this year. Also, plan updates from other local governments are included. As in last year's Plan, projects anticipated to be worked on aider the six-year planning horizon are shown in a single column described as "After 2009" rather than in separate categories. This choice matches reality in that at present the City really has little idea when a~er the year 2009 these projects will actually be constructed. It does strongly imply that the projects will not begin before 2009. As mentioned in the prior paragraph, the efforts of the City to plan capital facilities using a 20 year time horizon are, as yet, somewhat uneven. As is the case with most long-range planning, we have a better vision of the near-term than of the far. Further, the different agencies included in the Plan have not used a consistent planning horizon. The City has shown projects to be done for the full twenty years but has not paid much attention to those past the six-year horizon of the Financial Capacity Analysis. Both Schools and Parks have not yet planned beyond 2005; while Fire planned for a twenty year period. Sewer District No. 7 is in the process of preparing their first Comprehensive Plan and has no capital projects planned. Also because of the planning schedule for each of the local governments differs, summaries of plans for multiple agencies are not inclusive. This concentration on the six-year plan involves, the inclusion of the details of the maj or capital projects of the City and also an improved Financial Capacity Analysis. The City and the special purpose districts: Schools, Parks, Fire, and Sewer continue to work together to integrate their capital planning efforts to to provide a more even tax impact and to prioritize their projects while still providing quality facilities and services for the citizens they serve. This is consistent with Goal 6 of the Framework of the Comprehensive Plan (pg. 51 of the Land Use Element): All government entities strive to cooperate and serve their constituents in a fiscally sound manner; and Policy CFI. 10 (pg. 9) of the Capital Facilities Element: The Ci~ shall coordinate with other public entities which provide public services within the City to ensure that the Capital Facilities Plans of each of these entities are consistent with the City's Comprehensive Plan. This Element and the 2004 Plan update have been developed in accordance with the RCW 36.70A, the Growth Management Act (GMA), and WAC 365-195, the Procedural Criteria. It begins with a short review of some of the concepts behind the Capital Facilities Plan and the Capital Facilities Element of the Comprehensive Plan. Relation of Capital Facilities Plan to the Budget The Capital Facilities Plan and the City's Budget serve different but overlapping purposes. Both are prepared annually, although each could be prepared biennially under Washington law. The Budget authorizes the amount to be spent during the coming year; whereas the Capital Facilities Plan identifies needed capital facilities over a twenty year period. A requirement for the Capital Facilities Plan is that it show how the needed facilities will be paid for during at least a six-year period. Because Washington law requires that, for cities required to plan under the Growth Management As Approved by the City Council on December 17, 2003 1 Act, no money can be spent on capital projects which are not shown in the Capital Facilities Plan (CFP), it is important that the Budget not authorize spending on capital facilities not in the Plan. The following table shows a summary of the City's 2004 Preliminary Budget and shows (in bold) where the projects in the CFP fit in the budget: Summary of 2004 Preliminary Budget Description All Other Wtr/Swr Util Total Notes  Begi_nning Balances $6,038,023 $3,428,922 $9,466,945 As of 12/31/2003 Revenues 21,823,195 3,708,200 25,531,395 ~ :i ~ ;~'') 8,630,000 8,630,000 Net Interfund Transfers 65,000, (65,0001 0 Nets to Zero = Total $ Available 36,556,218 7,072,122 43,628,340 ........ - ~Operating Costs 15,532,143 2,570,456 18,102,599 -~Debt Service Costs 2,404,184 307,084 2,711,268 -1Capital Equipment 449,790 75,000 524,790 ylCapital Projects 14,374,168 997,000 15,371,168 = Ending Balances $3,795,933 $3,122,582 $6,918,515 Set by policy The above table shows a very s~mplified view of the Budget. This'(and any) budget starts with an estimate of the money available to be spent at the beginning of the budget year. To that is added the income and revenues expected to be received during the coming year. Also added are any direct additions to capital and any bonds or loans received from which costs can be paid. Also included for individual funds are interfund transfers. During 2004, these are expected to total $7 million; however, by their very nature these net to zero, and because of the way the above chart is simplified none occur between the categories shown. From the sum of the money available is subtracted the various categories of costs: operating, debt service an capital. While most capital spending (and all projects) is is included in the Capital Facilities Plan, some equipment and computer software is not. What remains are the ending cash balances which both provide a reserve for emergencies and can be used to help pay for the next year's spending. One source of paying for capital facilities which is not shown in the Budget is required "contributions" from developers. For example, part of the cost of widening Madison Avenue north of High School Road next year is expected to be paid by the developer of the property east of Madison as a requirement of approving the project. That contribution is not shown in the Budget because the amount is not fixed and it does not directly affect the City's cash records. Other noncash contributions are expected during the six-year period. What is a Capital Facility_? Capital facilities are those public facilities, including utilities, that are necessary for a government to carry out its functions to provide services to its citizens. Examples are roads, public buildings, schools, parks, water and sewer systems, fire protection, police protection, and libraries. Often the entire collection of these facilities is referred to as infrastructure. There are several categories of capital expenditures proposed in this plan. A key distinction is whether new or expanded facilities will serve existing residents or new growth. Expenditures may also be proposed to maintain or repair existing capital facilities (cure deficiencies). The categories are as follows and will be used to identify specific projects proposed in the six-year plan: As Approved by the City Council on December 17, 2003 2 (M) Major maintenance, repair, renovation, or replacement of an existing facility. Many of the rind projects are in this category. (E) New facilities or improvements to existing facilities that provide added capacity to serve the existing population. (N) New facilities or improvements to existing facilities that are built primarily to provide added capacityto serve new population or employment growth. Plans and Studies A significant amount of the projects anticipated to be included in the Capital Facilities Plan rely on various plans and studies needed to determine the capacity of various systems and the extent of problems in those systems. Although these studies drive many of the projects in the Capital Facilities Plan, because they are operating costs, they are not included in the Plan. The following table summarizes the plans and studies recently completed or that the City expects to complete in the next few years: 2003 Listing of Studies & Plans I Name of Study or Plan i Cost Due [ Non-motorized Transport'n Neighborhood Plan ! $250,000 Done ! Island Geologic Mapping 10~0,000 2004-5 Sewer Lift Station Studies ....... 30__,0002004 Waterfront Park Plan Revisions and Marina 30,000 2004 Transportation Plan 100,000 2004 Water System Plan 65,000 2004 Wellhead Study 50,000 2003 Nearshore Assessment 205,000 i 2003 ~ota__l $625,000! Levels of Service (LOS) Levels of Service (LOS) are usually quantifiable measures of the amount and/or quality of public facilities or services that are provided to the community and are usually expressed as a ratio of amount of service to a selected demand unit. For example, sewer LOS is expressed as 100 gallon per capita per day, public school LOS may be expressed as the number of square feet available per student or as the number of students per classroom. Police or Fire protection may be expressed as the average response time for emergency calls. Parks LOS is often expressed as the number of acres of park per 1,000 population. Once the level of service is decided upon it can then be determined what capital improvements are necessary to 1) cure any existing deficiencies, and 2) maintain that level as the community grows. The Capital Facilities Financing Plan The GMA requires that the Capital Facilities Element contain a financing plan that identifies the type and location of expanded or new capital facilities and the sources of funding that will used to pay for them There are two questions that must be satisfactorily answered: 1) What is the quantity of the public facilities that will be required during the six years? (identified in the inventory and needs analysis); 2) Is it financially feasible to provide the quantity of facilities that are required? (do we now, or will we, have the money to pay for them?) As Approved by the City Council on December 17, 2003 3 Dependable revenue sources must be identified that equal or exceed the anticipated costs. If the costs exceed the revenue, the local government must reduce its level of service, or otherwise reduce costs; or else modify the land use element to bring future development into balance with available or affordable facilities and services. This plan will examine each type of facility separately. The costs of all the facilities will then be added together in order to determine the financial feasibility of the plan. The Capital Facilities Plan is intended to be a planning document. It, therefore, does not contain the level of detail that the annual budget must contain. Some costs in the plan are estimated in order to give citizens a general idea of how much certain types of projects or facilities may cost. Criteria for Project Prioritization One of the problems with determining which projects to work on when has been the difficulty in determining project priorities. To some extent, priorities are set by the Growth Management Act and are noted in the section on "What is a Capital Facility" on page 2 above as "M", "E", and (that is, curing deficiencies is, by law, a higher priority than building to serve new growth). Beyond that, the City Council has used an ad hoc method of identifying high priority projects (maintenance of existing facilities mandated projects, targets of opportunity, etc.). This year's Capital Facilities Plan update process has proposed using four sets of criteria together. The four sets are: 1. Strong citizen support as measured by the Community Values Survey. 2. The criteria for policy CF 1.2 mentioned above (the "M", "E", and '2q"). 3. Financial effects (availability of grants and/or cost/benefit), and 4. Sequencing/Coordination (including timing factors). By evaluating each project against these four sets of criteria, it is hoped that the resulting priorities assigned capital facilities projects will optimize the sequencing of the projects and the effectiveness of the City funds used to pay for them. Capital Facilities Planning This Capital Facilities Plan is the product of many separate but coordinated planning documents and planning bodies. Each of the special districts (schools, fire, parks, etc.) has its own capital plan. The City has a Water System Plan, a Sewer System Plan, a Winslow Drainage System Plan and a Pavement Management System Plan. Each capital facility may have several sources of funding that include combinations of federal and state grant money, loans and general revenues (tax dollars). In addition, there are several subarea and neighborhood plans in progress, including the Island Center and Lynwood Center Special Planning Areas, and the Winslow Master Plan--each with its own capital requirements. Most facilities must be planned for years in advance and planning means determining not only when a facility will be needed but how it will be financed. For facilities that are projected for five to seven years in the future, capital costs are more estimates than actual. At the time for construction nears, actual costs am narrowed as design and engineering are completed. It is important to remember that Capital Facilities planning is not a once a year or once every two years effort, but an ongoing process requiring continual review as new information becomes available, conditions change, and priorities evolve. As Approved by the City Council on December 17, 2003 4 City of Bainbridge Island The following is thc City% 2004 Capital Facilities Plan. The Plan is organized by project category and each category includes: 1) a current inventory of facilities; 2) a narrative providing a general background of the planning activities and some discussion of future plans; 3) a discussion of level of service (LOS), if applicable; and 4) a six-year project financing plan which idontifics projects and funding sources for that section. A listing of known needs (sometimes without cost estimates) beyond thc six-year period follows. The timing of projects beyond the six-years horizon is also very nebulous. Other Comprehensive Plan policies that are implemented or furthered by this Capital Facilities Plan are the following: CF 1.2: The City shall prioritize the allocation ofresoarces to meet its capital needs in the following order: 1) major maintenance of existing facilities; 2) elimination of existing deficiencies; and, 3) provision of new or expanded facilities to accommodate new growth. CF 1.6: Ftmding of major capital facilities shall typically rely on long-term financing and not current revenues. The term of financing should generally be no longer than the useful life of the facility. CF 1.8: The City may apply various, alternative, funding mechanisms in the development of capital improvements identified in the Capital Facilities Element in order to optimally use limited City resources. Such mechanisms include joint ventures with the private sector, grants, or other means. CF 1.12: Funding for the City's water and sewer facilities shall be paid for primarily by users, except in unusual circumstances where the public benefit may justify the use of general funds. Drainage improve- ments and facilities shall funded by the City Stormwater utility which, as an Island-wide utility, may be supplemented by general revenue. When utility improvements, provide benefits primarily to a limited group of users the costs will generally be paid by the benefited parties through Local Improvement Districts (L.I.D.'s) or other means. As Approved by the City Coancil on December 17, 2003 5 City Administration City Offices Employees and offices of the City are located at several sites because of space constraints at the Winslow City Hall location. City staffhas grown to 122 full time employees and 6 part time employees as of September, 2003, an decrease of two full-time employees and a drop of one part-time employees since the last update. There are 5 employees located at the Municipal Court at Rolling Bay, 25 at the Police Station, 31 at the Public Works facility on Hidden Cove Road, and about 67 at City Hall. 2003 Cit', Land and Office Facility Inventor Building Owned or Building and Location Land Area Area Leased Office Uses City Hall ~ Administration, Finance, 280 Madison Ave. N 1.92 Ac 24,107 SqFt Owned I Planning, & Engineering Former City Hall Police 625 Winslow Way E 0.82 Ac 7,000 SqFt Owned Municipal Court Municipal Court, 10255 NE Valley Rd. n/a 2,289 SqFt Leased ' Hearing Exammer Steel Building + Office Trailers, Public Works Operations Former Public Works Yard i n/a 6,148 SqFt Owned & Maintenance Subtotal Staff Office Space 2.74 Ac 39,544 SqFt Bainbridge Island Courmons Social Services, Council 223 Bjune Ave. 0.38 Ac 4,975 SqFt ! Owned & Committee Meetings Bainbridge Performing Arts Land leased to BPA for (land only) 200 Madison Ave. N 2.45 Ac rffa Owned $ l/yr through May, 2081 Helpline House , No-cost lease to 282 Knechtel Way 1.07 Ac ~ 4,400 SqFt Owned i Helpline House Land w/City-owned utilities 15.42 Ac . ~_a ........... ~_wp__ed. _~ ~_Wells, pump staftons, etc. Public Works Facility I / O&M Offices, Shop, and 7305 NE Hidden Cove Road 12.62 Ac .... 21__,8_6.~_ Sq~Ft Owned / Covered Equipment Storage Unimproved land: High School Rd. near Madison 1.42-X~ .......... 0-v~n~d--[No use specified Head &the Bay 30.77 Ac Owned [ Wellhead protection Off Madison near Wyatt 0.43 Ac Owned ~ Future pocket park Lumpkin Property 11.00 Ac Owned Open space / park Suzuki Property ___15~._07.. '~C ........ Owned~F~u_m_re_ P_s!!c~e/Court Facilty . Salter Propert}/~. 5.00 Ac Owned Open space Johnson Farm .... !~4.? Ac ' Owned Open space Suyematsu Farm 15.00 Ac Owned Agricultural Land [ County Gravel Pit & Other 25.00 Ac Owned No use specified Vincent Road Landfill 40.00 Ac Owned Solid Waste Transfer Station Rockway Beach Parcels 0.49 Ac Owned Passive Park ~gi~Harbor) 11.66 Ac Owned Open space Othe[ ~pe_n Space Purchases 8.66 Ac Owned Open space Misc. unimprovedland 2.24 Ac Owned [ No use specified Total 215.86 Ac 70,787 SqFt ........... As Approved by the City Council on December 17, 2003 6 City Hall In 1997, the City Council selected a site for City Hall on property in the vicinity of the Bainbridge Performing Arts building, northeast of the intersection of Winslow Way and Madison Ave. In addition to property on the site already owned by the City, four additional parcels were acquired to assemble a site sufficient for the long range needs of a City Hall, a "Town Square", and parking. Construction of the new City Hall was completed in early 2000 and the building was occupied in mid-February. This decision implemented Policy W 1.6 of the Land Use Element (pg. 56) of the Comprehensive Plan: "The permanent location of City Hall shall be in downtown Winslow." Public Works Operations and Maintenance Facility In late 1998, the Public Works Yard was relocated from the 5-acre John Nelson Park site just north of Winslow Way on the east side of SR305 to a new, 12.6 acre site at Hidden Cove Road and SR305. Drainage problems, discovered during construction, are in the process of being corrected. Phase II of the construction of the new Public Works Facility at Hidden Cove has been deferred until after 2008. Police & Court During 2000, the former City Hall building was remodeled for use by the Police. Also, a 15 acre site was purchased at a cost of $450,000 for a permanent Police and Municipal Court facility. It is expected that the Police will occupy the former City Hall building and the Court to continue to lease space for seven to ten years before a permanent facility is built on the new site. Open Space / Agricultural Land Acouisition In the November 2001 general election, 67.6% of the voters authorized the City to issue up to $8 million in special-levy general obligation bonds for the purpose of acquiring and preserving forested areas, open space, wildlife habitat (including without limitation environmentally fragile areas, land along streams and ponds and wetlands) and farms and agricultural lands and creating new trails and passive parks. The first portion (amounting to $4.5 million of those bonds) was issued in early December 2002. 2004 Capital Facilities Projects -- City Administration / Facilities Projecti 'iPr~' i Before I After Project iority 2004 2004 2005 2006 2007 2008 2009 2009 * Totnl Affordable Housing $106 $109 $112 $115 $118 122 $682 ~!~ .H_~:[! Noise Reduction 32 32 I 64 Mobile Home Park Acq. Support 67 67 South S~oi~-s ~rea (E) 20r 328 348 Public Works Yard - N Annex (lq 100 268 ~ 100 300 1,577 2,345 Central Spoils Area (E) 733 733 North Spoils Area (lq) 236 236 Polio? _& Court (N) ! i ......................... 5,9~0_0 5,900 Total Projects 52 99 i 206I 705 112 215 418 8,568 10,375 Note: All mounts are $ in 000's 'WMP' indicates that this project rela~x:s to the Winslow Master Plan. A priority of"N" indicates that a project has not yet been given a priority. Once the indicated project has been prioritized, funding and timing will be assigned. As Approved by the City Council on December 17, 2003 7 2003 Public Works Facilities Inventory Facility Floor Area Function Portable office trailers (4) 2,520 SqFt * Storage, safety & future parks buildings Steel shop building 2,400 SqFt Storage - holds telemetry Wood frame building 1,245 SqFt Storage - John Nelson Small wood frame building 663 SqFt Storage - John Nelson PW Facilit~ - wood building 100 SqFt Well house P~V Facility - Shop 7,776 SqFt * Mechanics Shop / Equipment Maintenance PW Facility - Covered Equip't Stg 11,520 SqFt *- Covered Euipment Storage PW Facility - Office Trailer 1,792 SqFt_~ O & M Office Total 28,016 SqFt · These facilities are also counted in the main office inventory on page 6. The inventory of heavy equipment includes only those items with an estimated replacement value of $20,000 or more. Equipment replacement is based upon a standard of useful life for each type of equipment in the inventory. Smaller items (over $5,000) are treated as operating costs in this document but as capital in the annual budget and financial reports. 2003 Public Works Equipment Inventory Type of Equipment Quantity Water & Sewer Utility - Heavy Equipment 14 Water & Sewer Utility - Other Vehicles 8 - Heavy Equipment 29 Other Vehicles 30 81 Parks & Trails Most of the parks and trails on Bainbridge Island are owned and run by the Bainbridge Island Park and Recreation District. The City has a few which it owns but which are generally maintained (with the ex- ception of Waterfront Park) by the Park District under contract to the City. In 1997, the City developed a plan for the expansion of the facilities at Waterfront Park. This plan is expected to be implemented in stages over the next eight to ten years. During the past three years, the City has acquired or helped the Park District acquire a large amount of open space. Plans for this land have not yet been developed. 2004 Capital Facilities Projects -- City Parks & Trails Pri- Before [ After Project Project ority 2004 2004 2005 2006 2007 2008[ 2009 2009 * Total Open Space & Ag Land (iN) $3,000 $3,500 $6,500 Road End Improvements (E) ~ 25 25 26 27 28 29 3-0 450 640 Taylor Ave Memorial (N) 500 293 793 Waterfront Park (E) 10 418 86 144 1,150, 1,808 Landfill Development (E) I 590 590 Acq. WF Park Residence (E) ! 425 425 Acq. Wyckoff Property (N) ! 2,000 ! 5,900 7,900 IT°taIPr°Jects I 3,025 6,035 _ 26 ..... 27~___446 115 1741 8,808 t8,656 Note: All mounts are $ in 000's As Approved by the City Council on December 17, 2003 8 Transportation Facilities (Roads. Bike Lanes, Sidewalks, Trails) Of the five types of capital facilities that are constructed, operated and maintained by the City, the most costly and most familiar to citizens are the transportation facilities. Where there are facility needs that involve SR305 or thc ferries, the Washington State Department of Transportation assumes the costs. Kitsap Transit pays for facilities that support transit service. The citizens do pay indirectly for these services through other taxes. However, following with passage of Initiative 695, one of the largest sources of such funding, the Motor Vehicle Excise Tax, was repealed. At present, particularly in light of the passage of Initiative 747, funding for public transportation in general is at risk of severe reductions. The trunsportation system ontside of historic Winslow has suffered from "deferred maintenance". The Pavement Management System (PMS) study conducted for the City in 1992/1995 indicated the wearing surface of many of the roads to be at or near failure, especially the smaller suburban reads. Since many of the Island's roads were initially only scraped and then a thin layer of asphalt applied, the maintenance performed by the City is usually more extensive, and costly, than normal maintenance of "paved" roads. Many roads, having no substantial base before placing asphalt, need considerable base preparation. The PMS study indicated a need for $600,000 per year for 10-12 years in the annual reads maintenance and repaving program to maintain the roads at the then current status; but that studyassumed a normal road base. The City has attempted to "reconstruct" some of the roads, rather than just "maintain" their wearing surface, and while it is more time consuming and more costly (initially), the life-cycle costs will be less, and the citizens will have better roads to travel over. The $600,000 amount has proven inadequate to cover the more extensive "reconstruction" as well as normal repaving. In 1998 the City Council increased the annual amount for repaving to about $1,000,000; but that amount has often not been available. Also, in 1998 th'e City began a program using a "chip-seal" which has allowed many more lane miles to be recoverec for the same cost as asphalt overlays. Chip-sealing the roads to halt their deterioration is intended to buy the City time to accomplish the needed reconstruction before the failure of more of the Island's roads. The Public Works Department has been aggressive in obtaining grants and low interest loans to address the City's transportation improvement needs. Passage of Initiatives 695 and 747 have together with the downturn in the State's economy have made continued access to this sort of funding uncertain at best. As a result, future grants have been largely replaced with voter-approved debt in this year's update of the Capital Facilities Plan. Failure of the voters to approve that debt will for the deferral of the programs. Although not called for in the Comprehensive Plan, a draft Island-wide Transportation System Plan is in the process of preparation, with additional funding included in the 2002 budget. At this point, acceptance of that plan by the citizens and approval by the City Council is obviously uncertain. A complete discussion of transportation facilities and a detailed description of levels of service and proposed improvements can be found in the Transportation Element. Other Comprehensive Plan Goals and Policies that are implemented or furthered by the following transportation projects: TR 3.4: The transportation system infrastructure should be maintained in a safe and usable condition. As Approved by the City Council on December l 7, 2003 9 TR 3.10: Provide safe bicycle travel along roadways identified in the Bike Access Plan in Winslow, along designated school routes, and where needed for safety reasons. TR 3.11: Sidewalks shall be required in Winslow, along designated school routes, in areas where sidewalks have been historically located ( e.g., Fort Ward), and where needed for safety reasons. TR 4.21: Undertake spot improvement projects. Safety improvements could include: Reconstruction of key traffic bottlenecks and unsafe road segments; elimination of poor sight distances. TR 5.3: Aggressively seek available county, state, and federal money to: l) pay for (or at least mitigate) the effects of county, state, and federal mandates; 2) fund appropriate demonstration projects; 3) fund improvement projects which meet the overall Island transportation objectives. TR 5.4: Ensure that the Island's transportation system is planned in advance to have revenue sources sufficient to build and maintain it. 2003 Inventory of Transportation Facilities Type of Facility Description Example Length FRC 1 * State Highway SR305 6.8 miles FRC 2 * Secondary Arterial Miller Road 34.2 miles FRC 3 * Collectors Oddfellows Road 42.8 miles FRC 4 * Residential Urban Wood Avenue 22.0 miles I FRC 5 * Residential Suburban Spargur Loop Road 38.3 miles FRC 6 * Unimproved City Roads (gravel) Walden Lane 11.6 miles Subtotal 155.7 miles Without SR305 & gravel roads 137.4 miles Bike lanes** lhared roadway on paved shoulders I High School Road 23.5 miles Sidewalks Paved walkway i Madison Ave. 7.6 miles Trails ~edestrian, bike, equestrian, etc. [The Grand Forest , 6.9 miles · FRC - Functional Road Classification; Source: Public Works Department, Pavement Management Program (Kloim Leonoff) · * With the exception of SR305, bike lanes on Bainbridge Island are three to five foot paved shoulders. Bike lanes are reported in lane miles. SR305 is included here. The proposed projects listed below are identified as to whether they are for maintenance and/or repair (M), for added capacity for existing residents (E), or for added capacity for new population or employment (N). Winslow Master Plan and Timing of Prolects In 1998, the City Council approved the Winslow Master Plan. That plan included the identification of many projects intended to attract growth to Winslow in order to meet the concentration targets of the Comprehensive Plan. While the need to complete these projects has been established, their timing and method of funding have not. For example, the Winslow Master Plan calls for many of the projects to be funded by developer contributions. As a result, the timing of these projects depends on the timing of the As Approved by the City Council on December 17, 2003 10 related development. To accommodate this timing uncertainty, many of the Winslow Master Plan projects have been shown as occurring after 2009. This is when the City Can afford to build the projects if they are to be funded by taxes; however, the hope and intent is that they would be completed sooner with the help of the developers. An example of this is the upgrading of the water main on Madison Avenue which is expected to be completed eight to ten years earlier than otherwise with the help of contributions from several developments in the area. Also, the absence of funding for bike lanes should be noted. This is because a significant amount is expected to be spent on bike lanes as part of other transportation projects. 2004 Capital Facilities Projects - Transportation Project Project Total Roads Resurfacing - Annual $8,675 NMTP 1 - Spot Improvements qMTP2 - 20% Design 1,880 NMTP3 - Implementation 3,500 Ericksen Avenue (E) Madison & New Brooklyn (E) Winslow Way (Urban Planning) Winslow Wy (SR305 5,425 311 677 2,860 550 610 284 Ft Ward Hill Reconstr'n (E) 956 Halls Hill / Blakely Repairs (M) 292 1,569 158 375 265 265 1,136 1,136 741 741 I Bjune Drive (E) 357 357 I~s Road (N) ! 2,339 2,339 ~Day R~aa East (E) _ 1,221 1,221 ~Eagle Harbor Rd Cut Stabilization 273 273 Crystal Springs Area (E) 481 481 Hilde~s (E) 330 330 Page Total 3,027 19,109 45,861 Note: All amounts are $ in 000's "WMP" indicates that this project relates to the Winslow Master Plan. A priority of"N" indicates that a project has not yet been given a priority. As Approved by the City Council on December 17, 2003 I1 2004 Capital Facilities Projects -- Transportation (Continued) Project After I Project 2006 2009 * Total Madison Ave (WinWy - HS Rd) $1,897 $1,897 Manitou Beach Rd Repair 1,836 1,836 South Beach Drive Revetment 236 ! 236 Wing Point Road Reconstruction 1,322 1,322 Winslow Wy (Grow to Madison) 704 i Wyatt Way (HOB to Weaver) 908 i 908 Less: Managed Reduction Total Projects - This Page 6,903 Total of Prior Page 45.861 Charged to Water (2.041) Charged to Sewer (2,369) Charged to SSWM (3,343) C~pital Equipment 6,300 9,288 TotalTransportation 3,027i 2,4631 2,7451 3,6761 3,15_11 3,1101 7,6061 28,521[ 54,299 Note: All amount~ are $ in 000's "WMP" indicates that this project relates to the Winslow Master Plan. A priority of "N" indicates that a project has not yet been given a priority. Once the indicated project has been prioritized, funding and timing will be assigned. Projects which have not yet been assigned a priority are listed in alphabetical order. As Approved by the City Council on December 17, 2003 12 Water Domestic drinking water is supplied by the City of Bainbridge Island, North Bainbridge Water Company, South Bainbridge Water Company, numerous smaller public water systems (2 or more hookups), and over 1,000 private single-dwdling wells. Information in the Water Element of this Comprehensive Plan was prepared from the Winslow Water System Plan by R.W. Beck and A~sociatas in 1993. That plan is now being updated by Gray & Osborne. A review of all water systems on the Island was completed by Kato& Warren in late 2001, while an Island-wide water resources plan was prepared by Kato & Warren working with Robinson & Noble in December 2000. Level of Service: The levels of service in the Water Element for water systems on Bainbridge Island are the minimum design standards and performance specifications provided in the 1992 Kitsap County Coordinated Water System Plan. Fire flow requirements were adopted by ordinance 98-30 and Resolution 98-34 and are tiered to based on zoning and type of construction. Residences can satisfy deficiencies by installing individual sprinkler systems. Levels of service are as follows: Levels of Service for Water Pressure 30 psi residual Pipe sizing 8" diameter min. (where fire system is required) Storage "Sizing Guidelines for Public Water Systems" Quality Federal and State minimum standards Fire Flow Residential Zone R.04 & R. 1 = 500 gpm or sprinkler L Fire Flow Residential Other Zones = 1,000 gpm or sprinkler Fire Flow Commercial & LM = 1,000 gpm or don't build Inventory: The Bremerton-Kitsap County Health District records indicate approximately 170 water systems on the Island that have 2 or more households connected. The number of Group A & B systems are listed below. Following that is a summary of systems with more than 100 connections: Group A systems: 15 or more connections 44 Group B systems Under 15 connections 124 Systems with Over 100 Connections S~tern_ Capacity Capacity Storage # connections (ERU) (MGD) Volumes (gal.) Meadowmeer 212 398 0.53 235,000 North Bainbridge (PUD # 1) 1,643 2,028 0.45 860,000 South Bainbridge 950 i 1,114 0.90 562,000 Winslow 2,100 4,727 1.00 2,910,000 I Total ..... 4,~9__0~ ....... 8,267 2.88 Most existing water systems were established under state and local guidelines and generally provide high quality water at an adequate pressure and flow rate for residential use. However, because of the number of systems on the Island, it must be concluded that there are systems that may not be in compliance with Department of Health water quality requirements and may not meet minimum requirements of pressure and reliability. It is also concluded that most of the smaller systems have poor or nonexistent fire protection designed into their systems due to the cost of providing large diameter pipes and storage tanks. As Approved by the City Council on December 17, 2003 13 As part of an interlocal agreement between the City and the Kitsap County PUD #1, in 2001 the City developed an all-Island water system inventory (with the PUD funding the project) which will form the basis of a Water Comprehensive Plan. This plan is still in preparation and in its third year of work. Completion of the plan is expected in 2003. Winslow Water System The Winslow Water System is owned and operated by the City of Bainbridge Island under the direction and control of the Department of Public Works. It serves an area similar to the historic Winslow city limits plus Fletcher Bay and Rockaway Beach. The system gets all of its water from the eleven wells owned by the City. Water is pumped into the distribution system both directly from the well pumps and by booster pump stations. The system now has four storage reservoirs, and two additional reservoirs are planned in the six-year plan. Inventory of Winslow Water System Wells N_ a_~e_ Capacity Depth Present Yield HeadofBay#1 37 gpm 130 ft. __ 90 gpm Head ofBay #2 184 gpm 155 ft. 30 gpm together with #2 Lo~werHead of Bay #3 I10 gpm 150 ft. Weaver * -- 135 ft. I 30 gpm Fle~:~Bay 500 gpm 1,550 ft. 400 gpm IHead~fBay#4 91 gpm 135 ft. / 180 gpm [Hea~fBay#5 106 gpm 135 fl..~togetherw.![h_~4__ .HeadofBay#6 84 gpm 70 fi. / 55 gpm HeadofBay#1A 102 gpm 145 fi. / 85 gpm _Sands Ave. #1 105 gpm 1,023 ft. 200 gpm Sands Ave. #2 435 gpm 1,055 f~. 600 gpm Commodore Well 60 gpm 380 R. 20 gpm Taylor Avenue 70 gpm 544 1~. 70 gpm i;i''~1 I 1,884 gpm 1,690 gpm · Not a potable source - used for construction It has been determined that the Winslow Water System capacity is adequate to serve the needs of the potential build-out population under existing zoning and build-out to the highest density possible (to R-28) in the Land Use Element. The available sources are adequate to serve a potential population of approximately 7,900 or approximately 4,000 units. The system currently serves a population of 3,500 and approximately 3,500 residential equivalent units. There are, however, upgrades necessary to provide adequate fire flow in most areas, which have been identified in the Bainbridge Island Water System Plan, by R.W. Beck and the update to this plan done in July, 1995 and now in the process of being updated. The two most significant upgrades needed for fire flow are two large storage tanks. Other improvements include increasing the size of several of the City's water mains, which will be accomplished as major streets are repaved. In 1998, the City completed the connection to City water of 33 homes previously served by the Commodore Lane Water System, which had been condemned by the State Department of Health. Under Washington law, water purveyers, including the City, need water rights in order to be assured that it can continue to provide water. The City has "primary" water rights for 2,054 acre-feet per years and "allocated instantaneous capacity" for 3,037 gpm (about 60% over the City's present capacity). As Approved by the City Cotmcil on December 17, 2003 14 Other Water Services Provided bv the City In addition to the Winslow Water System, the City has acquired a water system providing water to some 65 residences at Rockaway Beach. As part of the acquisition, the City replaced a private system which had the distinction of having the only public water system in the nation with a well in the middle of a Superfund site as its sole source of water. A replacement system was provided by the City in 1995 with funding from a local improvement district and grants from the US Environmental Protection Agency and the Washington State Department of Ecology. Under state law revenues cannot significantly exceed the cost to provide service but must not be less than that cost. New hookups are charged according to the cost to connect plus a system "participation fee" to purchase a share of the capital cost of the system. A restructuring of these participation fees was completed in late 1997 so that the charges would match the demand placed on the system by new connection. Comprehensive Plan policies that are implemented or furthered by the following water projects are: WR 2.2: The City shall be responsible for facilitating reliable, high-quality water services and resources Island-wide. The City shall work with other governmental agencies, water purveyors, and citizens to preserve and protect the water resources of Bainbridge Island. The City shall assist citizens and water system purveyors to obtain reliable, high quality water service. WR 2.4: The construction of new water systems and the upgrading of or connection to existing systems shall be paid for through user fees, Local Utility Districts (LUDs), or other mechanisms that ensure that the cost is paid for by the service recipients. WR 2.5: Engineering specifications of new public water systems and expansions or improvements to existing public water systems shall meet City or other regulatory standards. CF 1.2: The City shall prioritize the allocation of resources to meet its capital needs in the following order: 1) major maintenance of existing facilities; 2) elimination of existing deficiencies; and, 3) provision of new or expanded facilities to accommodate new growth. As Approved by the City Council on December 17, 2003 15 Sanitary_ Sewage Disoosal The City of Bainbridge Island provides for the collection, treatment, and disposal of effluent in ~he Winslow service area. The Kitsap County Sewer District #7 treatment plant north of Fort Ward Park serving customers within the District's service area at the south end of the Island was completed in 1997. That system was extended in 1998 to allow connection by the Lynwood Center area, where sewage disposal had been deemed inadequate bythe Bremarton-Kitsap County Health District. Details of the Sewer District No. 7 system can be found in the Water Element. More detailed information on the Island's wastewater facilities may be found in the Wastewater Facility Improvement Plan, February, 1994 by Brown & Caldwell Consultants. A review of the treatment plan by H R Esvelt Engineering is presently under way. The City is studying the creation four local improvement districts (Emerald Heights, North Pleasant Beach, Blakely School, and Rockaway Beach) to connect areas of failing septic systems to Sewer District No. 7's treatment plant. The cost of these LID's has not yet been fully determined, but will be fully borne by the users. All other residents not within the service areas of the above districts rely upon on-site septic systems that require approval from the Bremerton-Kitsap County Health District. Level of Service: Levels of service for wastewater treatment systems are typically expressed as the number of gallons of flow per capita per day and the level of treatment provided by the treatment plant. The current and proposed level of service for the Winslow service area follow the Department of Ecology guidelines of 100 gallons per capita per day (flow) and secondary treatment. In areas not served by treatment plants, on-site septic systems must be built to Bremerton-Kitsap County Health District standards that consider combinations of lot size, soil type, infiltration capacity, depth to hardpan, and proximity to surface water among others. Inventory of Winslow Sewerage Facilities: The Winslow sanitary sewer system consists of two separate parts: the collection system, and the treatment plant. Collection system: 5.12 miles gravity sewer with pipes 8" to 16" in diameter 2.69 miles of force main with pipes 4" to 12" in diameter 11 pumping stations with 100-2,300 gpm pumping capacity Treatment plant: Secondary treatment facility located on Donald Place NE just east of the ferry terminal. The existing collection system capacity has been judged to be adequate through the year 2010 with periodic upgrades in pumping facilities, although the City like other sewage utility providers experiences seasonal inflow and infiltration problems. In 1997 with the acquisition of a television camera to check sewer lines, the City began an effort to locate points of inflow. The City plans to correct inflow problems over the next five years as shown in the attached plan. The existing treatment plant was designed to accommodate an effective population of 10,000 and now serves a population equivalent to 5,500 (with conversion of mukifamily and commercial customers to single-family residential equivalents). An upgrade was completed in January, 1996, at a cost of $2.5 million. A number of additional improvements costing some $2.9 million have been identified by H R Esvclt Engineering. Those improvements are anticipated to be phased in over thc next few years. The City had added emergency generators and telemetry to As Approved by the City Council on December 17, 2003 17 2004 Capital Facilities Plan -- Water i i :006 I YundingSources: i 2004· 2005 2007 i 2008 2009 Total I 1,897 Beginning Cash & Investments i 1,578 1,6651 1,7821 1,915I 2,0591 2,2131 11,212 Service Charges -- 244i 255[ 267I I Interest & Other Revenues 200 ~ 234~ 1,428 iUarticipationFees 85 -- 12 ~-1~-~_~___87 119! 132[ 550 Bonds & Other Sources (Net) 0 1,200 0 1,500 01 0 '1 2,700 Total Funding 1,863 3X00~--2,130 3,746 2,433 2,612~ 15,890 [ess=OperatingCns -rin ee 14051 4151 432! 4511 -Debt Service 120 217 183 ~ 264 263 -2~ 1,310 ~~'~ 859 920 904 943 -985 1,028 5,640 Funding Avail. for Projects: 6,271 Projects: Water Mains Upgrade - Annual Fletcher Bay Reconstruction High School Rd Booster Station Well Capacity Increase Telemetry Upgrade Program Sands Road Ozonation Water Property Acquisition (N) Weaver Ave Facility Reconstr'n New Wells - Drill & Equip 704 High Zone Reservoir 864 Pressure Zone Extension 268 Head of Bay Wells Upgrade 115 Wyatt-High Zone Main 237 Cherry Ave Wtr Main Upgrade 178 Grow Ave Water Main 565 Low Zone Reservoir (E) 631 Cave Ave Wtr Main Upgrade 141 141 Olypic Dr Wtr Main Upgrade 215 215 Wing Pt Wy Wtr Main Upgrade 302 302 6 6 Low Zone Reservoir Removal ~ 122 122 Sheperd-High Zone Main 97 97 Wellhead Protection 301 334 Share of Transportation Projects 1,101 2,041 0 Total Projects 5,621 12,064 / 6Year 1,94~'~- 112 113I 473 (591~ 409 Total Annual Excess / (Shortfall) 2,465 i Cumulative Excess / (Shortfall) 1,949/ 2,0611 2,1741 2,6471 2,056] 2,465 2,465' ~di~ ~s~& Investments 2,465 Note: All mounts are $ in 000% A priority of "N" indicates that a priority has not yet been assigned to this project. "WMP" indicates that this project relates to the Window Master Plan. As Approved by the City Council on December 17, 2003 16 the system to significantly curtail demands. Where possible, pump stations have been taken out of service to further reduce system costs. Esvelfs study found that the system had adequate capacity for the projected growth for Winslow well past 2012; however the system lacked redundancy. Addtional capital projects may be indicated following an inflow/infiltration analysis being done at the request of the Department of Ecology. in a separate effort, a comprehensive study of sewer needs was completed in 2000. The study, entitled "South Bainbridge Island General Sewer Service Plan", by Esvelt and American Engineering is also referred to as the "South End Sewer Plan." 2004 Capital Facilities Plan -- Sewage Disposal 2005 2006 [ 2009 6 Year i 2004 2007 2008 Total Funding Sources: Beginning Cash & Investments ~2~ Service Charges 1,44~ 1,591 1,703 1,830 1,968 ! 2,1151 10,647 Interest & Other Revenues 350 254 259 271 2831 2961 1,715 Participation Fees 5~ 391 349 345 344 351 1,835 Bonds & Other Sources (Net) I (331 3,5001 0[ 0 I 01 0 I 3,468 Total Funding [__. 3,345~_.fi,7371 2,311 2,4461 2,5951 2,762 17,664 Less: Operating Costs - Finance I 373 I 362 [ 377 394 411 430 2,347 Debt Service / 1871 64~- --6al 64~___~ ._ 646 3,405 Operating Costs - PW / 9741 1,056 i 1,050 1,096 1,145 1,031 6,353 Funding Avail. for Projecls: I 1,810i 3,677] 243~ ~--~'~-~--'~5~ 5,559I Pri~-~-B~;or~ --~' I After Project 2009 * Projee : nr, 20041 2004 12005 12006 12007 1200g 12009 Total_ ~CollectionSyste~,~nntal/ $100] $103I $1o61 $1o91 $112[ $1151 $1181 $I,7081 $2,471 ~u~ E-nd Sewer LID's (E) } 2,000 5,130 - / ; 7,130 UV D~ection (E) 440 100 .... ~ [ ! 540 aae I 4001 3,8961 ....... 4,296 Telemetry Equip. Upgrade (E) / I 15 i 10 10 30 65 [ Infiltration/Inflow (Ia)(M) / ! i 75 I 75/ 75 I 75 I 300 ~ih Station Upgrades Program (E / 'i I 1001 50! 1001 501 I 300 W!~g_Ps_i_n_t_S?wer (N) ! I J- 4 i ! [ 55 / 55 Share of Transportation Projects 33 203 i 26_4~_. 201/ 120/ 203 1,345: 2,369 Totn, rojects{ el[ ' i540 636 5&438 4201 4461 3,138 ,7,526 1,17~-'~431 (315t (1241 (27i 209 6YearTotal /" i Annual Excess / (Shortfall) 374/ E~i~~cumulative Excess / (Shortfall) 1,174 631/ 316~ 192/ 65/ 374 374 374 Note: All amounts are $ in 000's and are in 2001 $ (that is, no adjustment has been made for inflation). A priority of "T" indicates that this project is part of a Transportation project. As Approved by the City Council on December 17, 2003 18 Storm & Surface Water Management In the Winslow urban area stormwater is managed by a combination of piped collectors, roadside ditches and natural stream channels and is well-defined in the City o£Winslow Storm Water Drainage Plan, 1985. All other watersheds and sub-basins on the Island are drained by natural streams and roadside ditches only. The existing natural drainage system consists of wetlands, streams, sprin~, ditches, and culverts crossing the roadways and is labor intensive to maintain. The natural drainage system does currently remove stormwater but not without signs of distress from erosion, siltation, and water quality degradation. The drainage system is closely related to road maintenance issues. Due to thc somewhat incomplete or obstructed nature of the natural drainage system, there are many wet areas that are causing localized problems that result in flooding o£private property and roadways failing. With ~he 2000 Capital Facilities Plan, the City is significantly increasing its efforts to remedy as many problems as possible. However, some areas, because of thc manner in which they were developed are candidates for Local Improvement Districts to handle or improve drainage systems. A review of the 1985 City of Winslow Storm Water Drainage Plan, identified several necessary drainage projects for the area, many of which have been completed over the past few years. Under an intcrlocal agreement with thc Kitsap County P.U.D. No. 1, the City is working on a general update of thc 1985 plan to include the entire Island and to consider water quality as w¢11 as quantity. This plan includes four elements: (1) aerial photography and mapping (which is complete), (2) the storm water drainage plan which is near completion, (3) a water plan (mentioned on pages 11 and 12, and (4) a drainage basin assessment. This plan, completed by Karo & Warren Engineering in 2000 forms the first comprehensive storm water drainage plan of Bainbridge Island. As Approved by the City Council on December 17, 2003 19 2004 Capital Facilities Plan -- Surface Water Management 2oo4-f'2°o5r '-~ 2008 2009 ! 6 Year 2006 I 2007 Total Funding Sources: Beginning Cash & Investments 123 Service Charges 975 1,404i 1,4321 1,461I 1,4904 1,520~ 8,281 Interest & Other Revenues I 0 [ 0 0 0 0 0 0 TransfersfromGeneralFund ** I,~ 4001 2ooI 1751 oI _o_~ ~ 775 i1,375 1,604 1,607 1,461 T, iO~- 1,5201 Total Funding __.J._ __60~_ ____L ] )[ 9,056 Le~s: Operating Costs - Fin~ .......... l-193 1984 _20~ 215_~ 2241 234i 1,269 .... ~e~Service i 441 43/'--43 ..... ~' 431 43i 259 ( Operating Costs - PW 476 489/ 507 53~ 554i ~'~b-' - 3~135 Funding Avail. for Projects: 4,392 After Project Projects: orit~ 2004 2009' Total Drain Sys Upgrades $100 $1,708 $2,471 Fish Passage improvements 50 854 1,240 Bat~lc Point Area (Issei Creek) 176 Decant Facility ~ 443 Manitou Beach Salt Marsh 60 Bergman Road Culvert ] 97 Rose Loop Ravine Crossing 551 ~ _ 68 Eagle Harbor Drive 56 Taylor/Pine 57 Springbrook Creek 60 198 Fairview/Madrona Area 166 Beachcrest 30 30 Cooper Creek Restoration ~ 15 Lynwood Center/Pt White CB I 85 85 Manzanita Area 303 303 McRedmond/Wardwell Area i 182 182 Miller Road ~ Manzanita Ck 363 363 Mountain View Drive 157 157 Park Avenue 48 48' Pt. White Drive Area 192 192 Reitan Road 73 73 Rockaway Beach - 5300 Block 424 424 Venice Loop Area 460 460 Halls Hill Area 267 267 Hidden Cove ~ Coho Ck 334 334 Share of Transportation Projects 1,345 3,343 0 Total Projects 6,855 11,308 -~-'---411 611 421 74[ 671 116 6YearTotal II Annual Excess / (Shortfall) 402 CumolativeExcess/<Shortfall) -'4~.~ 1021 1441 219] 2861 402 402i Ending Cash & Investments 402 Note: All amounts are $ in 000's. As Approved by the City Council on December 17, 2003 20 CITY OF BAINBRIDGE ISLAND SIX-YEAR FINANCING PLAN The capital facilities and services discussed in the previous pages are the responsibility of the City to provide. The City's Capital Facilities financing plan is presented here, showing all sources of funding and compiling all of the City's anticipated capital projects (except utilities). Funding sources are displayed so that debt service on any proposed bonds is accounted for as though they were operating costs. Facilities and services discussed on the following pages are those of districts or entitles that are separate fi.om the City and have specific funding sources of their own. As the relevant pages show, some districts have done a greater degree of revenue projections than others. The City's Financing Plan calls for funding of about $1 million per year in roads resurfacing in addition to a lengthy list of specific road projects. In December, 1998, the City issued $9,900,000 in LTGO bonds ($8.6 million in net new proceeds) to pay for the construction of City Hall and to provide approximately $2.5 million in fimding for major road projects and open space/agricultural land purchase. In October, 1999, an additional $4.9 million was issued to pay for additional road and drainage projects plus the roughly $1 million cost of the High Zone Water Reservoir. Thereafter, because of the limitations placed on the City by the approval of Initiative 695, part of the road and non-motorized transportation, are expected to be funded by voter special levy General Obligation bonds such as the $8 million bond for open space acutorized by the voters in November 2001. It is assumed that if the electorate does not approve the special levy bonds the designated road, non-motorized transportation, and drainage projects will not be undertaken. Winslow Master Plan (VqMP) A Winslow Master Plan was developed under the integrated GMA/SEPA process and includes an Environmental Impact Statement. As a result, further EIS's do not need to be sought for projects described in the WMP. That plan, approved by the City Council in May, 1998, calls for major infrastructure upgrades in Winslow to serve as a magnet for development. Because a separate Financial Capacity Analysis was not conducted in conjunction with the WMP, funding for several of the WMP projects is not available from identified sources within the six year planning horizon. As a result, completion of some of the projects shown in the WMP has been deferred beyond the six-year horizon (unless developer contributions are available) and this update consequently amends the WMP. Critical Assumptions The following tables are based on a set of economic forecast assumptions that include: a 1.0% ~ 2.5 % inflation rate and little to no real growth reflecting a continued stagnation in the economy; limits on taxes imposed by Initiative 747 (plus new construction); and straight-line population increases based on 20,920 residents in 2002. Amora detailed Financial Capacity Analysis of the City can be found in an Appendix to this document. Financing for milities (drinking water, sanitary sewer, storm and surface water management) is shown separately with each utility segment (e.g. drinking water) and is excluded from the following table. Lists of the more important economic and financial assumptions are attached to the Financial Capacity Analysis. A General Overview of the Capital Facilities Plan is also attached for reference as a quick way to review the changes in this year's update to the Capital Facilities Plan. As Approved by the City Council on December 17, 2003 21 Summary of the Cityts Six Year Capital Financing Plan (except L.I.D.'s and Utilities) Funding Sources: 2004 2005___ _~006 2007 2008 i 2009 T~?_ta~l _ Beginning Cash & Investments 5,915 Operating Revenues : Prope~tyTaxes ...... ~,695 i 6,129 6,557 6,834 7,104 7,775 40,094 Sales & Use Tax 2,211 ~ 2,548 2,675 2,836 3,006 3,186 16,463 Utility / B & O / Other Taxes i 2,662 2,500 2,6001 3,317 3,466 3,622 18,168 LiCenses & Permit Fees ~ 280 234 246 i 460 488 517 2,226 0~her lnt~rgo-v~'~e~i ........ / 2931 3491 3601 3731 3731 ~791 2,128 Charges for Services / 1301 135I 142! .... 1501 160I 169I 886 Fines & Forfeits ........ / 2401 2081 218i 2321 2451 2601 1,403 Interest, Misc& Other / 1,2741 1,2861 1,3831 1,4191 1,4841 1,533 I 8,379 Operating Revenues / 12,7851 13,390114,182i 15,621116,327L_ 17,4431 89,748 Dedicated Revenues : Real Estate Excise & Other Taxes I 1,6711 i~8i ~i7551 ii~i31 1,890 1,9621 MVFuelTax [. 443[ 49214711482! 484~' 496[ 10,7562,867 Parking Revenues 3571 71 71 81 8i 8 [ 395 Grants Received i_~_,541I 5751 5831 5791 5811 58-0-/ 6,438 Interest Misc & Other 531 291 I 3071 2691 2841 282/ 1,963 Ded outed Revenues 8,131 4,718 4,890 5,025 5,234 5,436 33,433 ~~o~;~;~- i 3,5001 1,5551 2,706[ 2,2001 2,115I 6,8891 18,965 TotaISources of Funds 130,332119,662121,777122,846123,676129,7671142,1461 Operating Costs: Executive/Legislative 2,7341 2,2831 2,363 2,4451 2,531 2,619114,975 lntergovernment Expend's 7061 7941 822 851I 880 9111 4,965 Judicial' 3951 600 621 _64~__ 665.__ 688I Finance-General 2,7531 ~,,499] 2,587 2,677 2,771 2,868[ 16,154 Finance - Debt Service 2,1871 2,804 3,067 3,248 3,429 4,012 l~,7~-~- Police 25371 249l 2578 2,669 2,762 2,859 ~,~ Planning / Building '2,191 2,250 2,329 2,410 ~ 2,495 2,582 ~ 14,257 Public Works 1,604 I 1,636 1,693 1,753 I 1,814 ~ 1,878 10,378 Street & RoM Mainten~ce 1,968 1,914 1,981 2,051 I 2,1221 2,1971 12,234 Operating Capital Expend's 362 161 267 278 289 301 I 1,658 Net Tr~sfers to Utilities 400 200 75 I 0 0 ..... p 775 Operating Cos~ & Transfers to Utilities I 47,8381 17,632~ 18,4821 19,0231 19,7881 2~i~ 113,648I P~ks&Trails ~_~,035 .... ~_ ~~__ ~jJ_~_ 174 6,823 Tr~spomtion Equipment I 503/ 6901470: 450 4951380 I 2,988 I Tr~spoRationProjects ~ 1,96~ 2,055~3,2061 2,7002,61517,389~ 19,926] Total Capital ~ ~ ~2 / Expenditures&OtherUsesofFunds I 26,436~ 20,6091 22,8901 22,~31~ 23,198~ 29,275~ Ap~ualExcess/(ShoRf~l) i 3,896 ~947~_(1,113~ 115I 4781 492__ 2~ CumulativeExcess/(Sho~f~l) 3,8961 2,949/ 1,8361 1,951I 2,4301 2,922 ~ding d~h & Invesments I 2~221 As Approved by the City Council on December 17, 2003 22 B.I. PARK & RECREATION DISTRICT The Bainbridge Island Park & Recreation District provides park and recreation programs to Island residents under a two-year maintenance and operations levy cycle. Established in 1965, the Park District provides services and recreational opportunities to youth, adults, families, seniors, as well as our challenged populations. Examples of programs the District offers include aquatics, adult exercise, martial arts, gymnastics, youth sports, and cultural programs. Examples of events sponsored bythe Park District include bike and day hikes, ski school, Summer Music and Arts Festival, and a variety of youth camps, including arts, baseball / sol~ball, basketball, and soccer. Wednesday Evening Concerts in the Park Series are held weekly throughout the summer and are cosponsored with the City of Bainbridge Island. Additionally, the District provides staffing to the Senior Center and Teen Center. A brochure of class schedules and offerings is mailed to each Island household quarterly, and is available via the Park District's web site, biparks.org. The District also strives to assist community efforts to acquire open space, trails and expand aquatic and boating opportunities. The Park District's early achievements included negotiation and effective transfer of Federal government land. Battle Point, Eagledale, and Strawberry Hill Park were all acquired in this manner. Likewise the District is working in concert with the City's Open Space Commission to acquire easements for trail routes specified in the Park District's Comprehensive Plan and the City's Non- Motorized Transportation Plan. Significant open space efforts consistent with the Community Values survey have been added to public access acquired through donation, citizen-levy process, and state grants. The Park District is a joint partner with the City and such non-profit organizations as the Trust for Public Land and the Japanese-American Community in acquiring the previous Wyckoff site and con- verting this to memorial and passive use park and shoreline access area. The District's largest park construction project has been the addition ora new pool. This, the Nakata Pool, is just completing its first full year of operation. Additional ball field projects include expansion of Hidden Cove, now occurring in the 2003-2004 cycle. Sands Road Park opened for play in 2003 and was facilitated through an interlocal agreement with the School District. This example of joint cooperation al lowed additional savings through the use of school lands while the Park District spent capital funds on recreation development. The District is under discussion with soccer groups to facilitate development of additional field space for these user groups. Efforts are occurring now to develop John Nelson Park into a neighborhood park as well as provide a location for gymnastic space here or at the Transmitter Building at Battle Point Park. In the future, a community center incorporating expanded cultural, sports, and community activities will occur subject to future funding opportunities and consistent with the Comprehensive Plan. Volunteer efforts will continue with Blakely Stewardship, Earth Day, Trails. Swim and Dive teams, gynastics and the Foundation. As Approved by the City Council on December 17, 2003 23 The District has an elected board of five volunteer commissioners and maintains a staff of 22 full-time employees. Funding for operations is by citizen levy authorized under RCW 36.69 every two years. Voter approval is required for any major capital projects. Projects are included in this plan to aid community-wide planning and to provide for grant funding eligibility. Existing parks provided = 54.1 acres of park per 1,000 residents. The District has identified a variety of service levels for different types of parks and park facilities. Those levels of service are as follows: Park Type Definition of Park / Facility Level of Service Neighborhood Park ;A to ½ mile service area & minimum size 5 acres .9 acres / 1000 I Commanity Park V2 to 3 mile service area & minimum size 20 acres 2.1 acres / 1000 Island-Wide Park within ½ mile drive and minimum size 100 acres 5.3 acres / 1000 Parks - All Categories All parks except State parks 46 acres / 1000 Tennis / Multi-use Asphalt or concrete courts with nets I court / 2000 Ball Fields - 200' + Areas designed for softball and baseball 1 field / 2000 Ball Fields - 300' + Areas designed for adult baseball I field / 8000 Soccer Fields Areas designed for soccer including goals & nets I field/2000 Swimming Pools Covered pool suitable for year-rotmd use I pool / 10000 Volleyball Courts Outdoor court with net and sand / soil mixture 1 court / 5000 Mini-Parks/Tot Lots Not Defined Not Specified Spec Use Facilities Public art, parkways, historic sites, etc. ~ Not Determined Linear Parks / Trails Elongated area with lengthwise road or trail Not Determined Equestrian Facilities Areas primarily used by equestrians __l___.N°t Deternfmed Note: The City Council has agreed to accept the Capital Facilities Plans of other local agencies as they are presented rather than try to question other elected officials within the community. As Approved by the City Council on December 17, 2003 24 The following inventory includes the Park District's land type designation and the park site owner. Inventory of Park Sites Park Site i Owner Facilities I Size in Acres Resource Con~ervancy : Meigs Park Park District I None as yet 67.0 Acres Ted Olson Nature Preserve Park District Nature trail 10.0 W. Port Madison Preserve Park District Trails, picnic shelters, beach access 13.8 Manzanita Park Park District Horse & pedestrian trails 120.0 The Grand Forest Park District Horse & pedestrian trails 240.0 (3 pcs.) Gazzam Lake Preserve Park District Horse & pedestrian trails 294.0 Battle Point Park, North Park District Fishing pond, trails, picnicking 45.3 Athletic Parks/Playgrounds: Battle Point Park, South Park District Sport courts, fields, play area, trails, 45.0 Strawberry Hill Park Park District Sport courts, field sports, classrooms, Historical Museum, picnicking 17.8 Aaron Tot Park City Park Children's play structure 0.3 Eagledale Park Park District Sport courts, play structure, covered 6.7 : picnic shelter, art center Gideon Park , Park District Trail and playground 2.5 Hidden Cove Park , Park District Future ballfields and trails 7.8 Rotary Park Park District Ballfields & children's' play structure 9.8 Gazzam Park Park District Future ballfields, sport courts, trails 24.0 Sands Road Park ~ School District Future bailfields 10.0 Resource Activity Parks: Camp Yeomalt Park District Multi-use bldg, trail, picnicking 3.0 T^chookwap Park City Park Future water access & view, picnicking 1.0 Waterfront Park City Park Boat launch, picnicking, tennis courts, playgrotmd 8.1 Fay Bainbridge Park State Park Picnicking, camping, boat launch, volleyball, sandy beach 16.8 Fort Ward Park State Park Boat launch, picnicking, trails, beach access 137.0 Blakely Harbor Park Park District Picnicing, hand-carry boat access, shoreline 57.0 Recreation Centers: Island Center P_~k I Park District /· Community hall, picnicking i 2.5 I Linear Park/Trail: ~~~-a{k Park District -Trail and beach access 2.5 ~ South End Trails Park District Trails, easements, tra t mplementat on 4 linear miles !Special Use Facility: B. I. Aquatic Center Park District (leased) Aquatic Center 1.5 Point White Dock Park District ! Dock, fishing, clamming 0.3 Other: ' John Nelson Park [~/- ~-~r~c ......... Not presently in use 5.0 Lumkin Proper~ City Park Shoreline Access 7.0 Total I 1,155.7 Acres As Approved by the City Council on December 17, 2003 25 2003 Capital Facilities Plan -- Parks & Recreation I 2009 or 6 Year Funding Sources: 2003 2004 2005I, 2006 2007 2008 Later Total Beginning Cash & Investments I 950 Maint&OpnsTaxLevy 2,46~~ 2,~ levy I levy I levy I levy I levy I 4,920 Bonds /CIF Levy & Other Debt 1001 2001 13,7501 I I 4,125 Grants&Contributions I~5,600! 2,0001 2,2601 1,0001 1,000~ ....... 3. 11,87~5 InterestService Charges & Impact Fees& Other Income Total Funding 2,5551 8,1601 2,2001 2,2601 4,7501 1,000_1_ o~ 21,875 Less Operating Costs 2,460 l. 2,460 I [ n/a Funding Avail. for Projects: ~-- 95 i~5,~0~l-- '~,~;~0~'--;~,2~0~-~0~ 04 21,87511 Pti- 2009 or Projects: Later Total I Land Acquis#ion : Ag Lands Landfill Adjacent to Gazzam (Joint with City) Rockaway Beach (Joint with City) Pritchard Pk (Joint project with City) Facilities: Ballfield DevopmenffSchool sites ..... 800 Battle Pt Play Equipment 35 Battle Pt Park Redesign / Fields I 215 Battle Pt Park Tower 85 Battle Pt Center (Transmitter Bldg) 45 Battle Pt Hard Court 62 62 Blakely Harbor Park 250 Camp Yeomalt 290 Community Center 7,500 Eagledale Art Ctr Renovation 250 250 Fort Ward Neighborhood Park 0 Gazzam Park Wildlife Area 50 Hidden Cove Development 175 Island Center 65 65 Lovegren 20 Meigs Interpretive Center 150 Meigs Park Parking ~ 50 Ray W'mson Pool Renovation I 250 ~ 250 ~~ 300 300 [ Straw?erry Hill field Improvements 250 T'Chookwop Park Development 50 50 Trails - Multi-purpose I 150 Waterfront Park - Phase 1 / 175 Total Projects 5,990 977 21,217 ! 6Year I i Annual Excess / (Shortfall) Total /I 0 [---(;3~0i (6701 (5251 (2,7501 0 (4,235~ [Cu~fall)Endifi~ ~ I' 0] (290~ (960~ - (1,485), (4,235~ (4,2351 (4,235~(4'235~ Notes: All mounts are $ in 000's. The negative amounts represent funding from sources yet to be identified. As Approved by the City Council on December 17, 2003 26 B.I. SCHOOL DISTRICT No. 303 Bainbridge Island School District #303 is currently updating its Capital Facilities Plan in preparation for a future bond issue. The District is expected to complete the plan bythe end 0£2003. The District offers kindergarten through 12th grade (K-12) education to Bainbridge Island residents (and residents of other districts on a space available basis). School facilities are principally funded through voter-approved long-term bonds, interest on bond proceeds, state matching money and impact fees. School impact fees, collected and held by the City of Bainbridge Island since 1992, have funded nearly $5 million in construction of additional space in the Bainbridge High School and Sakai Intermediate Schoole Special levies can also be used to fund specific capital improvements, including the purchase of technology and other equipment such as school buses. School District operating costs are principally funded through a state apportionment formula and local tax levies. Wilkes Elementary and Blakely Elementary are located in the north and south sections of the Island. Ordway Elementary, Bainbridge High and Commodore Options School are located on the district's main campus, a 75-acre site at Madison Ave. NE and NE High School Road. The campus also includes district administration buildings, maintenance shops and grounds facilities, the transportation center, and a nature ~, area. The main campus also encompasses land leased to other agencies for a swimming pool, a teen center and a daycare facility. Woodward Middle School and Sakai Intermediate School are located on Sportsman Club Road between Highway 305 and New Brooklyn Road, less than a half-mile northwest of the main cam LEVEL OF SERVICE: School District LOS considers two criteria: 1) the permanent, physical space space available to house students; and 2) program capacity, which is a complex calculation involving the personnel and facilities needed to provide the desired classes and activities. The desired student-to- teacher ratios are: Student/Teacher Ratio  Grades K through 2: 122 students per teacher * .... 23 students per teacher * Grades 4 through 5: 27 students per teacher * Grades 6 through 8: 29 students per teacher Grades 9 through 12 29 students per teacher · Federal/State funding was made available in 2001 to lower class sizes at grades 1-4. This additional funding is provided on a year-to-year basis. RECENT EVENTS: One goal of the district's strategic plan is to partner more with the entire commun- ity for educational and recreational purposes. To this end the district has agreements with a consortium of community service agencies, led by Bainbridge Youth Services, to rent part of Commodore Options School; with the City for water provision and surface water/environmental education; with the Park District for additional sports fields and transfer of the former alternative high school building at Strawberry Hill Park with the Bainbridge Island Education Association for office space; with the Fire Department for a transmission tower site; and with the Meadowmere Water utility for a storage tank site. Proceeds from a technology levy approved in February, 1996 have improved computer access for students at all levels and for community members. As Approved by the City Council on December 17, 2003 27 The voters approved a $26.8 million bond in February, 1997. Along with interest and school impact fees, these bonds funded expansion and improvements at Bainbridge High School, construction of Sakai Intermediate School, and compliance with federal regulation regarding underground storage tanks and asbestos abatement. The school board approved a $3.4 million non-voted debt package in July 2003. The monies will be used to refund an outstanding bond issue, complete demolition of the Commodore Options School, provide a small addition at that same facility, and perform a number of other capital projects. PLANS FOR THE FUTURE: Page 1 of the School District's Capital Facilities Plan indicates that its purpose is to aid planning in order to: 1. Extend the useful life of existing facilities, 2. Enhance educational opportunities in program and technology, 3. Improve the learning environment by improving major systems, 4. Provide appropriate classrooms for all students, and 5. Acquire enough land to provide sites for future facilities. The District expects the following trends and conditions to occur over the next decade: 1. Continued enrollment growth, 2. Continued high expectations for the Island's children and their schools, 3. Continued rapid technological change, 4. Educational reform affecting the spaces needed to deliver programs in ways that cannot be foreseen, 5. Insufficient funding to support the desired page of educational reform (the pressure to defer defer maintenance will continue), 6. Increased concern about building environment and health, requiring updates in materials and systems, 7. Continued need for social and recreational facilities, to be met in part by school facilities, 8. Continued cooperation among Island agencies to meet the needs of children, 9. Continued dependence on voter-approved bonds to fund capital improvements, and 10. Continued demand for neighborhood schools and small buildings with smaller student class size at the elementary level. The District is completing a comprehensive Study and Survey of its capital facilities with a team of local citizens, school district staff, architects, engineers and students. The Study and Survey (last updated in 1997) will assist in the planning of capital improvements. The District will propose a bond issue to the the voters following the completion of the Study and Survey. The bond will finance projectm that will restore or maintain/preserve capacity, enhance operational and energy efficiencies, assure compliance with all statutory regulations, maintain/enhance safety and an optimal learning environment, and other projects as determined in the future to be necessary for the delivery of an appropriate education to the community's children. Under current state law, the District will need to obtain supermajority approval of the voters in order to fund needed capital improvements through this, and possible future, bond issues. OTHER CAPITAL ITEMS: The district's major capital assets include the properties discussed above, a district-wide technology network, and a vehicle fleet. The fleet currently contains 24 school buses, 7 special education buses, and 26 miscellaneous maintenance and motor pool vehicles. As Approved by the City Council on December 17, 2003 28 OPERATING COSTS: New buildings are primarily funded through long-term bonds, with contributions from state sources, investment earnings, and impact fees. The operating expenses of the District, including maintenance of facilities, are through state apportionment (73%) and local tax levies (19%). Federal sources and local efforts each provide about four percent of the operating budget. The state apportionment funding can be expected to grow in concert with increased enrollment and inflation. Operating funds are not available to support construction of capital facilities. Inventory of Facilities Building Building Program Capacity School Facility Ar~ea~ _Cla~s?fpo~m~s__ f~or__B_~d_i_ng~ Portables Capt. Wilkes Elementary 40,985 SqFt 14 334 5 12781 Madison Ave. NE ~pt. Blakely Elementary 42,450 15 357 4 4707 Blakely Ave. NE Ordway Elementary 51,193 16 381 6 8555 Madison Ave. NE Subtotal - Elementary I 134,628 ~_4~ 1,072 15 Sakai Intermediate School 66,536 22 600 9343 Sportsman Club Road NE ..... ;J~f~7~-- - Woodward Middle School / 24 696 9125 Sportsman Club Road NE/ [ Bainbridge High School 206,990 ! 60 1350 0; 9330 NE High School Road Commodore Options School * 53,508 28 616 9350 NE High School Road Subtotal - Middle & HS 404,581 134 3,262 Total Seho~i; 539,2091 I 179[ I ......... ~,-334~-~ ...... ~ ~dministration Center ! 4,999 n/a n/a 2 8489 Madison Avenue NE Maintenance Facility 9,000 n/a- n/a ......... 0 9120 NE High School Road Transportation Facility 4,500 n/a n/a 0 9451 NE ~_ew Brooklyn ......... Mandus Olson Property 40 acres Undeveloped Sands Road Property 10 acres Athletic playfield (used together with Park Dist) * Commodore Options School, formerly used as an elementary and middle school, now houses alternative elementary and high school programs, a home school support resource center, and a variety of early childhood and community service program: It was used to house students fi.om Bainbridge High School during construction (1998-99) and Sakai Intermediate School (1999). In summer 2003, 36,000 square feet of the old building was demolished and structural upgrades made to the remaining portion. Long-term use of this facility will require replacement of the roof, electrical, and mechanical systems. The older portions of Commodore may be demolished if it is determined that it is not cost effective to modernize those parts of the facility. As Approved by the City Council on December 17, 2003 29 2004 Capital Facilities Plan -- School District 2003/ 2004/ 2005/ I 2006/ 2007/ 2008/ 2009/10 6Year 2004 2005 2006 ] 2007 2008 2009 or Later Total Funding Sources: Beginning Cash & Investments Capital Levy (Technology) -~------1----- 500 i 500 I 5001 5001 I 2,000 Bonds /ClF Levy & Other Debt ~,415! 5,0001 10,0001 15,0001 10,0001 In/a 43,415 State Matching Funds I I I I 1,000 I n/a I n/a I n/a 1,000 Service Charges & Impact Fees i 500 500 500 500 500 5001 n/a 3,000 Interest & Other Income 50 50 70 200 200 200 n/a 770 Total Funding 3,965 6,050 11,070~ ~_~,_200 11,200 700 __n_(a_ 50,185 Less DebtService I n/a I n/a Fundingnvail. for Projects : I 4,6251 6,0501 11,070[.__17_,2001 11,2001 7001 n/a 46,220 2008/09 Project Projects: or Later Total High School Repairs, Add'n & Mod. 27,775 Technology 2,000 Blakely EIementary Repairs t 3,500 Ordway Elementary Repairs 3,500 Wilkes Elementary Repairs 3,500 Commodore Repairs & Mod 2,200 New Maintenance Facility 2,200 System Replacement Facility Improvement/Expansion PSELC Transactoin/Blakely Waterline Madison Avenue Road Improvement Misc. Capital Improvements fda Planning 90 ~Real Estate Purchase 500 ~ci~perperating Costs 1,605 0 Total Projects n/a 49,530 l 6 Year Total Annual Excess / (Sharffail) 2,3241 2,975 6 440 (4 235~ (1 840~ (4 345~ n/a 1,319 i Cumulative Excess / (Shortfall) 2,324 5,299 11,739 7,504T 5,6641 1,3191 n/a 1,319~ i Ending Cash & Investments 1,319 Note: All amounts are $ in 000's. Note the absence of an indicated maintenance & operations levy and also of operating costs. This is because the School District funds much of its operations from state apportionment and annual special levies. As a result, there is no operating surplus to fund capital improvements. The Bainbridge Island School District advises that it has not formulated capital plans beyond the year 2004, as so many of its needs are dependent on enrollment. Funding for capital projects is provided primarily through the use of voted debt. Such measures require supermajority approval of the district's voters and are therefore speculative. The projects listed have not been prioritized. Note: The City Council has agreed to accept the Capital Facilities Plans of other local agencies as they are presented rather than try to question other elected officials within the community. As Approved by the City Council on December 17, 2003 30 B.I2 FIRE DEPARTMENT Each year the Bainbridge Island Fire Department reviews and updates a Ten Year Plan to guide future operating costs and capital projects. The Department takes into account six factors in setting its capital project priorities: (1) completing prior year commitments; (2) meeting response times and emergency service goals adopted by the Board of Fire Commissioners; (3) following through with planned upgrades and replacements of facilities, vehicles and equipment; (4) supporting a community-based Department mostly staffed by volunteers; (5) provide the highest-level training and safety of emergency responders; and (6) promote self-sufficient fire stations for normal operations and for operations during storms and disasters. MAJOR ACCOMPLISHMENTS 1998-2003 In 1998, the Department completed a Master Site Plan for future fire station improvements. Based on this Plan, the Department completed several projects at the Madison Avenue Station including: replacing underground fuel tanks with a new above ground fueling facility (1999), constructing a new housing unit for volunteer resident firefighters (2000), making site improvements for drainage control and expanded parking (2000), apparatus bay expansion to house a growing fleet of vehicles (2002), acquisition of a new ladder truck (2002), shift staff office improvemems (2003), acuqisition of a new special operations/MCI trailer (2003), acquisition of two new staff/motor pool vehicles (2003), retrofit of two existing service vehicles to a type six brush/multi-purpose unit and apparatus repair/ maintenance vehcile (2003), purchase of a new single station diesel fuel station (2003), development of a rescue/extrication exercise area adjacent to an existing training tower (2003), and installation of a fuel line f~om the diesel tank at Phelps road to the drill ground tim pump (2003). ANTICIPATED SCHEDULE CHANGES AND FUTURE OUTLOOK Due to funding limitations set by Initiative 747, the Department has shifted schedules and re-prioritized projects in the latest dralt of the Ten Year Plan. Even with these changes, the Department's future facility and vehcile replacement plans will require voter-approved supplemental funding starting in 2005. Pending voter approval, the Department plans to complete phase two of a major remodel of the Madison Avenue Station (phase two involves an apparatus wash pad, expansion of the day room and radio room, improvements to the multi-purpose room and public restrooms, improvements to the kitchen area, and additional space for operations and administrative staff). Other facility improvements include installing independent fueling facilities at the Phelps Road Station. Within the next eight years, the Department will also replace two engine pumper trucks, two water tenders, two medical aid units, and a marine rescue boat. After 2008, the Department plans to add a wash pad at the Phelps Road Station and a new housing unit for volunteer residents at the Bucklin Hill Station. Apparatus and equipment will continue to be replaced based on planned schedules, subject to voter-approved funding. LEVEL OF SERVICE The Fire Department's mission is to save lives, protect property, and share responsibility for community safety. The Department responds to fire and medical emergencies, rescue situations and disasters. It also provides programs aimed at preventing fires and preparing both adults and children for emergencies. As Approved by the City Council on December 17, 2003 31 The Department currently responds to about six emergency calls each day, with 80 % of the calls involving medical aid and 20 % involving fires. The Department's goal is to respond within an average of five minutes from the notice of a call to arrival at the scene. In 2001, the Department responded to 340 fire calls and 1,712 medical aid calls. 2002 Inventor of Facilities i Building Floor Area Uses Headquarters Fire Station 21 Administration and operations, resident housing for 4 8895 Madison Ave. 16,564 SqFt firefighters, apparatus bay, multipurpose room S~on 22 Facilities and equipment office, resident facilities for 1~ Bt~ckl;m Hill Road 5,000 SqFt 2 firefighters, 4 stall apparatus bay, maintenance shop North Satellite Station 23 Resident facilities for 3 to 4 firefighters, 3 stall apparatus 12985 Phelps Road N.E. 8,500 SqFt bay, training classroom and tower, training/safetyoffice Storage Facility Two Stall Concrete Block Apparatus Bay 9421 NE Day Road East 875 SqFt (currently used for storage) Taylor Avenue Property n/a Vacant Lot Mandus Olson Radio Tower 80 SqFt Communications Shed with a 160' Radio Tower Total 31,019 SqFt 2003 Inventory of Vehicles ~o_c~tjon Apparatus Capacity/type / Fire Station 21 (Headquarters) Excursion Command / Operations Chief ' Car Fire Code Mgmt Officer Suburban Duty Officer Van General Transport Van General Transport Van General Transport Pumper 1250 gallons per minute Attack Engine I Pumper 1500 gallons per minute Attack Engine [Rescue Tmck Rescue/Equipment Vehicle /Tender 1500 gallon Water Tender /Tender 1500 gallon Water Tender Medic Unit_ Medic Unit - Advanced Life Support Aid Unit Aid Unit - Basic Life Support Utility Track Marine Rescue, brash skid pump & lighting Boat Trailered Marine Rescue Boat Spec Ops Trailer 20' trailer for MCI & Special ops equipment I Aeri_al Ladder 100' ladder track with pump Fire Station 22 (Bucklin Hill Rd) }_Maintenance Track Utility / Facilities & Equipment l Pumper 1250 gallons per minute Attack Engine Tender_ 2500 gallon Water Tender Aid Unit Aid Unit - Basic Life Support Fire Station 23 (Phelps Road) TenderPUmper . 25001250 gallongall°nSwaterPer minuteTenderAttack Engine Aid Unit Aid Unit - Basic Life Support Suburban General transport and Ttraining Total Apparatus Count 25 As Approved by the City Council on December 17, 2003 32 2004 Capital Facilities Plan -- B.I. Fire Department 4 Actual I I I 6 Year 12002 200320042005 I 2006 2007 [ _Tota Funding Sources: BeginningCash&lnvestments (Expense Fund) -- g~i1- ~7~ 3-9~ 42¥[ 4~ 4601 481 Maint & Opns Tax Levy 3,500/ 3,65~ 3,741i 4,635 / 4,754 4,8751 4,997 26,654 Supplemental Revenue Needed * ! 775 ~ 625 1,400 Transfer In from Reserve Fund ....... __7_ ......... ~ _~5 --- 5 26 Service Charges 196[ 1341 148/ 153/ 157 _1621 167 921 lnterest&Otherlncome 878[ _ ~2_~.__!~..._1_p_9~ .... 119 1161 112 644 Total Funding _ 5,~1_~42_} _4~60~5. ~_~5,1_ 7.0_~ 5,~32_3 5,475 5,6181 6,388 30,206 gessOpemngCosts ' 2,833i 3,160~ ~£5~--~379~ 3,8441 4,399] 21,971 Less Debt Service Costs ; 303 i- '-,i}~l -4~0~- 478 i ..... ~84~ 505/ 514 2,891 Less Funds Dedicated to Ending Fund Balance i737[~395/ 421 .... _n~o~.~ 460!-X~i-I 550 Funding Avail. for Projects (Capita~-~-an-~l~)q-' i]~-9[---~0~-~--9201 8851 852i '~g&]~- 925 Pti- After Projects: ority 2002 2003 2004 2005 2006 2007 2008 2008 Capital Facilities: Headquarters Station ] n/a q + ! q 40 Renovate Headquarters Station ] ~ ..... I}~1 .... ~2~ - - 400 400 400 4~' ~0~ Station 22 Improvements I n/a / l0/ 10i 10 10 10/ 5,358 Station 23 Impl:ovements n/a } q 133/ 10 10 10 10 10/ 473 Capital Equipment: Command / Utility Vehicles 62 156 EMS Aid Units Fire Engines 523 Aerial Ladder Track ~ I Tenders 141 _ 70 Marine Truck & Rescue Boat n/a Rescue Track Communications Equipment 30I Special Operations / 265 Other Total Projects 1,698 909 7,005 6 Year 2001 Ending Capital Fund Balance [ ~ Total Net Annual Excess / (Shortfall) -- (4291 (70t (41 125 (1321 (1531 16 (647) Cumulative Excess / (Shortfall) I __.~ 594/ -- 524~ 520/ 645 I 513/ 360/ 376 376 Ending Capital Fund Balance *** I 376 Notes: All mounts are $ in 000's. · Supplemental funds needed in each year due to 1-747 restrictions. Note: The City Council has agreed to accept the Capital Facilities Plans of other local agencies as they are presented rather than try to question other elected officials within the community. As Approved by the City Council on December 17, 2003 33 SEWER DISTRICT No. 7 Kitsap County Sewer District No. 7 was established in the early 1960's to take over the sewer system built by the military in 1900. In 1996, the District build a secondary sewage treatment facility with a design capacity of over 400 connections, an outfall, and major interceptor lines. Currently the District serves an area of over 450 acres, in addition to providing treatment to Lynwood Center through an Interlocal agreement with the City of Bainbridge Island. The District is presently in the process of updating its current Comprehensive Plan. This update should be complete by Spring, 2003. Elements of this update include: · A plant upgrade to increase reliability and decrease maintenance and operations costs · A continuing program to reduce inflows to the sewer system · Providing a public facility to enable citizens to have access to public records · Coordination with the City on available wastewater treatment capacity The District's yearly operating budget is approximately $120,000. 2003 Capital Facilities Pla· -- Sewage District No. 7 ITotaIF din 01 0! 01 0 0 i Funding Avail. for Projects: I 0~ 01 --~-I 01 01 01 0 Projects ! 6 Year : 2003 2008 Total 0 (None planned) Total Projects Note: All amounts are $ in 000's. Note: The City Council has agreed to accept the Capital Facilities Plans of other local agencies as they are presented rather than try to question other elected officials within the community. As Approved by the City Cotmcil on December 17, 2003 34 SUMMARY The following summarizes projects proposed by the various taxing districts on Bainbridge Island, during 2003-2008 and their effects on the taxpayers. Because different plans are for different time periods, the summary is not complete for all years. Summary of Capital Projects for All Bainbridge Island Taxing Districts 2002 i 2003 2004 2005 2006 2007 2008 6Year District Total City - Admin / Facilities n/a i $521 $991 $2061 $705I $112] $215I $1,389 City-Pm'ks&Trails n/a [ 3,0251 6,0351 261 271 446[ 115I 9,674 City-Transportation & Equipm't vda 3,027 2,463 2,745 3,676 3,151 I 3,110 18,172 Sob-Total: City-Tax Sppt'd 0 6,104 8,598 2,97~J_ 4,408 3,709 3,440 [ 29,236 Schools 2,305 3,075 __4,630 21,435 13,040 5,045 n/a n/a Parks 01 95 _~ 2,8701 2,785I 7,500[ 1,000[ 20,240 Fire [ 1,698 670 _92~ 760 984 941 909 6,886 Swr Dist #7 -Sewage Disposal 0 0 --~- 0 [ 0 0 0 0 Six Year Total (Excl. Util.) n/a 9,944 20,1421 28,042 21,217 17,195 n/a n/a City-Drinking Water n/a 740 427 ! 1,442~-'~4-98~'~,614 I 1,304 I 6,025 City - Sewage Disposal n/a 540 636 j 4,22(I 558 438 420 6,812 n/a 340 I CityCity .' LlDSt°rm & Surface Water - 2,000 ~I5,130744 81~1 809[ 598 I 601 I 7, t303'906 Six Year Total n/a 13,564i 27,078 34,51~ 23,08_2.~___1_9_,8_4. 5~_~ n/a~ [ Memo: Total City I n/a I 9,724l 15,5341 9,4~3~'-~:~773l 6,359[ 5,7651 53,108 Note: All mounts are $ in 000's. City Column for 2003 only includes projects with subsequent year's work. As Approved by the City Council on December 17, 2003 35 CITY OF BAINBRIDGE ISLAND -- 2004 Financial Capacity Analysis Critical Assumptions Revenues · Matched to 2004 Budget projections. · Property taxes are limited to the 1% increase on existing properties required by 1-747 plus $75 million a year in new construction. MVET replacement funding ended in 2002 and will not be resumed. · Development fees are roughly doubled in 2003 but not significantly changed later. · Water rates are increased 15% in 2004 (11% for debt service and 4% for operations) and thereafter as specified by ordinance. · Sewer rates are increased 4.3% in 2004, 9.5% in 2005 (5% for debt service and 4.5% for operations) and thereafter as specified by ordinance. · SSWM ntility rates are increased to $78.00 in 2004 and to $135.00 in 2005. · No special levies will be sought for operating costs. · $500,000 annually beginning in 2005 in capital grants from sources yet to be identified. Expenditures · 2003 costs are the Appropriated Budget. This serves as a baseline for future costs except 2004, which is also the Appropriated Budget. · Carryover of capital projects from 2003 to 2004 is included in the budgeted totals. · Operating costs will grow at a rate equal to inflation plus the real growth in the economy less 1% in each year (that is, there will be a continuing push to cut operating costs). Other · The Island's economy will remain flat until early/mid 2005 and then recover slowly. · The City will maintain its newly-revised policy on cash reserves (at least $1.25 million in reserves for tax-supported funds). · There will be no staffing increases from the 2004 level. · Local improvement districts will fund future costs of the South End Sewer projects (however, costs incurred prior to 2003 will be absorbed by the City). · Voted General Obligation bonds will fund all transportation and parking projects that are not funded by grants in 2005 and subsequent years. · As simplifying assumptions, timing of the purchase of open space properties will match the issuance of the remaining $3.5 million in open space bonds and all bond money from 2002 will be spent in 2003. · $2.7MM in water and $3.5MM in sewer capital projects will be funded by Public Works Trust Fund loans (20 years at 0.5% interest). · Significantly reduced taxpayer support for SSWM spending will be needed. CITY OF BAINBRIDGE ISLAND -- YEAR 2004 FINANCIAL CAPACITY ANALYSIS USES OF FUNDS EST. BUDGET 2003 2004 2005 2006 2007 2008 2009 OPERATING EXJ>ENDITURES Executive I Legislative $2,393 $2,734 $2,283 $2,363 $2,445 $2,531 $2,619 Intergovernment Expend's (Except Uti!) 752 706 794 822 851 880 911 Municipal Court 541 395 600 621 642 665 688 Finance - General 2,634 2,753 2,499 2,587 2,677 2,771 2,868 Debt Service 2,549 2,711 3,762 3,959 4,197 4,380 4,964 Police 2,322 2,537 2,491 2,578 2,669 2,762 2,859 Planning I Building 2,052 2,191 2,250 2,329 2,410 2,495 2,582 Public Works 1,573 1,604 1,636 1,693 1,753 1,814 1,878 Street & Road Maintenance 1,314 1,968 1,914 1,981 2,051 2,122 2,197 Utility Opr'g - Water 1,050 1,230 1,260 1,311 1,370 1,432 1,496 Utility Opr'g - Sewer 1,317 1,315 1,348 1,402 1,465 1,531 1,600 Utility Opr'g - Storm Water 515 669 685 713 745 778 813 Operating Capital Expend's 550 362 306 317 328 339 351 ----------- ----------- ----------- ----------- ----------- ----------- ----------- OPERATING EXJ>. + UEBT ~C $19,561 $21,176 $21,829 $22,675 $23,602 $24,500 $25,826 C~rr~li]~liJjij~f$E~(frjl!ll fIR) City Offices I Facilities 107 99 206 705 112 215 418 Parks & Trails 2,486 6,035 26 27 446 115 174 Capital Equipment 355 503 690 470 450 495 380 Transportation Projects 1,985 1,961 2,055 3,206 2,700 2,615 7,389 Utility - Water 240 427 1,442 498 1,614 1,304 418 Utility - Sewer 272 636 4,220 558 438 420 282 Utility - Storm Water 368 744 815 809 598 601 547 Local Improvement Districts 386 5,130 ----------- ----------- ----------- ----------- ----------- ----------- ----------- C~I1'#E~Jj~J'!!m~ $6,200 $15,534 $9,454 $6,273 $6,358 $5,765 $9,608 ----------- ----------- ----------- ----------- ----------- ----------- ----------- l'OT4LE:XPJil~~ $25,761 $36,710 $31,283 $28,948 $29,960 $30,265 $35,434 ~~~6';~t'.!t~~~$ 9,467 6,919 5,550 4,257 4,804 4,742 5,984 ----------- ----------- ----------- -------.--- ----------- ----------- ----------- TQW4L U~$;jj,,~s $35,228 $43,628 $36,833 $33,205 $34,764 $35,008 $41,418 Capital Improvement Plan--As Approved by City Council on December 17, 2003 i ' ~ _ PROJECT ,- ~ ~ E ~x NMTp7TS.ot~mprovementProgram PE~I 400 103 100 1~5 ~,Z0~ E ~ ~X NMTP2-Ne" ighb~r~oodPla~20YoDe~ign~E~ 70~ 250 250 250 1,000 E ' ,X ~ NMTP~-,mplemen~a~~ '' 0', 500 ~0 3,500 M X ~ ?~ad~Progra~~~ ~ 400 400 400, 400 400 400~ 5.600 E X ~Ericksen Imp2 (WinWay-Wall.) Car~Over ~ E ~Mad~°n A~ewBr~i~nl (HS-S~~ 1 0 E I Madison Ave&N~~~; 1 5[ :~1 1,019j E Madi~ Ave&NewBrklyn~~ ~ Winsl~w Way (U~b~~_' ~ ~; .......... i ~ 1 250 i , i E X ;~ ~ Winslow Way Imp1 (~cksen-~305) ~ ~ [' - % E X IX ~allace Way Sidewai~ ~ 1 ~7~' . Ix E ~X X ~Winslo~Way Imp2 (Madi~cksen) ~ ~2 ~-~ ' ' ' ,x i ~arking F~cilifies2 ~ ~~ 6 ,, 5,425 ~M~ ~t~?~ctionl- X ~ Madison & Wyatt Intersection1 _P~ 2 ~ , ~diso~ & Wya~ Inter~ecti~n2 ~ ~ ~, ~ 201 E X: x ~Eric~sen-~iide~ing (I~TS) ~ ~ ~; 52' I E X [ X 'Eri~s~n-Hildebran~ _~ ~ 0 ..... ~25 E X , X Ericksen:~ildebrand3Op~i~ ~C~ ~0 , 500 ! X i si30~ i~ierim Im~ Study1~ ~ 0 200 100 50, , i X [~R305 Interim improvements Study2 ~ t 0 ! 250 260~ PE = Design, RW = Right-of-Way, CN = Construction Screening: M = Maintenance, E = New Imp. for existing population, N = New Imp. for new population Page 1 of 7 trn/pwclerks/2004 BudgetJCIP Matching_04Budget Capital Improvement Plan-As Approved by City Council on December 17, 2003 m o z ~ PROJECT ~>: ~ ~ ~ ~ , ~ ; ~ X ~SR305 Interim Improvements Study3 CN~ ~ 0 ' 1,000 1,000 ~ [ ~ ~30~ ~°rridor Study ~ ~ 0 200 350 E ] Count~lubl Revet~e~ ~ 2 64 E ~ Count~ ~lub2 Revetme~ C_~ 3 ~6 RoCka~ay Beac~ R~ad Erosion1 PE~ ~ 77, Rockaway Beach Road Erosion2 ~ 4 207 E ~ 'Ft. Ward Hill1 Reconst. (nodh-end) ~ ~ 0 100 100, I E ~ i F~. Ward .i113 ~e~ .... ~ ~5 699 E Halls HilFBlakely Hill1 ~epairs E Hails ~ll/Blakely Hiii~ Repairs ~{ ~ ~ ...... 21~ E iX Wyatt Way Imp1 (Weaver-Madison) ;PE ~ 4 191 E iX wy~ttway Imp2~~ ~ 5 ; 289 E ~ iwyat~way Imp3~W~ ~ 6 i 1,089 E i :Wallace Way Imp1 (Madison-Ericksen) PE I 6 i 44 E ~ilace Way i~~~ CN ~7 ...... ~ - 158 E X ~ G~lm~7 (winway-wya~) ~ ~7 , - 58 E X ~r~w2 imP~ (WinWay-Wya~t~ ~ [ 7 - 207 E Ma~ tou ~ch Rd1 (Murden-F~ik) PE 7 - , 178 E ~ M~ito~ Be~h Rd2 (Murde~ R~ , ~ 7..... i i !~ 80 E i : Mamtou Beach Rd3 (Murden-Falk) CH,. 7 ' , 8 8 E~ X Wyatt Wa~ impi~k~e~ ,RE ~7 ~ ........ 131 E X ; Wyatt Way Imp2 (Madlson-Encksen) R~ ~ 7 ~ 85 E ; ~Bj~ Drive Imp~ (Wi~ay-Park) PE ~ 7 ............ ~ ~ i 83 E ~ Bjune Drive Imp2 (WinWay-Park) CN ~ 274 N X X ! :~ypass Road2 ~ ~ 7 , 243 N ,X X~ Bypass R~d3 - CN [7, ~ , -- ~-2,023 PE = Design, RW = Right-of-Way, CN = Construction Screening: M = Maintenance, E = New Imp. for existing population, N = New Imp. for new population Page 2 of 7 trn/pwclerks/2004 Budget/CIP Matching_04Budget Capital Improvement Plan--As Approved by City Council on December 17, 2003 Iii , , I I , ~. , '" I" I ' - , M " .!!! :> , N CL C .- Q. .... on CD ... co m ~ I: ! C. a.! ! " C 0 0 0 0 0 $ E rill I I - 0 0 0 0 0 0 0 ~ N I : N N N N !'" .. ~ ,8 ~ ~ PROJECT Gl , , , , , , >- .... M .... on CD ... ! I I _J , .- -- , - M 'Day RoadEast1 ... PE 7 146 M Day _F<o_ad East2 R 7, 8 - .. M [lay Road East3 _ CN 7 1,067 ... . -------~.._...._- E ----..- - . ,Eagle Harbor Rd. Cut Stabilization -- CN 7 273 , i , - ------- -- ---..-------- E , Cryst~Jlrings Area _ CN 7 ' 481 , ' . '--- I ---- _ E I i Hildebrand Imp1 (Wallace-HS) ,PE 7 .- 35 ---------- -- E Hildebrand Imp1 (Wallace-HS) CN 7 295 . . ~.- --- , ---,---- E X IX 'Madsion Ave Imp1 (WinWay-HS) PE 7 , .~ .----- E X !X Madsion Ave Imp,3. (WinWay-HS) CN 7 , 1,483 .,---- EI , --- --- PE Manitou Beach Rd1 Repair (Falk-Skiff) 7 118 . ,:M:~l"litou Beach Rd2 Repair (Falk-Skiff) ----- E CN 7 1,718 , ,-....------ ..--.-..,-- ----_.". i South Beach Drive Revetment PE 7 118 . 'South Beach DriVeRevetment CN 7' . 118 -- ------ .- -t--- .-..----- ---- .--- I ...--- EX INi,,9. PI. 1 Reconsl. (Ferncliff-Fairview) PE 7 237 , ,...._._u____ X Wing Pl.2Reconsl. (Ferncliff-Fairview) R 7 73 Ix i ---.." Win['p1.3Reconsl. (Ferncliff-Fairview) ,CN 7 1,012 , __'0- f-- . !INinslow_Way Wlmp1 (Grow-Madison) --_.-, ------ c... XX PE 7 146 _..n._.___ X !X _'INinslo"" Way Wlmp2 (Grow-Madison) R 7 6 IX Ix - ---. INinslo"" Way W Imp3 (Grow-Madison) CN 7 i 552 -,.-- --,---- ---- .. --,- 1\i\li'13lt Way Imp1 (HOB-Weaver) PE 7 83 . . WyaltVlJ..ai' Imp2 (HOB-Weaver) CN 7 825 ! - ------- , ____on. ---- ---- ST 2,382 2,987 4,342 3,542 3,088! 7,672 26,012 ---- .- _._0'.___'.-- ! , - ,ST - Transportation - Roads 1,859, 2,213 3,206 2,697 2,615 7,386 22,706 ST - Transportation - Water , 83 227 282 271 '--120 44 1,101 I 0' _.. ST - Transportation - Wastewater 54 248 264 201, 120 39 859 , - --- -. ! ST - Transpo,!ation - Storm Drain ..' 386 299 590 373 233, 203 1,345 , __._m'O_____ -- 0 0 o 0 0 0 0 - --------- - , ..... , PE = Design, RW = Right-ol-Way, CN = Construction Screening: M = Maintenance, E = New Imp. lor existing population, N = New Imp. lor new population Page 3 017 trn/pwclerks/2004 BudgetlCIP Matching_ 04Budget ---- " ,....-..------ - -- -----.---- .---..--- -.--.-- ~---_._- Capital Improvement Plan-As Approved by City Council on December 17, 2003 ~ ~ PROJECT ~ ~ ~ ~ ~ FACiLiTiES ~ ~t Hall ~o~s~ ~oduct~on .03Car~ Over- City ~ois~ R~dc ~ - ..~ 32 Affordable ~ousin~ - Gapital ~ 0 ~0~ _ ~0~ ~ ~2 ~ ~5 ~8 ~22 'Serenity House Acq. S~~o~ ~ ~ 2 [ .. 52' __ . Mobile Home P~k ~q. Suppo~ ~ ~ 1 67 , South Spoils1 Area~ ~ ~_~ 21'328 South ~oils2 Area PWYard N~nineA~tion PE~ ~ 2_ _ 100 PWYard N~~ti~ CN ~ ~ 3 2~ .WVa,~ N~x-A~m¢~ ~ ~ ~00 PWYard N~~- ~ ~ 6 300 PWYar~~ ~ .. ~ . 634 pWYard N~d V~i~/Equip.~ ~7 944 Central Spoils Area ..... ~ ~7 _ 733 North S~s Area ..... ~ ~ 7 ................... 2~ l~p~~lding _ . ~ ~ 7 5,900 ST- Facilities - General ~ ~ 99 ~[~.__ 105 __~!!_~ 215 41~ 8,568 Carry O~cmst~30~~ 45 D~6~ ~ ~03, ~oe ~09 ~2, ~ ~s ~,70s Fish Passage I~ve~ts ~ ~ 52 54 55 57. 58 60 854 ,Battle Pd~ Ar~ (1~~ ~ ~ 1 16 Decant Facility PE ~ ~ 0 100 Decant FacUlty CN~ ~ ~ 313 Manito~rs~e~ration ~ ~ 1 60 .... ~r~u~ve, Upgr~d~ ~ ~ ~ 12 Bergm~lv~ ~ ~ 2 85 [Rose LCavine ~ossing ~ ~ 55 'Eagle Harbo~ ~ ~ 56 ~Taylor/Pine PE/CN ..... ~ ~ ~5 .... 57 Spr~n~~~)- ~ ~~ ........ ~3'~ . Fai~iew/Madmna Area _ ~ ~6 166 Halls H~ea (3~'s) . ~ ~ 7 ...... 267 ,Hidden Cove ~ ~ho Ok ~ ~7 [Manzanita Area ~ ~ 7 303 Mo.e mon ,dwe,*r -1 .... 1 PE = Design, RW = Right-of-Way, CN = Construction Screening: M = Maintenance, E = New Imp. for existing population, N = New Imp. for new population Page 4 of 7 trn/pwclerks/2004 Budget/ClP Matching_04Budget Capital improvement Plan--As Approved by City Council on December 17, 2003 Miller Road@Manzanita CK @ 7 363 Mountain View Drive ~ "'@ 7 157 Park Avenue - - ~ 7- 48 Point White Drive Area ~ 7 192 Reitan Road ~ 7 73 RockawayBeach (5300 Block) ~ 7 424 Springbrook Creek (FletcherBay/HS) ~ 7 60 ST- Drainage ~ 388 572 219 225 368 344 5;511 PARKS&TRAILS ..... | .... , Waterfront Park Design Amendment ~ 1 10 Pritchard Park Acquisition 1 2,000 Open Spa~ ~ -3,50~TM - Road~ts-----~ 25 26 ~'~' 28 29 30 450 · Tayl~or~i-Design PE 1 500 Taylor A~ation -___Me__m_orial supp 7_ . _ ............ 293 WFPark Imp-Central Play Area ~ 4 30 * 193 WFPark Imp-~ ~ ~, ....... 225J WFPark ~t~r-'~' ~ 5 . 86 WFPark Imp-Upper Brian & Community Cent~ 6 144 WFPark I~~ 7 ~ 425 Landfill aevel_oPme_nt _ .~ ~ ~ 7 590 WFParklmp-Boat Ramp pier (~ 7 ' 531 WFP~tns/=1'~~ 7 - 295 WFPark Imp-~ce-,-b~-n~ 7 ' -- 177 WFPark ~bit-a-t-,~'~ ~ ........... 148 Wyckoff Property ~ 7 - ' 5,900 ST - Parks & Trails ~ 6,035 56 27' 446i 115 174 8,808 WATER . _ ~ ' . .Carry Over - Sands Road Ozonation _ _~ 1 .3_~ Carry Over - Wellhead Pro__t_e_~tio_n- ~ 1 5 WaterM~finsUpgrade-~r~-~-a~-- ~ 106 109 112 "116 119 122 1,750 Fletch~~~ 1 58 Fletcher Bay Reconstruct & Chlorination2 CNi~ 2 200 High School Rd1 Booster Station PE~ 1 90 High School Rd2 Booster Station CN! 2 928 ' ........... Well Capacity Increase ~ 1 100 'Telemetry Upgra~le Program ~ ~ 15~ ~ 15 15 30 Water Propert~n ~ 4 561 Weaver Ave. ~acilit'y Reconstruction ~ 3 ~ 51 PE = Design, RW = Right-of-Way, CN = Construction Screening: M = Maintenance, E = New Imp. for existing population, N = New Imp. for new population Page 5 of 7 trn/pwclerks/2004 BudgetJCIP Matching_04Budget Capital improvement Plan-As Approved by City Council on December 17, 2003 Q. o o ~ _ PROJECT ' ' ' New Well Drill & Equip1 53 New Well Drill & Equip2 , 651 High Zone Reservoir 864 Pressure Extension (Finch to Sportsman) Head of the Bay Wells Upgrade Wyatt-High Zone Main (Madison-Grow) Cherry Ave1 WM Upgrade (South of Win Cherry Ave2 WM Upgrade (South of Win Grow Ave1 WM Upgrade (HS-Wyatt) Grow Ave2 WM Upgrade (HS-Wyatt) 7 Low Zone Reservoir 7 Cave Ave1 WM Upgrade (Gilmore-WinW 7 47 Cave Ave2 WM Upgrade (Gilmore-WinW CN Olympic Dr. SE1 WM Upgrade (WinWay- PE Olympic Dr. SE2 WM Upgrade (WinWay- CN Wing Pt. Way1 WM Upgrade (Ferncliff-Az Wing Pt. Way2WM Upgrade (Ferncliff-Az Grow-High Zone Main (Wyatt-Sheperd) WM Navy Housing Sysem Acquisition ~ ' Pressure Zone Extension 182 Low Zone Reservoirs Removal Sheoerd-High Zone WM (Grow-GovWay) Wellhead Protection ST -Water 394 1,252 WASTEWATER Collection System Upgrades-Annual 103 106 109 112 115 1181 1,708 South Island Sewer1 South Island Sewer2 CN UV Disinfection PE/CN Carry Over 100' WWTP Upgrade Design 400 WWTP Upgraae Implementation 2 Telemetry Equipment Upgrade Program 15 10 10 30 Infiltration/Inflow (l&l) Program 75 75 Lift Station Upgrades Program Wing Point Sewer ST - Wastewater 5,733 LID Funds ST - Wastewater Fleet Equipment 320 400 445 PE = Design, RW = Right-of-Way, CN = Construction Screening: M = Maintenance, E = New Imp. for existing population, N = New Imp. for new population Page 6 of 7 trn/pwclerks/2004 BudgetJCIP Matching_04Budget Capital Improvement Plan--As Approved by City Council on December 17, 2003 o o o PROJECT ~. Other Equipment Totals ~ 2_7~4- 80 50 50 50 50 700 ST - Equipment ~ 594 -'6~ 47~ 450 495 38_0~_6,300 TOTALS: ST - Transportation - Roads 1,659 2,213 3,206 - 2,697 2,615 7,386 22,706 ST-Transportation -Water ~ 83 227 282 271 120 44 1,101 ST - Transportation - Wastewater 54 _ 24_8 26_4_ ~ 201_ 120 39 859 ST- Transportation - Storm Drain _ 366 299 590 373: 233 203: - 1,345 ST - Facilities 99 278 705! 112' 215 418 8,568 ST- DrainaGe ~ -' 388 572 2~9 225 368 344 5,51 ST - Parks & Trails ~ 6,035 5~ _2~7__. 446 115~ 174 8,808 ST- Water ~ 394 1,252 218 1,343 1,164 374 4,519 ST -Wastewater 603 4,017 294 237 300 243 1,793 ST- LID ~ 5,130 ST - Equipment . ~ 594~ 690 470 450 495 380 6,300 GRAND TOTAL ' 15,625' 9,853 6,273 6,354 5,765 9,605 61,511 PE = Design, RW = Right-of-Way, CN = Construction Screening: M = Maintenance, E = New Imp. for existing population, N = New Imp. for new population Page 7 of 7 tm/pwclerks/2004 BudgetJCIP Matching_04Budget