Loading...
TBD RES 2014-02TBD RESOLUTION NO. 2014-02 A RESOLUTION of the Bainbridge Island Transportation Benefit District approving a material change policy. WHEREAS, chapters 36.73 RCW and RCW 35.21.255 authorize the City of Bainbridge Island to establish a transportation benefit district within the City jurisdiction for the purpose of acquiring, constructing, improving, providing, and funding transportation improvements within the district that are consistent with existing state, regional, and local transportation plans and necessitated by existing or reasonably foreseeable congestion levels; and WHEREAS, the City Council of the City of the City of Bainbridge Island found it to be in the best interests of the City to establish a citywide Transportation Benefit District consistent with Chapter 36.73 RCW, to protect the City's long term investments in that infrastructure, to reduce the risk of transportation facility failures and improve safety, to continue optimal performance of the infrastructure over time, and to avoid more expensive infrastructure replacements in the future; and WHEREAS, in Ordinance No. 2010 -07 -040, the City Council of the City of Bainbridge Island established Transportation Benefit District No. 1 as authorized by RCW 35.21.225 and subject to the provisions of RCW 36.73; and WHEREAS, RCW 36.73.160 requires the 'Transportation Benefit District to adopt a material change policy to address major plan changes that affect project delivery or the ability to finance the plan, and address material changes to cost, scope, and schedule; the level of change that will require governing body involvement; and how the governing body will address those changes, now therefore THE BAINBRIDGE ISLAND TRANSPORTATION BENEFIT DISTRICT DOES RESOLVE AS FOLLOWS. Section 1. Material Change to Cost. In the event an approved transportation improvement project exceeds its original cost by more than twenty percent (20 %), the governing body shall hold a public hearing to solicit comments from the public regarding how the cost change should be resolved. TBD staff shall consult with the Board President prior to setting the public hearing. Section 2. Material Change to Scope. In the event the scope of a transportation improvement project materially changes from that originally anticipated at project approval, TBD staff shall consult with and review the changes with the Board President. The Board President shall determine whether or not to convene a meeting of the Board for discussion. Section 3. Material Chanue to Schedule. In the event that the schedule of a transportation improvement project materially changes in a way that significantly impacts other TBD projects or funding or schedule changes exceed ninety (90) days, TBD staff shall consult with and review such changes with the Board President. The Board President shall determine whether or not to convene a meeting of the Board for discussion. PASSED by the Bainbridge Island Transportation Benefit District this IOth day of March, 2014. APPROVED by the Chair this 10`" day of March, 2014. By: ,A Dave Ward, Chair ATTEST /AUTHENTICATE: Rosalind D. Lassoff, Clerk ofAhe District FILED WITH THE CITY CLERK: November 18, 2013 PASSED BY THE BAINBRIDGE ISLAND TRANSPORTATION BENEFIT DISTRICT: March 10, 2014 TBD RESOLUTION NO, 2014- 02