ORD NO. 2016-26 ADOPTING THE 2017-2022 CAPITAL FACILTIES PLANOrdinance 2016-26: 2017-2022 Capital Facilities Plan Update ORDINANCE NO. 2016-26 AN ORDINANCE of the City of Bainbridge Island, Washington, adopting the 2017-2022 update of the six-year Capital Facilities Plan and amending the Capital Facilities Element of the Bainbridge Island Comprehensive Plan. WHEREAS, in accordance with the Growth Management Act, the City of Bainbridge Island adopted a Comprehensive Plan on September 1, 1994, and revised it on December 8, 2004, and will complete an update before the end of 2016. The Plan contains a Capital Facilities Element that establishes goals and policies for the provision and financing of capital facilities for the citizens of Bainbridge Island; and WHEREAS, the Growth Management Act requires that the six-year Capital Facilities Plan be updated at least biennially and adopted as an amendment to the Comprehensive Plan, and Comprehensive Plan Policies CF 1.3, 1.4, and 1.5 require an annual update; and WHEREAS, the 2017-2022 update of the six-year Capital Facilities Plan addresses all of the goals and requirements set forth in the Growth Management Act and the Bainbridge Island Comprehensive Plan; and WHEREAS, the 2017-2022 update of the six-year Capital Facilities Plan is in accordance with the decision criteria for amendments of the Comprehensive Plan as set forth in BIMC 2.16.190; and WHEREAS, the Planning Commission and the City Council have received, discussed, and considered testimony, written comments, and materials from the public; now, therefore, THE CITY COUNCIL OF THE CITY OF BAINBRIDGE ISLAND, WASHINGTON, DOES ORDAIN AS FOLLOWS: Section 1. The 2017-2022 update of the six-year Capital Facilities Plan of the Capital Facilities Element of the Bainbridge Island Comprehensive Plan, attached as Exhibit A, is adopted as of October 25, 2016. Section 2. In the event that there are instances where the dollar amounts or timing of capital projects included in this update differ from those in other sections of the Comprehensive Plan, the amounts and timing in this update shall prevail. Section 3. This ordinance authorizes the reformatting of Exhibit A into a final edition for publication and the reformatting of information and the transmission of this information to the State of Washington as the City's annual State Transportation Improvement Program (STIP). Page 1 of 2 Ordinance 2016-26: 2017-2022 Capital Facilities Plan Update Section 4. The six-year Capital Facilities Plan of the Bainbridge Island School District No. 303 adopted on September 11, 2014, is adopted by reference. Section 5. The six-year Capital Facilities Plan of the Bainbridge Island Metropolitan Park & Recreation District adopted by Resolution No. 2014-14 on July 10, 2014, is adopted by reference. Section 6. The Strategic Plan, 2013-2022 of the Bainbridge Island Fire Department adopted in October 2013 is adopted by reference. Section 7. The six-year Capital Facilities Plan of the Kitsap County Sewer District No. 7 for the years 2013-2018 is adopted by reference. Section 8. The six-year Capital Facilities Plan of the Kitsap County Public Utilities District No. 1 for projects on Bainbridge Island is adopted by reference. Section 9. If any section, sentence, clause, or phrase of this ordinance shall be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause, or phrase of this ordinance. Section 10. This ordinance shall take effect and be in force five (5) days from and after its passage, approval and publication as required by law. PASSED by the City Council this 25th day of October, 2016. APPROVED by the Mayor this 25th day of October, 2016. Va Tol son, May ATTEST/AUTHENTICATE: Rosalind Lassoff, City 'lerk FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: PUBLISHED: EFFECTIVE DATE: ORDINANCE NUMBER: October 7, 2016 October 25, 2016 October 28, 2016 November 2, 2016 2016-26 Page 2 of 2 City of Bainbridge Island, Washington 2017-2018 Proposed Budget CAPITAL IMPROVEMENT PLAN SUMMARY The Capital Improvement Plan (CIP) represents an important element in the city s long-range and strategic planning. The CIP is a mule -year planning tool used to identify needed capital projects for improvements to the City's owned and operated infrastructure and to coordinate the financing and timing of these improvements. The CIP document is a roadmap for the next six years, and is strategically implemented to address the City s sic key priorities; safe city, green well-planned community, reliable infrastructure and connected mobility, healthy and attractive community, vibrant economy, and good governance. Capital asset is defined as real or personal property that has a unit acquisition cost equal to or greater than $5,000 and an estimated useful life of one year or greater. Projects and assets that do not meet both of these requirements shall be considered operating expenses and included in the operating budget Major repairs will be capitalized only if they increase the value, extend the useful life beyond the original estimate, or increase the capacity, capability or efficiency of the existing capital asset Fiscal year 2017 capital improvements are incorporated into the 2017 — 2018 Biennium Budget The following pages organize each project by project type, such as: transportation, non -motorized, fleet & capital equipment, facilities, water, sewer or stormwater. For each section, a "Level One" sheet lists the project, estimated costs, and whether or not the project has potential grant funding. For capital projects that have spending authority this biennium, there is an additional "Level Two" sheet describing the project, its benefits, estimated schedule, funding sources and uses, and estimates the on-going annual impact on the operating budget 2017 CAPITAL IMPROVEMENT PLAN SUMMARY BY PROJECT TYPE TOTAL $6,106,000 Transportation 8% SSWM 10% Sewer 7% Non Motorized 13% Water Capital Equipment 9% 10% Facilities 43% CITY OF BAINBRIDGE ISLAND TRANSPORTATION CIP (2017 - 2022) 2017 - 2018 PROPOSED BUDGET Amounts in thousands E==tea 0. u E b wQ E E p LO) d Project Location B 'LL aEiVVV1 B " 3 2017 2018 2019 2020 1 2021 2022 2023 - 2036 ,3 1 1 1 1 TRANSPORTATION PROJECTS - 6 -YEAR CIP Wyatt Way Reconstr. Ph 2,516 1,600 - 2,100 - - - - I Madison - Lovell X X Y Intersection X - 180 820 - - - Sportsman Club/New 155 Y - - Brooklyn Im rv. 510 - - - - - - Wardwell Rd Recon & - - Drain Wardwell Rd Y Y - - Country Club Rd Recon & Pst Toe jam to - - 25 250 - - - Drain Seawall Murden Cove - Y - - Manitou Beach Rd - - - 50 500 - - Stabilization Falk Y - - - - 50 500 - Manitou Beach Rd 71 - - Stabilization Falk to Skiff Y City Funding 5121 510 697 845 300 550 500 - Grant Totals 1,088 - 1,583 - - - - - TOTALS . 1,600 510 2,280 845 300 550 500 - Amounts in thousands Project: Wyatt Way Reconstruction Phase I Location: Madison to Lovell Number: 00708 IryI R q%Y 4" 4�-jl lo'LME �• GR- LANE AAbXTO � C Description: Capacity (level of service) improvements to the intersection of Madison and Wyatt. Possibilities include round about or signalized intersection. Complete sidewalk and bicycle facilities on both sides of the street from Madison to Lovell. Reconstruct roadway surfacing and drainage. Additional right of way needed along frontage. Design 50% completed in 2006. State (TIB) grant funding received 2015. Benefit: Relieve current and future intersection congestion and ensure mobility by implementing improvements prior to development. Address a gap in non -motorized facilities to improve mobility and safety. Support businesses and employment in the downtown area. Schedule: YRI/2 Design, ROW & Permitting, YR3 Construction Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -total $10 $0 $13 $0 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $512 $0 $672 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $1,088 $0 $1,428 $0 $0 $0 $0 $0 Sub -total $1,600 $0 $2,100 $0 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting $1,600 Construction $2,100 Sub -total $1,600 $0 $2,100 $0 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -total $10 $0 $13 $0 $0 $0 $0 $0 Project: Sportsman's Club Road and New Brooklyn Road Location: Intersection Improvements Number: 00715 Description: Capacity (level of service) improvements at intersection. Level of service C from 2004 study. Since that time the Sakai and Woodward schools have changed schedules resulting in impacts to the intersection. A roundabout is proposed. Estimated schedule and costs assume a right-of-way donation by the School District. Benefit: Relieve current and future congestion. Schedule: YRI Design and Permitting. YR2 Construction. FUNDING USES (1000's) 2022 2023-2034 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Design/permitting $180 Construction $820 Sub -total $0 $0 $180 $820 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -total $0 $0 $0 $II $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 FUNDING SOURCES (1000's) General Fund $0 $0 $0 $530 $0 $0 Trans. Impact Fees $0 $0 $25 $290 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $155 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 Sub -total $0 $0 $180 $820 $0 $0 FUNDING USES (1000's) 2022 2023-2034 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Design/permitting $180 Construction $820 Sub -total $0 $0 $180 $820 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -total $0 $0 $0 $II $0 $0 $0 $0 Project: Wardwell Road Reconstruction Project & Drain Improvements Number: 00662 Location: Short of Sportsman's Club to Triple Crown Description: Provides for roadway surfacing reconstruction and storm drainage improvements. The City completed design in 2014 with funds received from a DOE grant for water quality improvements. The City plans to apply for grant funding for the water quality related elements of the project in 2015. The culvert replacement at Woodward Creek listed separately may be combined with this project. Temporary construction easements may be needed. Benefit: Provides for surfacing repairs. Currently the roadway lacks conveyances. The project provides for the construction of the conveyance system for the roadway to reduce ponding and improve water quality. Currently the Woodward Creek culvert overtops during storm events and does not provide for fish passage. The Grant allows the City to comprehensively address road repair and stormwater drainage at a reduced cost. Schedule: Design to be completed in 2014/2015. Construction in 2017. Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $10 $0 $0 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $510 $0 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $245 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $755 $0 $0 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting Construction $755 Sub -total $0 $755 $0 $0 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $10 $0 $0 $0 $0 $0 $0 CITY OF BAINBRIDGE ISLAND NON -MOTORIZED TRANSPORTATION CIP (2017 - 2022) 2017 - 2018 PROPOSED BUDGET Amounts in thousands v oU EE a a a p C 0 d 2023 - Project Location ; 2017 2018 2019 2020 2021 2022 2036 NON -MOTORIZED PROJECTS - 6 -YEAR CIP SR30510I m is Drive NM Harbor Dr. to Winslow Wal x x644 — Y Y 1,301 - - 5R305/01 m is Drive NM Ph 2 Harbor Dr. to Winslow Way x 685 Y 220 720 - Sound to Olympic Trail Ph 2 Winslow W. to High School x x 1,254 Y 1,450 - - Sound to Olympics Trail Ph 3 STO Trail to Ericksen Ave. x x 2,092 Y 640 - 2,500 - :Sound to Olympics Trail Ph 4 Vineyard Ln to High School Rd x x 692 Y 800 - - - 'Wing Point Way Non Motorized Ferncliff to Park x x 1,330 Y Y Y 1,543 - - 'Waterfront Trail Bride Replacement 'Waterfront Park - Y Y Y - - 80 400 - Madison Avenue Sidewalk Im r. 'Wyatt to High School x 1,450 Y - - - 270 1,410 - Hi h School Road Safety Im r. SR305 to Grow - Y - 160 - ConnectinA Pathways Y 25 25 25 25 25 25 C40 - Spot Projects - Y - 50 50 50 50 50 50 C40 - Miller Bay Road Toto to Pederson Hlll x x 751 Y ISO 30 920 - C40 - Bucklin Ph 2 Blakely - Fletcher Bay x Y 47 - - 600 600 C40 - Ea Harbor - Ph I Wyatt - Past Bucklin x - Y Y90 -le - - 400 400 C40 - Fletcher Bay Road New Brooklyn to HS Rd x x 389 Y 20 500 - - - City Project Funding_ 1,242 739 510 731 932 795 1,065 400 Grant Totals 4,049 26 985 2,154 623 230 1,220 - TOTALS . 5,291 765 1,495 2,885 1,555 1,025 2,285 400 Amounts in thousands Project: Sound to Olympics Trail, Phase 3 Location: Connecting Wing Point Way to Wyatt Way Number: 00726 Description: Separated grade crossing to connect Ericksen Avenue near Wyatt to the STO trail near Vineyard. Application submitted for Pedestrian Bicycle Program Grant for design but not approved. Right-of-way Acquisition may be needed depending on location and configuration. Benefit: Non motorized level of service improvement, safety enhancement Schedule: Pursue grants to begin design in 2017. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $640 $0 $408 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $2,092 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $640 $0 $2,500 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting Construction $640 $2,500 Sub -total $0 $640 $0 $2,500 $0 $0 $0 $0 Prior Yrs. 2017 Operating Debt Service Sub -total $0 $0 2018 2019 2020 2021 2022 2023-2034 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $13 $0 $8 $0 $0 $0 $0 Project: Connecting Pathways Number: 00673 Location: Various Locations Description: Annual funding to address trail opportunities such as easements and construction. Potential projects include Bucklin Hill trail near Hyla School, Sportsman's Club Spine Trail (near Sportsman's Club), Sportsman's Club Spine Trail (north of Sakai School), Lost Valley starting at Carmela and on City parcel, Cave connector to STO trail, Woodward School (Sportsman's to Wardwell) and Central Connecting Path Spine Trail (Wardwell to Koura) Benefit: Safety and Non Motorized Transportation Connectivity. Schedule: As opportunities arise Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $25 $25 $25 $25 $25 $25 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $25 $25 $25 $25 $25 $25 $0 FUNDING USES (1000's) Design/permitting Construction $25 $25 $25 $25 $25 $25 Sub -total $0 $25 $25 $25 $25 $25 $25 $0 Prior Yrs. 2017 Operating Debt Service Sub -total $0 $0 )n to Public Art Account 2018 2019 2020 2021 2022 2023-2034 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $1 $1 $1 $1 $1 $1 $0 Project: C40 - Annual Spot Projects Location: Various Locations Number: 00218 Description: Add on to the Annual Roads Preservation Program to fund shoulder repairs and infill missing short segments. Potential projects include Wyatt (Weaver to Finch), Eagle Harbor (blind curve near McDonald), Finch (Wyatt to Sportsman's), and Fletcher Bay (blind curve near Island Center Hall). Benefit: Safety and Non Motorized Transportation Connectivity. Schedule: Constructed annually. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (I 000's) General Fund $0 $50 $50 $50 $50 $50 $50 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $50 $50 $50 $50 $50 $50 $0 FUNDING USES (1000's) Design/permitting Construction $50 $50 $50 $50 $50 $50 Sub -total $0 $50 $50 $50 $50 $50 $50 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $1 $1 $1 $1 $1 $1 $0 Project: C40 Miller Road Number: 00800 Location: Tolo Rd. to Peterson Hill Rd. Y Description: Provide shoulder widening on both sides of Miller Road from Tolo Road to Miller Road. Assumes that no permanent ROW acquisition is needed. Benefit: Safety and Non Motorized Transportation Connectivity. Schedule: Yr1 and Yr2 Design & Permit. Yr3; Construct. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $21 $4 $324 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $129 $26 $596 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $150 $30 $920 $0 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting $150 $30 Construction $920 Sub -total $150 $30 $920 $0 $0 $0 $0 $0 k 4.14:t,ALjr -iroti, . . Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $0 $6 $0 $0 $0 $0 $0 Project: C40 Fletcher Bay Road Location: High School to New Brooklyn Number: 00780 k Description: Provide shoulder widening on both sides of Fletcher Bay Road from Blakely High School Road to New Brooklyn Road. The project is planned to be designed by COBI staff. Assumes that no permanent ROW acquisition is needed. Benefit: Safety and Non Motorized Transportation Connectivity. Schedule: Yrl; Design & Permit. Yr2; Construct. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $20 $1 1 1 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $389 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $20 $500 $0 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting $20 Construction $500 Sub -total $0 $20 $500 $0 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023 Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 Sub -Total $0 $0 $2 $0 $0 $0 $0 $0 2022 2023-2034 $0 $0 City of Bainbridge Island FLEET and EQUIPMENT CIP (2017 - 2022) 2017 - 2018 Proposed Budget FLEET & EQUIPMENT - 6 -YEAR CIP Police Vehicles (3) 180 W E o 180 1891 198 2081 219 230 - SUV 7v 7 E o a Q n o 7 7 37 - - - - - - SUV 9 E E U 7 7 7 37 - - - - w ¢ �j o O U 18 37 - - c c c V 2017, 2017 2018 2019 2020 2021 2022 2023- 2034 FLEET & EQUIPMENT - 6 -YEAR CIP Police Vehicles (3) 180 180 1891 198 2081 219 230 - SUV 9 7 7 7 7 37 - - - - - - SUV 9 7 7 7 7 37 - - - - - Medium Duty Pickup Truck 19 18 37 - - - - - Light Duty Pick Up (2) 50 8 8 8 8 82 - - - - - - Medium Duly Pickup Truck 11 11 11 11 11 55 - - - - - - Small Sander Attachment 13 13 - - - - - Data Storage (SAN) System Replacement 15 15 - - - - - - ISP/Internet Redundant Route 20 20 - - - - - - Tire Changer / Balancer 20 20 - - - - - Emergency Radio Communications 100 100 - - - - - - 158 39 - 197 - - - - - Roadside Mower Medium Duty Pickup Truck (2) 11 46 39 - 96 - - - - - SUV 11 7 7 7 7 - 39 - - - - - Commercial Lawn Mower 15 - 15 - - - - - 80 - - 80 - - - - Broom Sweeper Heavy Duty Trailer 16 - - 16 - - - Chipper 80 - - 80 - - - - Van 44 11 - - 55 - - - - PUP Trailer 29 29 - - 58 Dump Truck Cab/Chassis 116 116 - - 232 - - - Light Duty Pick Up 10 9 9 9 9 - - 46 - - - - SUV 9 16 16 - - 41 - - - - Police Boat 69 - - 69 - - - - 17 68 315 _ _ Heavy Duty FICKUp Van 13 52 - - - 65 - - - _ Medium Duty Pickup Truck 50 13 - - - 63 - - - Light 15-u—ty Pick Up 49 - - - 49 - - 160 - - - - 160 - - Backhoe Medium Duty Pickup Truck 2) 22 86 20 20 20 - - - - 168 - - Police Motorcycles (2) 52 - - - - 52 - - 64 11 11 11 11 - - - - - 108 - Light Duty Pick U 2) Road Grader 665 - - - - - 665 - Fork Lift 10 11 11 11 11 - - - - -54 - Police Boat Trailer 20 - - - - - 20 Data Storage (SAN) System replacement 20 - - - - - 20 - ... 5961 536 875 470 599 1,097 TOTALS .......................................... TFF Amounts in thousands City of Bainbridge Island Facilities CIP (2017- 2022) 2017-2018 Proposed Budget Amounts in thousands CL o rn c U E o a E U W¢ u' y 0 Prior 2023 - Project Location T T 2 °; N � � co Years 2017 2018 2019 2020 2021 2022 2034 FACILITIES PROJECTS - 6 -YEAR CIP I � Waterfront Park Phase 1 Waterfront Park X X 500 1,959 - - - - - IMPT. 1,100 Y 2,067 _ - - - City Dock Impr. Waterfront Park X X - - - - - 8,000 Y 500 Law and Justice Center Police 2,600 8,000 - - - - - Station/Court Y TBD TBD - - - - - Downtown Parking Winslow - - Facility Y - - - - - - - Road End Improvements Island Wide - 150 - Y - Fueling System Public Works 20 70 - - - - Design/Upgrade Facility - Y - - BackupHVAC Unit Server Room 25 - - Eagle Harbor Viewing - - - - Platform TBD TBD hl City Total 3,076 2,645 70 - - - - - Grant Totals 1 1 1,600 - 8,000 - - - - - TOTALS . 4,676 2,645 8,070 - - - - - Amounts in thousands Project: Law and Justice Center Number: 00724 Location: TBD Description: This project provides for a replacement Police Station and relocated Municipal Court Benefit: Replacement Police facility will provide adequate space for current and future departmental needs, while correcting numerous space, structural, and security deficiencies in the current facility. New Court facility will replace existing leased space, which marginally meets current requirements and will allow operational efficiencies by being co -located with the City Hall and Police Station municipal complex. Schedule: Design beginning in 2015; Construction in 2018 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total a • � Prior Yrs Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) $0 $0 $0 $0 $0 $0 General Fund $500 $2,600 $0 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 Long -Term Debt $0 $0 $8,000 $0 $0 $0 $0 $0 Sub -total $500 $2,600 $8,000 $0 $0 $0 $0 $0 FUNDING USES (1000's) Design/Land Acquisition $500 $2,600 $0 $0 $0 $0 $0 $0 Construction $0 $0 $8,000 $0 $0 $0 $0 $0 Sub -total $500 $2,600 $8,000 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total a • � Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $10 $52 $0 $0 $0 $0 $0 $0 M Project: Fueling System Design/Upgrade Number: 00811 Location: Public Works Facility Description: Design and construction of capacity improvements to the fuel system at the Public Works facility. Benefit: Upgrades to system will allow better service to users, including City police. In addition, system is a part of the City emergency management reserve, allowing continuing service in emergency situations. Schedule: Design in 2017 and construction in 2018. Operating Debt Service Sub -total Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -total $0 $0 $1 $0 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $20 $70 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $20 $70 $0 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting $0 $20 $0 $0 $0 $0 $0 $0 Construction $0 $0 $70 $0 $0 $0 $0 $0 Sub -total $0 $20 $70 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -total $0 $0 $1 $0 $0 $0 $0 $0 Project: Backup HVAC Unit Number: 00813 Location: Server Room Description: The City Hall HVAC system upgrade project is based on the recommendation of the city's current HVAC service provider, Air Management Systems Inc. The City Hall is served by 21 individual heat pumps. The heat pumps are currently 13 years old and have an estimated life expectancy of 12 — 15 years. The heat pump that serves the Information Technology room will be replaced in 2017. Benefit: Systems reliability. Schedule: Construct 2017 Operating Debt Service Sub -total Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -total $0 $1 $0 $0 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $25 $0 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $25 $0 $0 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting $0 $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $0 $0 $0 $0 $0 $0 $0 t Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -total $0 $1 $0 $0 $0 $0 $0 $0 CITY OF BAINBRIDGE ISLAND WATER CIP (2017- 2022) 2017-2018 PROPOSED BUDGET Project Location w no - � v "' ; Q 6 E c U E U d E U a E U 3 a V o F Prior Years 2017 2018 2019 2020 2021 2022 2023 - 2034 WATER PROJECTS - 6 -YEAR CIP Water Line Replacement 01 m is Drive High School Reservoir Head of Bay 'Winslow Rockaway High School/New Brookl Various Various Winslow Shephard Way Waterfront Park --# Y Y Y Y Y Y Y Y Y Y Y Y Y Y 100 - - - - - - - - - - - 80 150 80 250 - - - - - - - 500 - 500 - 150 - - - - - - - - - - 950 - 150 75 50 - - - - - - - - - 350 300 - - - - - - - 250 - - - 80 - - - - - - - - - - - - 150 - - - - - 400 - Tank Storage Improvements Emergency Generator Water Treatment Improvement Rockaway Intertie High Zone Improvements Chlorine Generator Upgrades Meter Replacements Fire Flow Improvements Pipeline Improvements Waterfront Trail Bride Cit Pro'ect Fundin 560 1,150 1,225 650 330 550 - Grant Totals L100 - - - -TOTALS . 560 1,150 1 I ,225 1 650 330 550 - Amounts in thousands Project: Tank Storage Improvements Location: High School Reservoir Number: 00817 Description: The purpose of this project is to assess the seismic resiliency of the City's High School reservoirs. The project also includes analysis fo tank mixing, the integrity of tank valves, and the condition of tank interior and exterior coating. In the first year the storage facility analysis will be performed with contsruction of identified improvements in the second year. Benefit: Ensure the long-term reliability of the water system Schedule: Design in 2017 and construction in 2018. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $0 $0 $0 $0 $0 $0 $0 Water Fund $0 $80 $500 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $80 $500 $0 $0 $0 $0 $0 FUNDING USES (I 000's) Design/permitting $80 Construction $500 Sub -total $0 $80 $500 $0 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service _ Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $0 $0 $0 $0 $0 $0 $0 Project: Emergency Generator Location: Head of Bay Number: 00814 Description: Install an emergency generator to provide a permanent, redundant power source for the well site that provides 25% of the supply for the system. Benefit: Improves system reliability in the event of power outages. Schedule: Purchase and install in 2017 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $0 $0 $0 $0 $0 $0 $0 Water Fund $0 $150 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $150 $0 $0 $0 $0 $0 $0 FUNDING USES (I 000's) Design/permitting Construction $150 Sub -total $0 $150 $0 $0 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $0 $0 $0 $0 $0 $0 $0 Project: Water Treatment Improvements Location: Winslow �� .-c •_ r 1 :�� . '-_ate Number: 00816 Description: This project implement water treatment improvements to keep iron, manganese, and sulfide levels from exceeding the maximum contaminant levels (MCLs). Benefit: Improve the water quality for the system. Schedule: Design the first year. Construct the second year. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) Sub -total $0 $0 $0 General Fund $0 $0 $0 $0 $0 $0 $0 $0 Water Fund $0 $80 $500 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $80 $500 $0 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting $80 Construction $500 Sub -total $0 $80 $500 $0 $0 $0 $0 $0 1M��lo��BfRlCiEi+ d�1 SAArzmra 93M"ra CIfiC 2019 2020 2021 2022 2023-2034 $0 $0 2019 2020 $0 $0 $0 $0 $0 2021 2022 2023-2034 $0 $0 $0 Prior Yrs. 2017 2018 Operating Debt Service Sub -total $0 $0 $0 Prior Yrs 2017 2018 Sub -Total $0 $0 $0 2019 2020 2021 2022 2023-2034 $0 $0 2019 2020 $0 $0 $0 $0 $0 2021 2022 2023-2034 $0 $0 $0 Project: Rockaway Intertie Location: Rockaway Number: 00815 Description: The Rockaway Beach Water System requires additional supply and storage to meet the City's criteria. The existing single supply well has limited and declining capacity, and the storage tank is undersized. This project will complete an intertie with the adjacent KPUD water system. Benefit: Improve the relaibility and fire protection for the Rockaway Water System. Schedule: Design and construct in the same year. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $0 $0 $0 $0 $0 $0 $0 Water Fund $0 $250 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $250 $0 $0 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting Construction $250 Sub -total $0 $250 $0 $0 $0 $0 $0 $0 Prior Yrs. 2017 Operating Debt Service Sub -total $0 $0 $0 Prior Yrs 2017 2018 Sub -Total $0 $0 $0 2018 2019 2020 2021 2022 2023-2034 $0 $0 $0 2019 2020 2021 $0 $0 $0 $0 $0 2022 2023-2034 $0 $0 Project: High Zone Improvements Location: High School/New Brooklyn Number: 00819 Description: Some high elevation customers within the Winslow Water System do not have adequate pressure or fire flow to meet the City's criteria. These deficiencies could be resolved by creating a new pressure zone above the High Zone at an approximate HGL of 405 feet. This project will complete a study and plan for improvements in the first year with constrcution scheduled in the second year. The study would determine the extent of the new pressure zone and the required system modifications. Benefit: Improve water system quality and fire protection. Schedule: Design the first year. Construct the second year. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $0 $0 $0 $0 $0 $0 $0 Water Fund $0 $0 $150 $950 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $0 $150 $950 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting $150 Construction $950 Sub -total $0 $0 $150 $950 $0 $0 $0 $0 Prior Yrs. 2017 Operating Debt Service Sub -total $0 $0 2018 2019 2020 2021 2022 2023-2034 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $0 $0 $0 $0 $0 $0 $0 CITY OF BAINBRIDGE ISLAND SEWER CIP (2017 - 2022) 2017-2018 PROPOSED BUDGET Amounts in thousands Project: Rehabilitate Pump Station Location: Village Number: 00782 Description: The Village Pump Station is expected to require capacity upgrades by 2025. To meet 2035 projected flows, the Village Pump Station needs to be upgraded to a firm capacity of approximately 850 gpm. Additionally, the Village Pump Station has not been upgraded since its installation in 1979. Due to age, the station's valves, controls, and telemetry need to be replaced. The drywell and wet well are showing signs of advanced corrosion. This station will require a comprehensive rehabilitation similar to the City's 2006 Highway 305 Pump Station upgrade project. Benefit: System capacity and reliability Schedule: Design in first year and construct in second year Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $0 $0 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $200 $700 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $200 $700 $0 $0 $0 $0 $0 FUNDING USES (I 000's) Design/permitting $200 Construction $700 Sub -total $0 $200 $700 $0 $0 $0 $0 $0 Prior Yrs. 2017 Operating Debt Service Sub -total $0 $0 2018 2019 2020 2021 2022 2023-2034 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $0 $0 $0 $0 $0 $0 $0 Project: Rehabilitate Pump Station Location: Wing Point Number: 00820 Description: The Wing Point Pump Station has not been upgraded since its construction in 1979 and is reaching the end of its useful life. Besides the general condition concerns that also apply to the City's other aging pump stations (Wet well controls should be replaced to meet current safety standards and the performance of the cathodic protection components of these stations should be assessed), the Wing Point Pump Station has some unique upgrade requirements. Firstly, the station access hatch is currently under water during extreme high tides and should be extended. Secondly, it is recommended that an air -vacuum relief valve be installed in the force main at the discharge of the Wing Point pumps. Benefit: Improves reliability of current sewer collection system. Schedule: Design the first year. Construct the second year. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $0 $0 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $100 $450 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $0 $100 $450 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting $100 Construction $450 Sub -total $$0 $0 $100 $450 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $0 $0 $0 $0 $0 $0 $0 Project: Replace Beach Sewer Force Main Number: 00721 Location: Lower Lovell Description: The current Lower Lovell sewer beach main in severely deteriorated as documented during mainteance operations completed in 2015 and 2016. It is unfeasible to repair or replace the line in its current location, so this project will design and construct a new collection system for the basin in the upland area. Benefit: Replaced a deterorated system with a relaible sewer collection system that can be maintained in the futu re. Schedule: Design the first year. Construct the second year. Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (I 000's) General Fund $0 $0 $0 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $200 $950 $0 $0 $0 $0 $0 SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $200 $950 $0 $0 $0 $0 $0 FUNDING USES (I 000's) Design/permitting $200 Construction $950 Sub -total $0 $200 $950 $0 $0 $0 $0 $0 prl Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $0 $0 $0 $0 $0 $0 $0 CITY OF BAINBRIDGE ISLAND STORM wATER CIP (2017 - 2022) 2017 - 2018 PROPOSED B UDGET Amounts in thousands w a 7 E a E E V ai 2023- Project 3 2017 2018 2019 2020 2021 2022 2036 STORMWATER PROJECTS - 6 -YEAR CIP Rockaway Beach Rd. Outfall Replacement - - - - - 450 Y Y Y Y Y 255 - -EMI 74 - - - - 200 - 245 - - - - - - 900 - - - - - - 150 600 - - - - - - - - - - - - - - Ravine Creek Outfall Replacement Hrbr. Dr, @ McDonald Creek Culvert Wardwell Rd Culvert(Woodward Creek Blakely Falls Creek Culvert {Halls Hill Springbrook Creek Restoration and Culvert Replace x - - Y Y Y Y 60 - - - - - - 100 - - 510 - - - 450 - Yeomalt Area Drains a Improvements C40 Eagle Harbor Phase I CityFunding 389 615 - 1,000 300 510 450 - Crant Totals - - - - 450 - - - TDTALS . 389 615 - 1,000 750 Amounts in thousands Project: Ravine Creek Outfall Replacement Location: Ravine Creek Number: 00776 Descri tp_iofl: The existing stormwater outfall at Ravine Creek is currently undersized and does not extend to the high water mark of the creek. The outfall needs to be replaced in order to accommodate the projected flows from the basin. Benefit: Expand the capacity of the current stormwater system and meet DOE criteria for direct -discharge outfall to tidal waters. Schedule: Construct in 2017. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $0 $0 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $170 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $170 $0 $0 $0 $0 $0 $0 FUNDING USES (I 000's) Design/permitting Construction $170 Sub -total $0 $170 $0 $0 $0 $0 $0 $0 Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 Operating Debt Service Sub -total $0 $0 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $0 $0 $0 $0 $0 $0 $0 Project: Eagle Harbor Drive at McDonald Creek Location: 5530 Eagle Harbor Drive Number: 00823 i w Description: The existing concrete culvert is perched at its outlet and a section of pipe has dropped. Shoulder settlement is an indicator there may be separations. The project provides for the repair of existing concrete culvert assuming trenchless methods can be employed to line culvert. Benefit: Preservation. Avoid much more costly replacement. Mitigate failure risk. Schedule: Preliminary budget and schedule information pending Island -wide Deep Culvert Assessment. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $0 $0 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $0 $200 $0 $900 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $0 $200 $0 $900 $0 $0 $0 $0 FUNDING USES (1000's) Design/permitting $200 Construction $900 Sub -total $0 $200 $0 $900 $0 $0 $0 $0 Prior Yrs. 2017 Operating Debt Service Sub -total $0 $0 2018 2019 2020 2021 2022 2023-2034 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $0 $0 $0 $0 $0 $0 $0 Project: Wardwell Road Culvert Location: Woodward Creek Fish Passage Culvert Number: 00662 Description: Woodward Creek overtops Wardwell Road during storm events and backs up, flooding private property. Recommend replacement of a failing culvert with a new fish passage culvert. This project may be combined with the Wardwell Road Reconstruction and Drainage Project. Temporary construction easements may be needed. Benefit: Replaces an undersized culvert and addresses fish passage. The project furthers the water quality and habitat goals of the Murden Cove Watershed Nutrient and Bacteria Reduction Project. Schedule: Y I Design and Permitting, Y2 Construction. Prior Yrs. 2017 2018 2019 2020 2021 2022 2023-2034 FUNDING SOURCES (1000's) General Fund $0 $0 $0 $0 $0 $0 $0 $0 Water Fund $0 $0 $0 $0 $0 $0 $0 $0 Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 SSWM Fund $74 $245 $0 $0 $0 $0 $0 $0 Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 State Grant $0 $0 $0 $0 $0 $0 $0 $0 Sub -total $74 $245 $0 $0 $0 $0 $0 $0 FUNDING USES (I 000's) Design/permitting Construction $245 Sub -total $0 $245 $0 $0 $0 $0 $0 $0 Prior Yrs. 2017 Operating Debt Service Sub -total $0 $0 2018 2019 2020 2021 2022 2023-2034 $0 $0 $0 $0 $0 $0 Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Sub -Total $0 $0 $0 $0 $0 $0 $0 $0