Loading...
DETRICK, TED & JAYNI CITY OF BAIN2~E ISLAND .Am c. I2:06 ~~LICATION FOR SHO~L~ ) ~~1 !7~ CO~~ION~ USE PE~~T ) ~~S OF FACT~ ~LIC~~: ~D ~ JA~ ) CON~USIONS OF LAW ) VEC SION ) FINDINGS OF FACT 1. Ted and Jayni Derrick reside at 9341 NE South Beach Drive on Bainbridge Island. The l)aricks are the legal owners of a sLq~e-family residence built at that address and legally cle~zn~xl as: Tax Lot IiSI 68-000-002-0005. Lot 2, Rich PasaJge Olympic Mountain View according to the plat recorded in Volume 26 of Plats, pages 128 through 131 inclusive, Kitsap County, W~ington, being a portion of Section 10, Township 24 North, Rtmge 2 Ex~st, 2. The Detrick property is in a r, eighborho~ of single-family homes located along the Puget Scmnd shoreline. The property has been designated as a Semi-Rural Shoreline Environment under tl~ Bainbfi~e Island Shoreline Master Program (SMP). This shoreline environment acx, ommodates low to medium density residential development, low to medium density r~eational development, passive rec~on'~ .open space. The property has a zoning de~i~tion orR-2 which allows two units per acre density. The Comprehensive Plan designation of the property is OSR-2. 3. A Mitigated Determination of Non-Significance (MDNS) was issued on this project on August 13, 2002. The MDNS has not been appealed. 4. This residential lot measures approximately 11,880 sq.ff. The site has been developed w~ a single-family residence and a garage with guest quarters. The parcel is a low bank w~terfront site which has flat topography with a slight grade toward the shoreline. The lot has no slmre~e armoring, however, adjoining Lots 1 and 3 have rock bulkheads. The applicants wish to install a swimming pool and spa in their yard on the north side of their house. The pool and spa will be located within 200 feet of the shoreline Ordinary High Water Mark (OHWM). The proposed site is east of the Native Vegetation Zone (NVZ) on the lot. 5. Public utilities are provided to the Detrick residence by South Bainbridge Water Company SCUP 11799 Hearing Examiner T~ & Jaym Derrick Page - 1- City of Bainbridge Ialand a~ Sewer District No. 7. A storm drainage system is installed on the site. Public services are provided by the Bainbridse Island Police Department, the Bainbridge Island Fire Department and th~ B~jnbridge Island School District. 6. The Detrick residence is located in a plat which has been developed with single-family retid~ces. Lot 3 located adjacent to the Detrick property on its northwest side is undeveloped. The owners of Lot 3 are Kevin and Katherine Pearson who have given the Detricks access across Lot 3 for construction, equipment and materials needed to install the swimming pool and spa. Wrought iron fencing encloses the pool site. Entry gates are on the north and south sides of the garage and in the western portion of the fence which parallels the shoreline. Access to the pool ar~a is controlled through these three gates and the home. 7. The Detricks are members of the Rich Passage Estates Homeowners' Association. They stlnnitted their application for a swimming pool and spa to the Homeowners' Association for at.royal. That approval was receiv~ by letter dated October 15, 2002 from Deborah L. Myers, Pr, sident of the Homeowners' Association. 8. The Detrick lot measures 82.5 feet in width. BIMC 16.12.260 (BXS) requires residential' si~,yards within 200 feet of the OHWM which measure at least 30% of the lot width. These sidey~ must remain flee of above ground structures and impervious surfaces, except that fences up to 4-feet b. igh are allowed. The pool proposed by Mr. and Mrs. Detrick will measure 14-feet 3-inches in width by 32-feet 10-inches in length. The spa will be 8-feet in diameter. The pool and spa will be built outside the required shoreline sideyard area. No additional impervious surfaces ~ be added to the yard around the pool and spa. The area now covered with grass between the house and the northern fence line will remain landscaped except for the portion of the lot occupied by the new pool and spa. At the public hearing, the Detricks amended 'their site plan proposal to eliminate impervious ground covering material between the pool and the home, as shown on the site plan submitted to the City on June 26, 2002. Mrs. Detrick testified that the area is to remain planted in grass. Equipment to operate the pool will be installed above ground in front of the garage. The equipment will be placed under the deck on the west end of the garage. The equipment may be screened from view by vegetation or other fence screening, however, no building will be constructed to enclose the pool equipment. 9. Tom Sutich from Aquaquip, the pool and spa installation contractor, described the pool water circulation system as a closed loop system which will not require backflushing or draining. The pool is designed to continuously recycle the water once the pool has been filled. No pool water will be discharged from the system into the sewage system or into surrounding soils or the waters of Puget Sound. No pool water pipes will be installed above ground. 10. The swimming pool will be built as an in-ground pool and will not be visible from the public right-of-way or from residences on neighboring properties. The swimming pool and spa will be screene~ from view from the waters of Puget Sound by vegetation planted along the SCUP 11799 Hearing Examiner Tod & Jaym Derrick Page -2- City of Bainbridge I~md · , wz~t~ fence line. An in-ground swimming pool at this location ,will have little or no visual iralmct on the natural shoreline las,~~¢ to th~ west of the Detrick's residence. The placcm~at of thc pool in the yard next to the residence minimizes visual impacts to the natural shoreline. The in-ground pool design with a closed loop water circulation system minimizes the risk of adverse environmental impacts from chlorinated water drainage. 11. Installation of the pool and spa will not require clearing or grading within the NVZ. Equipment access to the site will not disturb the NVZ during or at, er construction. All vegetation wi*~ the NVZ will be retained. Disturbed areas landward of the NVZ will be replanted. The . placement of a swimming pool and spa outside the shoreline sideyard and outside the NVZ on this lot will avoid interference with natural shoreline processes such as water circulation, sand and gr~vel movement, erosion and accretion. This lot borders the waters of Puget Sound. The swimming pool and spa will be placed the required buffer distance from Puget Sound. The NVZ will be protected by silt fencing, during construction. 12. On Thursday, October 15~ 2002, a Public Hearing was held before the Hearing Examiner to consider the' application. Prior to the hearing, notice was published in the Bainbridge Review on September 25, 2002, notice of the public heating was mailed to the owners of property within 300 feet of the proposed project on September 18, and notices were posted at the City Hall, the Chamber of Commerce, and the Ferry Terminal on September 18, 2002 notice was posted at the subject property on September 25, 2002. [EXHIBIT 16] CONCLUSIONS OF LAw 1. This application for Shoreline Conditional Use Permit is properly before the Hearing E~m~er. BIMC 16.12.380 (cx4) requires that all Shoreline Conditional Use Permits be decided by the Heating Examiner following the procedures in BIMC 2.16.100. Adequate legal notice was giVen of the public hearing held on this application on October 15, 2002. The MDNS was not al~peale~ and is now final. 2. This application requests approval to install an in-ground swim_ming pool and spa on a single-family residential,lot in the R-2 zone. BIMC 18.30.020 permits accessory uses and b~dings in the R-2 Zone. The Shoreline Master Program (SMP) allows accessory structures and uses on single-family residential lots and does not prohibit a swimming pool or spa as an accessory structure. 3. BIMC 16.12.260 (BX$) requires that on lots within 200 feet of the OHWM at least 30°/3 of the lot width must remain free of above ground structures and impervious surfaces except that feaces up to 4-feet in height are allowed. This application proposes to build an in-ground swimming pool and spa in a location next to the single-family residence which will. not encroach upon the required shoreline sideyard. A condition will be attached to the approval of the scuP11799 Hearing Examiner Ted & Jayni Derrick Page -3- City of Bainbridge I~land swimming pool and spa inst~ation prohibiting construction within the shoreline sideyard. 4. No additional buildings will be added to this property as a part of this swimming pool and sp~ installation project. The pool equipment will be installed under decking on the west side of the existing family garage. No lot coverage calculation was made for this project because no additional buildings were being added to the lot area. The maximum lot area coverage allowed in the R-2 zone is 20%. The application submitted by the Detricks notes that current lot coverage is below the maximum allowed. 5. This lot is located within a Semi-Rural Shoreline Environment. BIMC 16.12.260 requires thst a 50-foot NVZ be maintained adjacent to the shoreline on the property. The NVZ is m~ur~ horizontally upland from and perpendicular to the OHWM on a property. The application proposes to construct this in-ground swimming pool and spa outside the designated NVZ on the property. The site plan as submitted does not indicate the location of the OHWM on the shoreline. As a condition of the SEPA MDNS approval, the property owner is required to submit drawings from a licensed, surveyor which indicate the boundaries of the NVZ, This survey is required to ensure that the NVZ designated on this property will not be disturbed during construction for this swimming pool project. Protective fencing will be required during coastmction activities. 6. This project will not require additional shoreline protection measures or bulkheading. 7. The design and location of this in-ground swimming pool and spa will protect existing views from adjacent properties since it is an in-ground structure which will be screened by enhanced vegetation screening along the north and west f~nce line. The design of the pool as a closed loop water circulation system will minimize the risk of adverse impacts on the shoreline environment. Pool water spillovcr will be channeled into the storm water drainage system which wffi be designed to comply with BIMC 15.20. BIMC 16.12.070 (C)(9) requires that the location, design, construction and management of shoreline uses and activities shall avoid hazards to public health and safety. The installation of an in-ground swimming pool and spa in this densely developed neighborhood poses a potential danger to young children in the neighborhood if access to the pool is not controlled by the owner. The Dctricks have installed wrought iron fencing which will comrol access to the~pool area. This fencing has three entry gates; one on each side of th~ garage and a third which provides access from the shoreline. A portion of this fencing will be removed during construction of the swimming pool, but will be immediately replaced after placement of the swimming pool on the site. A condition will be attached to the approval of this shoreline permit requiting that all gates be equipped with locks requiting keyed entry tO protect asainst access by unimended users. Temporary fencing will be required during construction which will control access to the property until permanent fencing is reinstalled. scuP11799 Hearing Examiner Ted & Jayni Derrick Page -4- City of Bainbridge I~land 8. A Shoreline Conditional Use Permit may be granted for this swimming pool and spa project only after the applicants have demonstrated compliance with the requirements listed in BIMC 16.12.380 (C)(1). 9. BIMC 16.12.380 (C)(1) states: Uses classified as conditional uses may be authorize& provided, that the applicant can demonstrate all of the following: a. The proposed use will be consistent with the policies of RCW 90.58. 020 or its successor and the policies of the master program. The StaffReport prepared by the Departmem of Planning and Community Developmem (DPCD) discusses the policies of the Bainbridge Island SIMP which are relevant to this project. A review of the application and hearing exhibits demonstrates that this project will be consistem with the policies of the Washington State Shoreline Managemem Act as well as the Bainbridge Island SMP if appropriate conditions are attached to the permit approval. The swimming pool and spa are sited outside the NVZ and outside the shoreline sideyards on this shoreline lot. The natural shoreline will not be impacted by the construction of this project or by the operation or use of this in-ground swimming pool and spa. Any pool water spillage will be channeled through the stormwater drainage system. A stormwater drainage plan which complies with the requirements ofBIMC 15.20 and the Stormwater Managemem Manual for the Puget Sound B~in is required by BIMC 16.12.130 (C)(4). The drainage plan will be submitted along with the building permit application 10. BIMC 16.12.380 (C)(1) states' Uses classified as conditional uses may be authorized; provided, that the applicant can demonstrate all of the following: b. The proposed use will not interfere with the normal public use of the public shoreline. This application is for a permit to build a swimming pool and spa on a private residential lot. The swimming pool and spa will be built landward of the NVZ on the property and outside the shoreline sideyard. The location of a swimming pool will not effect the public's access to the public shoreline. The in-ground design will have a minimal visual impact on the shoreline when viewed from Puget 'Sound. Required vegetation screening along the western fence line will screen the pool from view by users of the public shorelines and the waters of Puget Sound. 11. B IMC 16.12.380 (C)(1) states: Uses classified as conditional uses may be authorize& provided, that the applicant can demonstrate aH of the following: ... (c) The proposed use of the site and design of the project will be compatible with other permitted uses within the area. This swimmin$ pool is proposed as an accessory structure and accessory use to a single- fanfily residence. The Detricks are members of the Rich Passage Homeowners' Association and they have submitted their swimming pool and spa application to the Homeowners' Association for approval. That approval was granted by the Homeowners' Association. The development of this SC:UP 11799 Hearing Examiner Tod & Jayni Detrick Page -5- City of Bainbridge Island single-f~ly lot with a recreational private swimming pool is consistent with the uses allowed in the R-2 zone. Many of the lots in this plat have been developed with large single-family residences. The swimming pool is designed as an in-ground pool which will not diminish the views currently available from adjacent lots. Security fencing will restrict access to the pool area, helping to ensure public health and safety by preventing use by uninvited guests. The equipment used to operate the pool will produce a minimum amoum of noise and should not disturb adjacent property users. Pool lighting will be screened from adjacent property by vegetation planted along the north and west fence lines. 12. BIMC 16.12.380 (C)(1) states: Uses classified as conditional uses may be authorize& provided, that the applicant can demonstrate all of the following: ... (d) The proposed use will cause no unreasonably adverse effects to the shoreline environment designation in which it is located The Detrick property has been designated as a Semi-Rural Shoreline Environment. The Semi-Rural Shoreline Environment accommodates low to medium density residential developmem, low to medium intensity recreational development, passive recreation and open space. The swimming pool project proposed by the property owner is an appropriate accessory use to their single family residential use. The swimming pool will be located east of the NVZ set aside on the property. In addition, it will be built outside the designated shoreline Sideyard. The pool will operate with a closed loop water circulation system. Once the pool is rifled, the water will recirculate continuously through the pool. The pool water will not be discharged into the stormwater or sewage systems, except for incidental spillage which will be channeled into the stormwater system. A stormwater drainage plan will be submitted by the property owner detailing additions to the existing systems which will accommodate incidental spillover and increased stormwater mn-off related to the pool installation. There should be no adverse impacts to the natural shoreline environment on this lot. The minimal visual impact from the pool will be screened by vegetation planted along the north and west fence lines, by the garage and by the residence. Noise generated by the pool operating equipment will be minimal and should not disturb adjacem property owners. Light from underwater pool lighting will be screened by the enhanced vegetation screening along the fence line. The excavation for the pool will require removal of most of the sod in the yard to the north of the house. After installation of the pool and spa, this grassy area will be replanted around the newly installed features. The proposed use of this portion of the property for a recreational swimming pool and spa will cause no unreasonably adverse effects to the Semi-Rural Shoreline Environment in which it is located. 13. BIMC 16.12.380 (C)(1) states' Uses classified as conditional uses may be authorized; provided, that the applicant can 'demonstrate all of the following: ... (e) The public interest suffers no detrimental effect. The installation of a private swimming for single-family use will have no substantial SCLIP 11799 Heating Examiner Ted & Jayni Detrick Page -6- City of Bainbridge Island · , d~memal effect on the public interest. The P°ol will be locat~ within a locked fenced area to limit access. Perimeter plantings will screen the yard from view from adjacent properties and - from the Puget Sound. shoreline. The Homeowners' Association for the Rich Passage Olympic Moumain View Plat has approved the installation of the swimming pool, finding it compatible with other neighborhood uses. The installation of a .private swimming pool on this lot will not effect the public access to the public shoreline. The swimming pool will not be visible from the public fight-of-way. The public interest will suffer no substantial detrimental effect by the approval of this application for a Conditional Use Permit to install a private swimming pool and spa on the Detrick property. 14. BIMC 16.12.380 (cx1) states: Uses classified as conditional uses may be authorize& proVided, that the applicant can demonstrate all of the following: · ..~ The proposed use is consistent with the provisions of the zoning ordinance and the comprehensive plan. The Detrick property has a zoning designation of R-2 allowing two units per acre of density, and a Comprehensive Plan designation of OSR-2 (Open Space Residential). Single- family residemial use is a permitted use in the R-2 zone and accessory uses which support that single-family use are also permitted under BIMC 18.30. This application complies with the requirements of the SIMP for building within the shoreline jurisdiction. The goals and policies of the Comprehensive Plan are supported by the development of this lot for single-family use. The OSR-2 designation recognizes the development pattern in this neighborhood which has been platted for single-family residential use. The Comprehensive Plan goals and Policies which promote environmental protection are supported by this application, since the swimming pool site selection locates the pool outside environmentally sensitive areas on the lot. 15. This application for installation of a private swimming pool and spa can meet the requirements for a Shoreline Conditional Use Permit provided certain conditions are attached to that approval to ensure its compliance with the SIMP. Those required conditions are as follows: S~A Conditions- 1. Prior to any-clearing, grading or building activities, a Temporary Erosion and Sedimentation Control Plan shall be reviewed and approved by the City Engineer. 2. An engineered storm water drainage plan may be required dependent upon the amount of impervious surfaces created with the construction of the swimming pool and decking. At building permit submittal, the applicant SCIJP 11799 Hearing Examiner Ted & Jayni Det~ck Page -7- City of Bainbridge Island shall submit a site plan showing the amount of existing impervious surfaces and proposed impervious surfaces on the site. The storm water drainage plan will require approval by the City Engineer prior to building permit issuance. 3. A special erosion control plan shall be submitted and approved by the City Engineer prior to any clearing and grading proposed outside of the dry season, April I to October 1. The plan shah specifically identify methods of · erosnon control for wet weather conditions. 4. At building permit submittal, the applicant shall provide drawings from a licensed surveyor to ensure that the swimming pool location is not within the fifty-foot Native Vegetation Zone (NVZ). Native Vegetation Zone means a required vegetation buffer measured horizontally upland from and perpendicular to the ordinary high water mark (OHWM). BEVIC 16.12.030.117. Once the NVZ has been established by survey, silt fencing shall be installed to protect the NVZ from disturbance during construction. Prior to building permit issuance, a site visit shah occur to ensure proper placement of the required silt fencing. 5. Complete storm water drainage plans designed in accordance with the Washington State Department of Ecology Technical Manual shall be submitted and approved by the City Engineer prior.to building permit issuance. 6. The swimming pool plumbing shah be configured so that the swimming pool water shall not be transported into the Puget Sound. In addition, if the pool requires draining, water levels reduced, chlorinated water from the swimming pool shall not enter the Puget Sound by siphoning, overflow, or other means. 7. Permittee is required to stop work and immediately notify the Department of Planning and Community Development and the Washington State Or, ce of Archaeology and Historic Preservation if any historical or archaeological artifacts are uncovered during excavation or construction. 8. Extreme care shall be taken to prevent any petroleum products, chemicals, or other toxic or deleterious materials from entering the water. If a spill does occur, or if an oil sheen or distressed or dying fish are observed in the project vicinity, work shah cease immediately and the Department of Ecology (DOE) shall be notified of such conditions. Contact DOE's Northwest Regional Spill Response Section at (206) 649-7000. SCLIP 11799 Hearing Examiner Ted & Jayni Derrick Page -8- City of Bainbridge Island 9. Any disturbance of vegetation within the 50-foot NVZ will require replanting consistent with the Shoreline Master Program Native Vegetation Zone requirements. After any disturbance to the vegetation in this area, a replanting plan shall be submitted by the applicant 'for approval by the Director before replanting. 10. AH construction debris shall be disposed of at an approved upland site. 11. A City of Bainbridge Island building permit is required prior to construction. 12. Construction noise shall be controlled by the following measures; confining construction activities to the hours between 7:00 am and 6:00 p.m., Monday through Friday, 9:00 a.m. and ~:00 p.m. on Saturday, no work on Sunday. BI?dC 16.16 Non-SEPA Conditions: 13. The building permit shall substantiah~y conform to the site plan stamped June 26, 2002 and the survey required by Condition 4. The survey shall accurately measure the boundaries of the NVZ and shoreline sideyards on the Derrick lot. 14. To minimize erosion, the area around the pool shall be replanted and restored to existing conditions as soon as construction is completed. 15. Permanent fencing shall be installed around the pool area to limit access. A locking mechanism shall be install~ on all access gates to the pool area and shall be kept locked at aH times to limit access to the pool area. The fencing shall be a minimum of 4-feet in height and shall not include any decorative design work which renders the fencing easily climbable. The fencing shah be designed to prevent access by young children without adult supervision. 16. The approval of this site plan is limited to approval of the installation of an in ground swimming pool which measures 14 feet 3 inches by 32 feet 10 inches, the installation of pool operation equipment on the property and the installation of an in ground spa which measures 8-feet in diameter. No additional buildings are authorized by this SCUP. 17. No additional impervious surfaces will be added to this lot, other than the swimming pool and spa. The area surrounding the swimming pool and spa SCUP 11799 Hearing Examiner Ted & Jayni Detrick Page -9- City of Bainbridge Island shall be replanted with grass and other shrubbery after installation is complete. 18. To minimize visual impacts from the pool and spa, enhanced vegetation screening shall be planted along the north and west fence line to provide visual screening for adjacent properties and from the Puget Sound shoreline. Prior to planting, a vegetation plan shall be submitted to DPCD for approval prior to building permit issuance. The vegetation screening must be sufficiently dense to screen the pool from view from adjacent properties both during the daylight hours and in the evening hours when underwater pool lighting may be utilized. Enhanced vegetation planted along the~ fence lines shall be selected to be compatible with the Semi-Rural Shoreline Environment in which this home is located. DECISION This application for a Shoreline Conditional Use Permit for the installation of an in-ground swimming pool and spa on property located at 9341 NE South Beach Drive in the City of Bainbridge Island is granted subject to the conditions of approval listed in Conclusion of Law 15 above. Dated this 30~ day of October, 2002 Robin Thomas Baker Hearing Examiner Pro Tem APPEAL This decision is final unless the Hearing Examiner's decision is appealed to 'the City Council in acoordance with BIMC 2.16.140. After a final decision is made by the City, the decision shall be forwarded to the Washington State Department of Ecology for decision. SCUP 11799 Heating Exan~er Ted & Jayni Detrick Page - 10- City of Bainbridge Island