ORD NO. 2017-28 ADOPTING THE 2017-2022 CAPITAL FACILITIES PLANCity of Bainbridge Island
Total CIP (2017 - 2022)
2018 Budget Modifications
Pr
i
o
r
Y
e
a
r
s
2017 2018 2019 2020 2021 2022
2023 -
2036 Total
Transportation Projects
1,600 545 2,280 25 300 1,370 500 - 6,620
Transportation Grants 1,158 - 1,584 - - - - - 2,742
Non Motorized Projects 4,403 1,005 2,767 2,885 1,555 1,025 2,285 400 16,325
Non Motorized Grants 3,228 - 2,257 2,162 623 230 1,220 - 9,720
Fleet and Equipment - 300 613 859 470 599 1,097 - 3,938
General Govt Funded - 300 441 600 342 539 1,031 - 3,253
Utility Funded - - 173 259 128 60 66 - 686
Facility Projects 2,717 2,945 70 - - - - - 5,732
Facility Grants 1,100 - - - - - - - 1,100
Water Projects 100 935 2,025 275 650 330 550 - 4,865
Water Grants - - - - - - - - -
Sewer Projects 700 635 1,750 700 450 180 800 - 5,215
Sewer Grants - - - - - - - - -
SSWM Projects
389 651 - 1,000 750 510 450 - 3,750
SSWM Grants 70 - - - 450 - - - 520
-
Utility Funding 1,119 2,221 3,948 2,234 1,528 1,080 1,866 - 13,996
General Govt Funding 3,234 4,795 1,717 1,348 1,574 2,704 2,596 400 18,368
Total Project Cost Less Grants 7,582 7,016 7,921 5,744 3,725 4,014 5,682 400 42,084
Grant Totals 2,327 - 1,584 - 450 - - - 4,361
TOTAL PROJECT COST . . . . . . . 9,909 7,016 9,505 5,744 4,175 4,014 5,682 400 46,445
Amounts in thousands
City of Bainbridge Island
Transportation CIP (2017 - 2022)
2018 Budget Modifications
Project / Location Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Gr
a
n
t
F
u
n
d
s
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
o
n
e
n
t
Wt
r
C
o
m
p
o
n
e
n
t
Sw
r
C
o
m
p
o
n
e
n
t
SS
W
M
C
o
m
p
Pr
i
o
r
Y
e
a
r
s
2017 2018 2019 2020 2021 2022
2023 -
2036 Total
Wyatt Way
Reconstruction Phase 1 X X
2,516
Y
1,600 - 2,100 - - - - - 3,700
Madison - Lovell
Sportsman Club/New
Brooklyn
X 156 Y - - 180 - - 820 - - 1,000
Intersection Imprv.
Wardwell Rd
Reconstruction &
Drainage Improvements
-
Y Y
- 545 - - - - - - 545
Wardwell Rd
Country Club Rd
Reconstruction &
Drainage Improvements
-
Y
- - - 25 250 - - - 275
Past Toe Jam to
Seawall
Manitou Beach Rd
Stabilization
-
Y
- - - - 50 500 - - 550
Murden Cove to Falk
Manitou Beach Rd
Stabilization
-
Y
- - - - - 50 500 - 550
Falk to Skiff
City Funding 442 545 696 25 300 1,370 500 - 3,878
Grant Totals 1,158 - 1,584 - - - - - 2,742
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,600 545 2,280 25 300 1,370 500 - 6,620
TRANSPORTATION PROJECTS - 6-
Amounts in thousands
Project: Wyatt Way Reconstruction Phase 1 Number:00708
Location: Madison to Lovell
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
FUNDING SOURCES (1000's)
General Fund $512 $0 $672 $0 $0 $0 $0 $0 $1,184
Water Fund $0 $150 $0 $0 $0 $0 $0 $0 $150
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $1,088 $0 $1,428 $0 $0 $0 $0 $0 $2,516
Sub-total $1,600 $150 $2,100 $0 $0 $0 $0 $0 $3,850
FUNDING USES (1000's)
Design/permitting $1,600 $150
Construction $2,100
Sub-total $1,600 $150 $2,100 $0 $0 $0 $0 $0 $3,850
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022
2023-
2034 Total
Sub-total $10 $0 $13 $0 $0 $0 $0 $0 $24
Description: Capacity (level of service) improvements to the intersection of Madison Avenue and Wyatt Way, including
a roundabout. Complete sidewalk and bicycle facilities on both sides of Wyatt from Madison to Lovell. Reconstruct
roadway surfacing and drainage. Additional right of way needed along frontage. Design 50% completed in 2006. State
(TIB) grant funding received in 2015.
Benefit: Relieve current and future intersection congestion and ensure mobility by implementing improvements prior to
development. Address a gap in non-motorized facilities to improve mobility and safety. Support businesses and
employment in the downtown area.
Schedule: YR1/2: design, ROW, and permitting. YR3: construction.
Project: Sportsman Club Road and New Brooklyn Road Number:00715
Location: Intersection Improvements
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $530 $0 $0 $530
Trans. Impact Fees $0 $0 $24 $0 $0 $290 $0 $0 $314
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $156 $0 $0 $0 $0 $0 $156
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $0 $180 $0 $0 $820 $0 $0 $1,000
FUNDING USES (1000's)
Design/permitting $180 $180
Construction $0 $820 $820
Sub-total $0 $0 $180 $0 $0 $820 $0 $0 $1,000
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022
2023-
2034 Total
Sub-total $0 $0 $0 $0 $0 $11 $0 $0 $11
Description: Capacity (level of service) improvements at intersection of Sportsman Club Road and New Brooklyn Road.
Level of service C from 2004 study. Since that time, the Sakai and Woodward schools have changed schedules, resulting in
impacts to the intersection. A roundabout is proposed. Estimated schedule and costs assume a right-of-way donation by
the School District.
Benefit: Relieve current and future congestion.
Schedule: YR1: design and permitting. YR2: construction.
Project: Wardwell Road Reconstruction & Drainage Improvements Number:00662
Location: Short of Sportsman Club to Triple Crown
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $545 $0 $0 $0 $0 $0 $0 $545
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $4 $280 $0 $0 $0 $0 $0 $0 $284
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $70 $0 $0 $0 $0 $0 $0 $0 $70
Sub-total $74 $825 $0 $0 $0 $0 $0 $0 $899
FUNDING USES (1000's)
Design/permitting $74
Construction $0 $825
Sub-total $74 $825 $0 $0 $0 $0 $0 $0 $899
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022
2023-
2034 Total
Sub-Total $0 $11 $0 $0 $0 $0 $0 $0 $11
Description: Provides for roadway surfacing reconstruction and storm drainage improvements. The City completed design
in 2014 with funds received from a DOE grant for water quality improvements. Temporary construction easements may be
needed.
Benefit: Provides for surfacing repairs. The project provides for the construction of the conveyance system for the roadway
to reduce ponding and improve water quality. Currently, the Woodward Creek culvert overtops during storm events and
does not provide for fish passage. The DOE grant allows the City to comprehensively address road repair and stormwater
drainage at a reduced cost.
Schedule: Design completed. Construction in 2017.
City of Bainbridge Island
Non-Motorized Transportation CIP (2017 - 2022)
2018 Budget Modifications
Project Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Gr
a
n
t
F
u
n
d
s
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
Wt
r
C
o
m
p
Sw
r
C
o
m
p
SS
W
M
C
o
m
p
Pr
i
o
r
Y
e
a
r
s
2017 2018 2019 2020 2021 2022
2023 -
2036 Total
NON-MOTORIZED PROJECTS
- 6-YEAR CIP
SR305/Olympic Drive Non
Motorized
X X 1,164 Y Y 1,421 120 1,272 - - - - - 2,813
Harbor Dr. to Winslow Way
SR305/Olympic Drive Non
Motorized Phase 2
X 685 Y - - - 220 720 - - - 940
Harbor Dr. to Winslow Way
Sound to Olympics Trail Phase 2
and 4
X X 2,309 Y 2,699 150 - - - - - - 2,849
Winslow W. to High School
Ravine Creek Outfall
Replacement
56 - - - - - - - 56
Ravine Creek
Sound to Olympics Trail Phase 3 X X 2,100 Y - 640 - 2,500 - - - - 3,140
STO Trail to Ericksen Ave.
Waterfront Trail Bridge
Replacement
- Y Y Y - - - - - 80 400 - 480
Waterfront Park
Madison Avenue Sidewalk Impr.X 1,450 Y - - - - - 270 1,410 - 1,680
Wyatt to High School
High School Road Safety Impr.- Y - - - - 160 - - - 160
SR305 to Grow
Connecting Pathways - Y - 25 25 25 25 25 25 - 150
C40 - Spot Projects - Y - 50 50 50 50 50 50 - 300
C40 - Miller Road X X 751 Y 180 - 920 - - - - - 1,100
Tolo to Pederson Hill
C40 - Bucklin Ph 2 X - Y 47 - - - 600 600 - - 1,247
Blakely - Fletcher Bay
C40 - Eagle Harbor - Ph 1 X - Y Y - - - 90 - - 400 400 890
Wyatt - Past Bucklin
C40 - Fletcher Bay Road X X 389 Y - 20 500 - - - - - 520
New Brooklyn to HS Rd
City Project Funding 1,175 1,005 510 723 932 795 1,065 400 6,605
Grant Totals 3,228 0 2,257 2,162 623 230 1,220 0 9,720
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,403 1,005 2,767 2,885 1,555 1,025 2,285 400 16,325
Amounts in thousands
Project: SR305 - Olympic Drive Non-Motorized Improvements Number:00596
Location: Harbor Drive to Winslow Way
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
FUNDING SOURCES (1000's)
General Fund $657 $120 $0 $0 $0 $0 $0 $0 $777
Water Fund $100 $75 $0 $0 $0 $0 $0 $0 $175
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $400 $0 $0 $0 $0 $0 $400
State Grant $764 $0 $872 $0 $0 $0 $0 $0 $1,636
Sub-total $1,521 $195 $1,272 $0 $0 $0 $0 $0 $2,988
FUNDING USES (1000's)
Design/permitting $195
Construction $1,521 $1,272
Sub-total $1,521 $195 $1,272 $0 $0 $0 $0 $0 $2,988
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022
2023-
2034 Total
Sub-Total $13 $2 $0 $0 $0 $0 $0 $0 $16
Description: The Olympic Drive/Winslow Way intersection serves the ferry on and off-loading traffic. This project provides
improvements for pedestrians and cyclists along this heavily-trafficked roadway. The unique needs of multi-modal
transportation within a limited intersection area has led to a complex project planned and approved by WSDOT and FHWA.
The project will also replace an existing undersized water main in Olympic Drive and Harborview Drive with a new 8-inch
line and install one new fire hydrant.
Benefit: Non-motorized level of service improvement, safety enhancements.
Schedule: Phase 1 Design started in 2013. 2018 grant applications have been submitted but not yet awarded.
Project: Sound to Olympics Trail, Phases 2 and 4 Number:00668
Location: Winslow Way to High School Road
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
FUNDING SOURCES (1000's)
General Fund $390 $150 $0 $0 $0 $0 $0 $0 $540
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $2,309 $0 $0 $0 $0 $0 $0 $0 $2,309
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $2,699 $150 $0 $0 $0 $0 $0 $0 $2,849
FUNDING USES (1000's)
Design/permitting
Construction $2,699 $150
Sub-total $2,699 $150 $0 $0 $0 $0 $0 $0 $2,849
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 2023-2034
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022
2023-
2034 2023-2034
Sub-Total $8 $3 $0 $0 $0 $0 $0 $0 $11
Description: The Sound to Olympics Trail (STO) project will provide a separated, shared-use pathway
along the SR305 Corridor (from High School Road to Winslow Way). The project completes the “first
mile” of the Sound to Olympics Trail.
Benefit: Non-motorized level of service improvement, safety enhancement.
Schedule: Design complete. Construction in 2017.
Project: Ravine Creek Outfall Replacement Number:00776
Location: Ravine Creek
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
FUNDING SOURCES (1000's)
General Fund $56 $0 $0 $0 $0 $0 $0 $0 $56
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $170 $0 $0 $0 $0 $0 $0 $170
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $56 $170 $0 $0 $0 $0 $0 $0 $226
FUNDING USES (1000's)
Design/permitting $56 $56
Construction $170 $170
Sub-total $56 $170 $0 $0 $0 $0 $0 $0 $226
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022
2023-
2034 Total
Sub-Total $1 $0 $0 $0 $0 $0 $0 $0 $1
Description: The existing stormwater outfall at Ravine Creek is currently undersized and does not extend to the high
water mark of the creek. The outfall needs to be replaced in order to accommodate the projected flows from the basin.
Benefit: Expand the capacity of the current stormwater system and meet DOE criteria for direct-discharge outfall to tidal
waters.
Schedule: Construction in 2017.
Project: Sound to Olympics Trail, Phase 3 Number:00726
Location: Connecting Wing Point Way to Wyatt Way
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $640 $0 $400 $0 $0 $0 $0 $1,040
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $2,100 $0 $0 $0 $0 $2,100
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $640 $0 $2,500 $0 $0 $0 $0 $3,140
FUNDING USES (1000's)
Design/permitting
Construction $640 $2,500
Sub-total $0 $640 $0 $2,500 $0 $0 $0 $0 $3,140
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022
2023-
2034 Total
Sub-Total $0 $13 $0 $8 $0 $0 $0 $0 $21
Description: The Phase 3 portion of the Sound to Olympics Trail is a bridge that will cross State Route 305, connecting at
approximately John Nelson Lane and Knechtel Way. Working with the community to determine the alignment of the bridge
is part of the scope of the initial work on this project in 2017.
Benefit: Non-motorized level of service improvement, safety enhancement.
Schedule: 2017: design. 2018: design development, construction documentation. 2019: construction.
Project: Connecting Pathways Number:00673
Location: Various Locations
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $25 $25 $25 $25 $25 $25 $0 $150
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $25 $25 $25 $25 $25 $25 $0 $150
FUNDING USES (1000's)
Design/permitting
Construction $25 $25 $25 $25 $25 $25 $150
Sub-total $0 $25 $25 $25 $25 $25 $25 $0 $150
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
on to Public Art Account
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $1 $1 $1 $1 $1 $1 $0 $3
Description: Annual funding to address trail opportunities such as easements and construction. Potential projects include
Bucklin Hill trail near Hyla School, Sportsman’s Club Spine Trail (near Sportsman’s Club), Sportsman’s Club Spine Trail (north
of Sakai School), Lost Valley starting at Carmela and on City parcel, Cave connector to STO trail, Woodward School
(Sportsman’s to Wardwell) and Central Connecting Path Spine Trail (Wardwell to Koura).
Benefit: Safety and non-motorized transportation connectivity.
Schedule: As opportunities arise.
Project: C40 - Annual Spot Projects Number:00218
Location: Various Locations
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $50 $50 $50 $50 $50 $50 $0 $300
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $50 $50 $50 $50 $50 $50 $0 $300
FUNDING USES (1000's)
Design/permitting
Construction $50 $50 $50 $50 $50 $50 $300
Sub-total $0 $50 $50 $50 $50 $50 $50 $0 $300
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $1 $1 $1 $1 $1 $1 $0 $6
Description: Add on to the Annual Roads Preservation Program to fund shoulder repairs and infill missing short segments.
Potential projects include Wyatt Way (Weaver to Finch), Eagle Harbor Drive (blind curve near McDonald), Finch Road (Wyatt
to Sportsman’s), and Fletcher Bay Road (blind curve near Island Center Hall).
Benefit: Safety and non-motorized transportation connectivity.
Schedule: Constructed annually.
Project: C40 Miller Road Number:00800
Location: Tolo Rd. to Peterson Hill Rd.
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $25 $0 $324 $0 $0 $0 $0 $0 $349
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $155 $0 $596 $0 $0 $0 $0 $0 $751
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $180 $0 $920 $0 $0 $0 $0 $0 $1,100
FUNDING USES (1000's)
Design/permitting $180 $0 $180
Construction $920 $920
Sub-total $180 $0 $920 $0 $0 $0 $0 $0 $1,100
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $1 $0 $6 $0 $0 $0 $0 $0 $7
Description: Provide shoulder widening on both sides of Miller Road from Tolo Road to Peterson Hill Road.
Assumes that no permanent ROW acquisition is needed.
Benefit: Safety and non-motorized transportation connectivity.
Schedule: YR1/2: design and permit. YR3: construction.
Project: C40 Fletcher Bay Road Number:00780
Location: High School to New Brooklyn
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $20 $111 $0 $0 $0 $0 $0 $131
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $389 $0 $0 $0 $0 $0 $389
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $20 $500 $0 $0 $0 $0 $0 $520
FUNDING USES (1000's)
Design/permitting $20 $20
Construction $500 $500
Sub-total $0 $20 $500 $0 $0 $0 $0 $0 $520
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $0 $2 $0 $0 $0 $0 $0 $3
Description: Provide shoulder widening on both sides of Fletcher Bay Road from High School Road to New Brooklyn Road.
The project is planned to be designed by COBI staff. Assumes that no permanent ROW acquisition is needed.
Benefit: Safety and non-motorized transportation connectivity.
Schedule: YR1: design and permit. YR2: construction.
City of Bainbridge Island
FLEET and EQUIPMENT CIP (2017 - 2022)
2018 Budget MODIFICATIONS
Project Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
o
n
e
n
t
Wt
r
C
o
m
p
o
n
e
n
t
Sw
r
C
o
m
p
o
n
e
n
t
SS
W
M
C
o
m
p
2017 2018 2019 2020 2021 2022
2023 -
2034 Total
FLEET & EQUIPMENT - 6-YEAR CIP
Police Vehicles (3) 300 300 189 198 208 219 230 - 1,344
Roadside Mower 158 39 - 197 - - - - - 197
Medium Duty Pickup Truck (2) 11 46 39 - 96 - - - - - 96
SUV 11 7 7 7 7 - 39 - - - - - 39
Light Duty Pickup Truck (Engineering) 10 9 9 9 9 - 46 - - - - - 46
Light Duty Pickup Truck (Water/Sewer) 23 23 - 46 - - - - - 46
Broom Sweeper 80 - - 80 - - - - 80
Chipper 80 - - 80 - - - - 80
Van 44 11 - - 55 - - - - 55
PUP Trailer 29 29 - - 58 - - - - 58
Dump Truck Cab/Chassis 116 116 - - 232 - - - - 232
Light Duty Pick Up 10 9 9 9 9 - - 46 - - - - 46
SUV 9 16 16 - - 41 - - - - 41
Police Boat 69 - - 69 - - - - 69
Heavy Duty Pickup 17 68 - - - 85 - - - 85
Van 13 52 - - - 65 - - - 65
Medium Duty Pickup Truck 50 13 - - - 63 - - - 63
Light Duty Pick Up 49 - - - 49 - - - 49
Backhoe 160 - - - - 160 - - 160
Medium Duty Pickup Truck (2) 22 86 20 20 20 - - - - 168 - - 168
Police Motorcycles (2) 52 - - - - 52 - - 52
Light Duty Pick Up (2) 64 11 11 11 11 - - - - - 108 - 108
Road Grader 665 - - - - - 665 - 665
Fork Lift 10 11 11 11 11 - - - - - 54 - 54
Police Boat Trailer 20 - - - - - 20 - 20
Data Storage (SAN) System Replacement 20 - - - - - 20 - 20
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 300 613 859 470 599 1,097 - 3,938
Amounts in thousands
City of Bainbridge Island
Facilities CIP (2017- 2022)
2018 Budget Modifications
Project Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Gr
a
n
t
F
u
n
d
s
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
o
n
e
n
t
Wt
r
C
o
m
p
o
n
e
n
t
Sw
r
C
o
m
p
o
n
e
n
t
SS
W
M
C
o
m
p
Prior
Years 2017 2018 2019 2020 2021 2022
2023 -
2034 Total
City Dock Impr.x x 1,100 Y 2,067 300 - - - - - - 2,367
Waterfront Park -
Police and Municipal Court
Building
- Y 500 2,600 - - - - - - 3,100
Police Station/Court -
Downtown Parking Facility - Y - TBD TBD - - - - - -
Winslow -
Road End Improvements - Y 150 - - - - - - - 150
Island Wide -
Fueling System
Design/Upgrade
- Y - 20 70 - - - - - 90
Public Works Facility -
Backup HVAC Unit - - 25 - - - - - - 25
Server Room -
Eagle Harbor Viewing
Platform
- - - - 26 - - - - 26
-
City Total 1,617 2,945 70 - - - - - 4,632
Grant Totals 1,100 - - - - - - - 1,100
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,717 2,945 70 - - - - - 5,732
FACILITIES PROJECTS - 6-
Amounts in thousands
Project: City Dock Replacement Number:00732
Location: Waterfront Park
Project Description
Capital Funding (1000's)
Prior
Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
FUNDING SOURCES (1000's)
General Fund $967 $300 $0 $0 $0 $0 $0 $0 $1,267
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $1,100 $0 $0 $0 $0 $0 $0 $0 $1,100
Sub-total $2,067 $300 $0 $0 $0 $0 $0 $0 $2,367
FUNDING USES (1000's)
Design/permitting $220 $0 $0 $0 $0 $0 $0 $0 $220
Construction $1,847 $300 $0 $0 $0 $0 $0 $0 $2,147
Sub-total $2,067 $300 $0 $0 $0 $0 $0 $0 $2,367
Estimated Impact on Future Operating Budget
Prior 2017 2018 2019 2020 2021 2022 2023-Total
Operating
Debt Service
Sub-total
Prior
Yrs 2017 2018 2019 2020 2021 2022
2023-
2034 Total
2% Contribution to
Public Art Account $19 $6 $0 $0 $0 $0 $0 $0 $25
Description: This project provides for replacement of the Waterfront Park City Dock and expansion of the Boat
Ramp.
Benefit: Maintain utility of public infrastructure associated with the City park. Ensure user safety is maintained.
Enhance accessibility and utility for various user groups.
Schedule: Design complete. Construction to begin in 2017.
Project: Police and Municipal Court Facility Number:00724
Location: TBD
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $500 $2,600 $0 $0 $0 $0 $0 $0 $3,100
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Long-Term Debt $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $500 $2,600 $0 $0 $0 $0 $0 $0 $3,100
FUNDING USES (1000's)
Design/Land Acquisition $500 $2,600 $0 $0 $0 $0 $0 $0 $3,100
Construction $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $500 $2,600 $0 $0 $0 $0 $0 $0 $3,100
Estimated Impact on Future Operating Budget
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $10 $52 $0 $0 $0 $0 $0 $0 $62
Description: This project provides for a replacement Police Station and relocated Municipal Court.
Benefit: Replacement Police facility will provide adequate space for current and future departmental needs, while correcting
numerous space, structural, and security deficiencies in the current facility. New Court facility will replace existing leased space,
which marginally meets current requirements and will allow operational efficiencies by being co-located with the Police Station.
Schedule: Design beginning in 2015, construction in 2018.
Project: Road End Improvements Number:00698
Location: Island-Wide
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $150 $0 $0 $0 $0 $0 $0 $0 $150
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $150 $0 $0 $0 $0 $0 $0 $0 $150
FUNDING USES (1000's)
Design/permitting $0 $0 $0 $0 $0 $0 $0 $0 $0
Construction $150 $0 $0 $0 $0 $0 $0 $0 $150
Sub-total $150 $0 $0 $0 $0 $0 $0 $0 $150
Estimated Impact on Future Operating Budget
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
2% Contribution to
Public Art Account $3 $0 $0 $0 $0 $0 $0 $0 $3
Description: This project provides for infrastructure enhancements at various City-owned road ends.
Benefit: The project will enhance public access to the waterfront, ensure user safety is maintained, and enhance accessibility and utility for various user groups.
Schedule: Design and construction in 2015 and 2016.
Project: Fueling System Design/Upgrade Number:00811
Location: Public Works Facility
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $20 $70 $0 $0 $0 $0 $0 $90
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $20 $70 $0 $0 $0 $0 $0 $90
FUNDING USES (1000's)
Design/permitting $0 $20 $0 $0 $0 $0 $0 $0 $20
Construction $0 $0 $70 $0 $0 $0 $0 $0 $70
Sub-total $0 $20 $70 $0 $0 $0 $0 $0 $90
Estimated Impact on Future Operating Budget
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-total $0 $0 $1 $0 $0 $0 $0 $0 $2
Description: Design and construction of capacity improvements to the fuel system at the Public Works facility.
Benefit: Upgrades to system will allow better service to users, including City police. Additionally, the system is part of the
City's emergency management reserve, allowing continuing service in emergency situations.
Schedule: Design in 2017, construction in 2018.
Project: Backup HVAC Unit Number:00813
Location: Server Room
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $25 $0 $0 $0 $0 $0 $0 $25
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $25 $0 $0 $0 $0 $0 $0 $25
FUNDING USES (1000's)
Design/permitting $0 $0 $0 $0 $0 $0 $0 $0 $0
Construction $0 $25 $0 $0 $0 $0 $0 $0 $25
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $25
Estimated Impact on Future Operating Budget
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-total $0 $1 $0 $0 $0 $0 $0 $0 $1
Description: The City Hall HVAC system upgrade project is based on the recommendation of the city’s current HVAC service
provider, Air Management Systems Inc. City Hall is served by 21 individual heat pumps. The heat pumps are currently 13 years
old and have an estimated life expectancy of 12 – 15 years. The heat pump that serves the Information Technology room will
be replaced in 2017.
Benefit: Systems reliability.
Schedule: Construction in 2017.
City of Bainbridge Island
Water CIP (2017- 2022)
2018 Budget Modifications
Project Location Gr
a
n
t
E
l
i
g
i
b
l
e
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
Wt
r
C
o
m
p
Sw
r
C
o
m
p
SS
W
M
C
o
m
p
Prior
Years 2017 2018 2019 2020 2021 2022
2023 -
2034 Total
WATER PROJECTS - 6-YEAR CIP
SR 305 Olympic Drive Non-
Motorized Improvements Olympic Drive
Y Y 100 75 - - - - - - 175
Tank Storage Improvements
High School
Reservoir
Y - 80 500 - - - - - 580
Emergency Generator Head of Bay Y - 150 - - - - - - 150
Water Treatment
Improvements Winslow
Y - 80 500 - - - - - 580
Rockaway Intertie Rockaway Y - 250 - - - - - - 250
Wyatt Way Reconstruction Wyatt Way
Y - 150 - - - - - - 150
High Zone Improvements
High School/New
Brooklyn
Y - 150 950 - - - - - 1,100
Pressure Reducing Station
(PRV)
Cave Avenue Y - - 75 - - - - - 75
Chlorine Generator
Upgrades Various
Y - - - - - 250 - - 250
Meter Replacements Various Y - - - 150 - - 150 - 300
Fire Flow Improvements Winslow Y - - - 75 350 - - - 425
Pipeline Improvements Shephard Way Y - - - 50 300 - - - 350
Waterfront Trail Bridge Waterfront Park Y Y Y - - - - - 80 400 - 480
-
City Project Funding 100 935 2,025 275 650 330 550 - 4,865
Grant Totals - - - - - - - - -
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100 935 2,025 275 650 330 550 - 4,865
Amounts in thousands
Project: SR 305 Olympic Drive Non-Motorized Improvements Number:00596
Location: Olympic Drive
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $657 $120 $0 $0 $0 $0 $0 $0 $777
Water Fund $100 $75 $0 $0 $0 $0 $0 $0 $175
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $400 $0 $0 $0 $0 $0 $400
State Grant $764 $0 $872 $0 $0 $0 $0 $0 $1,636
Sub-total $1,521 $195 $1,272 $0 $0 $0 $0 $0 $2,988
FUNDING USES (1000's)
Design/permitting $195
Construction $1,521 $1,272
Sub-total $1,521 $195 $1,272 $0 $0 $0 $0 $0 $2,988
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $15 $0 $17 $0 $0 $0 $0 $0 $33
INSERT PICTURES HERE
Description: The Olympic Drive/Winslow Way intersection serves the ferry on and off-loading traffic. This project provides
improvements for pedestrians and cyclists along this heavily-trafficked roadway. The unique needs of multi-modal
transportation within a limited intersection area has led to a complex project planned and approved by WSDOT and
FHWA. The project will also replace an existing undersized water main in Olympic Drive and Harborview Drive with a new
8-inch line and install one new fire hydrant.
Benefit: Non-motorized level of service improvement, safety enhancements.
Schedule: Phase 1 Design started in 2013. 2018 grant applications have been submitted but not yet awarded.
Project: Tank Storage Improvements Number:00817
Location: High School Reservoir
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $80 $500 $0 $0 $0 $0 $0 $580
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $80 $500 $0 $0 $0 $0 $0 $580
FUNDING USES (1000's)
Design/permitting $80
Construction $500
Sub-total $0 $80 $500 $0 $0 $0 $0 $0 $580
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: The purpose of this project is to assess the seismic resiliency of the City's High School reservoirs. The project
also includes analysis of tank mixing, the integrity of tank valves, and the condition of tank interior and exterior coating. The
storage facility analysis will be performed in the first year, and construction of identified improvements will occur in the second
year.
Benefit: Ensure the long-term reliability of the water system.
Schedule: Design in 2017 and construction in 2018.
Project: Emergency Generator Number:00814
Location: Head of Bay
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $150 $0 $0 $0 $0 $0 $0 $150
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $150 $0 $0 $0 $0 $0 $0 $150
FUNDING USES (1000's)
Design/permitting
Construction $150
Sub-total $0 $150 $0 $0 $0 $0 $0 $0 $150
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: Install an emergency generator to provide a permanent, redundant power source for the well site that provides
25% of the supply for the system.
Benefit: Improves system reliability in the event of power outages.
Schedule: Purchase and install in 2017.
Project: Water Treatment Improvements Number:00816
Location: Winslow
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $80 $500 $0 $0 $0 $0 $0 $580
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $80 $500 $0 $0 $0 $0 $0 $580
FUNDING USES (1000's)
Design/permitting $80
Construction $500
Sub-total $0 $80 $500 $0 $0 $0 $0 $0 $580
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: This project implements water treatment improvements to keep iron, manganese, and sulfide levels from
exceeding the maximum contaminant levels (MCLs).
Benefit: Improve water quality for the system.
Schedule: YR1: design. YR2: construction.
Project: Rockaway Intertie Number:00815
Location: Rockaway
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $250 $0 $0 $0 $0 $0 $0 $250
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $250 $0 $0 $0 $0 $0 $0 $250
FUNDING USES (1000's)
Design/permitting
Construction $250
Sub-total $0 $250 $0 $0 $0 $0 $0 $0 $250
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: The Rockaway Beach Water System requires additional supply and storage to meet the City's criteria. The
existing single supply well has limited and declining capacity, and the storage tank is undersized. This project will complete an
intertie with the adjacent KPUD water system.
Benefit: Improve the reliability and fire protection for the Rockaway Water System.
Schedule: Design and construction in the same year.
Project: Wyatt Way Reconstruction Phase 1 Number:00708
Location: Madison to Lovell
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
FUNDING SOURCES (1000's)
General Fund $512 $0 $672 $0 $0 $0 $0 $0 $1,184
Water Fund $0 $150 $0 $0 $0 $0 $0 $0 $150
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $1,088 $0 $1,428 $0 $0 $0 $0 $0 $2,516
Sub-total $1,600 $150 $2,100 $0 $0 $0 $0 $0 $3,850
FUNDING USES (1000's)
Design/permitting $1,600 $150
Construction $2,100
Sub-total $1,600 $150 $2,100 $0 $0 $0 $0 $0 $3,850
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022
2023-
2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022
2023-
2034 Total
Sub-total $10 $0 $13 $0 $0 $0 $0 $0 $24
Description: Capacity (level of service) improvements to the intersection of Madison Avenue and Wyatt Way, including
a roundabout. Complete sidewalk and bicycle facilities on both sides of Wyatt from Madison to Lovell. Reconstruct
roadway surfacing and drainage. Additional right of way needed along frontage. Design 50% completed in 2006. State
(TIB) grant funding received in 2015.
Benefit: Relieve current and future intersection congestion and ensure mobility by implementing improvements prior to
development. Address a gap in non-motorized facilities to improve mobility and safety. Support businesses and
employment in the downtown area.
Schedule: YR1/2: design, ROW, and permitting. YR3: construction.
Project: High Zone Improvements Number:00819
Location: High School/New Brooklyn
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $150 $950 $0 $0 $0 $0 $0 $1,100
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $150 $950 $0 $0 $0 $0 $0 $1,100
FUNDING USES (1000's)
Design/permitting $150
Construction $950
Sub-total $0 $150 $950 $0 $0 $0 $0 $0 $1,100
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: A group of high elevation connections within the Winslow Water System do not have adequate pressure or fire
flow to meet the City's criteria. These deficiencies could be resolved by creating a new pressure zone above the High Zone at
an approximate HGL of 405 feet. This project will complete a study and plan for improvements in the first year with
construction scheduled in the second year. The study will determine the extent of the new pressure zone and the required
system modifications.
Benefit: Improve water system quality and fire protection.
Schedule: YR1: design. YR2: construction.
Project: Cave Avenue Pressure Reducing Station Number:00884
Location: Cave Avenue
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $75 $0 $0 $0 $0 $0 $75
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $0 $75 $0 $0 $0 $0 $0 $75
FUNDING USES (1000's)
Design/permitting $75
Construction $0
Sub-total $0 $0 $75 $0 $0 $0 $0 $0 $75
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: The developer of the proposed Bainbridge Landing project will need to make water system improvements in order
to achieve the required fire flow required for the development. These improvements will increase the existing service pressure
for the area. In order to ensure no existing homes are damaged by the higher pressure water service, individual pressure
reducing valves will be offered to individual homeowners. In addition, in order to improve the operations of the water system
in this area a new water line connection from the developer-installed facilities on Cave Avenue to Gilmore Way will be needed.
Benefit: Improve fire flow deficiency and support new system pressure changes from approved Bainbridge Landing
Development.
Schedule: Design and construct in 2018.
City of Bainbridge Island
Sewer CIP (2017 - 2022)
2018 Budget Modifications
Project Location and/or Phase Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Gr
a
n
t
F
u
n
d
s
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
o
n
e
n
t
Wt
r
C
o
m
p
o
n
e
n
t
Sw
r
C
o
m
p
o
n
e
n
t
SS
W
M
C
o
m
p
Prior
Years 2017 2018 2019 2020 2021 2022
2023 -
2034 Total
SEWER PROJECTS - 6-YEAR CIP
Rehabilitate Pump Station Village - Y - 200 700 - - - - - 900
Pump Station/Force Main Upgrade NTW/New Brooklyn/Madison - Y 700 - - - - - - - 700
Rehabilitate Pump Station Wing Point - Y - - 100 450 - - - - 550
Madrona Townhomes Sewer Madrona Lane - Y - 235 - - - - - - 235
Replace Beach Sewer Main Lower Lovell - Y - 200 950 - - - - - 1,150
Rehabilitate Pump Station Old Treatment Plant - Y - - - 100 450 - - - 550
Rehabilitate Pump Station Lower Hawley - Y - - - - - 100 400 - 500
Waterfront Trail Bridge Replacement Waterfront Park - Y Y Y - - - - - 80 400 - 480
Rehabilitate Pumps Sunday Cove - Y - - - 150 - - - - 150
SEWER PROJECTS - 20-YEAR CFP
Winslow Way Reconstr. Ph 2 Madison to Grow Y Y Y TBD -
Pump Station Upgrade - Various Y Y Y TBD -
WWTP Upgrade - Various Hawley TBD -
Extend Outfall Wing Point TBD -
City Total 700 635 1,750 700 450 180 800 - 5,215
Grant Total - - - - - - - - -
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 700 635 1,750 700 450 180 800 - 5,215
Amounts in thousands
Project: Rehabilitate Pump Station Number:00782
Location: Village
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $200 $700 $0 $0 $0 $0 $0 $900
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $200 $700 $0 $0 $0 $0 $0 $900
FUNDING USES (1000's)
Design/permitting $200 $200
Construction $700 $700
Sub-total $0 $200 $700 $0 $0 $0 $0 $0 $900
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: The Village Pump Station is expected to require capacity upgrades by 2025. To meet 2035 projected flows, the
Village Pump Station needs to be upgraded to a firm capacity of approximately 850 gpm. Additionally, the Village Pump Station
has not been upgraded since its installation in 1979. Due to its age, the station’s valves, controls, and telemetry need to be
replaced. The dry well and wet well are showing signs of advanced corrosion. This station will require a comprehensive
rehabilitation similar to the City’s 2006 Highway 305 Pump Station upgrade project.
Benefit: Improved system capacity and reliability.
Schedule: YR1: design. YR2: construction.
Project: Pump Station/Force Main Upgrade Number:00783
Location: NTW/New Brooklyn/Madison
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $700 $0 $0 $0 $0 $0 $0 $0 $700
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $700 $0 $0 $0 $0 $0 $0 $0 $700
FUNDING USES (1000's)
Design/permitting
Construction $700 $700
Sub-total $700 $0 $0 $0 $0 $0 $0 $0 $700
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
2% Contribution to
Public Art Account $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: This project provides upgrades to the City’s North Town Woods sanitary sewer pump station and force main pipe in New Brooklyn Road and Madison Avenue. These
upgrades will increase the capacity of the sewer system to serve the planned service area. The first project has been awarded to replace the forcemain from Madison Avenue to
Three Tree Lane with a new section of gravity main. This work will be completed by the end of 2017. A new forcemain from High School Road to New Brooklyn Road is under
design and will be constructed in early 2018.
Benefit: System capacity and reliability.
Schedule: Design and construction in the same year.
Project: Rehabilitate Pump Station Number:00820
Location: Wing Point
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $100 $450 $0 $0 $0 $0 $550
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $0 $100 $450 $0 $0 $0 $0 $550
FUNDING USES (1000's)
Design/permitting $100 $100
Construction $450 $450
Sub-total $0 $0 $100 $450 $0 $0 $0 $0 $550
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: The Wing Point Pump Station has not been upgraded since its construction in 1979 and is reaching the end of its
useful life. Besides the general condition concerns that also apply to the City’s other aging pump stations (wet well controls
should be replaced to meet current safety standards and the performance of the cathodic protection components of these
stations should be assessed), the Wing Point Pump Station has some unique upgrade requirements. First, the station access
hatch is currently under water during extreme high tides and should be extended. Second, it is recommended that an air
vacuum relief valve be installed in the force main at the discharge of the Wing Point pumps.
Benefit: Improves reliability of current sewer collection system.
Schedule: YR1: design. YR2: construction.
Project: Replace Beach Sewer Force Main Number:00721
Location: Lower Lovell
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $200 $950 $0 $0 $0 $0 $0 $1,150
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $200 $950 $0 $0 $0 $0 $0 $1,150
FUNDING USES (1000's)
Design/permitting $200 $200
Construction $950 $950
Sub-total $0 $200 $950 $0 $0 $0 $0 $0 $1,150
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: The current Lower Lovell sewer beach main is severely deteriorated as documented during maintenance
operations completed in 2015 and 2016. It is infeasible to repair or replace the line in its current location, so this project will
design and construct a new collection system for the basin in the upland area.
Benefit: Replacement of a deteriorated system with a reliable sewer collection system that can be maintained in the future.
Schedule: YR1: design. YR2: construction.
Project: Madrona Townhomes/Henshaw Sewer Number:00806
Location: Henshaw Road, City Hall Parking Lot
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $235 $0 $0 $0 $0 $0 $0 $235
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant
$0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $235 $0 $0 $0 $0 $0 $0 $235
FUNDING USES (1000's)
Design/permitting $235 $235
Construction $0 $0
Sub-total $0 $235 $0 $0 $0 $0 $0 $0 $235
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: Reconstruct sewer lines to replace deteriorated lines and provide additional capacity for new development along
Madrona Lane. Work will be accomplished by developer under Developer's Extension Agreement with the City participating
in cost-sharing.
Benefit: Replacement of a deteriorated system with a reliable sewer collection system that can be maintained in the future.
Schedule: Design and construction in 2017.
City of Bainbridge Island
Stormwater CIP (2017 - 2022)
2018 Budget Modifications
Project Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Gr
a
n
t
F
u
n
d
s
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
o
n
e
n
t
Wt
r
C
o
m
p
o
n
e
n
t
Sw
r
C
o
m
p
o
n
e
n
t
SS
W
M
C
o
m
p
Pr
i
o
r
Y
e
a
r
s
2017 2018 2019 2020 2021 2022
2023 -
2036 Total
STORMWATER PROJECTS - 6-YEAR CIP
Rockaway Beach Rd. Outfall Replacement - Y 255 1 - - - - - - 256
Ravine Creek Outfall Replacement - Y - 170 - - - - - - 170
Eagle Hrbr. Dr. @ McDonald Creek Culvert - Y - 200 - 900 - - - - 1,100
Wardwell Rd Reconstruction & Drainage 70 Y 74 280 - - - - - - 354
Blakely Falls Creek Culvert (Halls Hill)- Y - - - - 150 - - - 150
Springbrook Creek Restoration and Culvert
Replacement
x 450
Y
- - - - 600 - - - 600
Yeomalt Area Drainage Improvements - Y 60 - - - - 510 - - 570
C40 Eagle Harbor Phase 1 - Y Y - - - 100 - - 450 - 550
-
City Funding 319 651 - 1,000 300 510 450 - 3,230
Grant Totals 70 - - - 450 - - - 520
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 389 651 - 1,000 750 510 450 - 3,750
Amounts in thousands
Project: Rockaway Beach Rd. Outfall Replacement Number:00714
Location: Rockaway Beach Rd.
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $255 $1 $0 $0 $0 $0 $0 $0 $256
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $255 $1 $0 $0 $0 $0 $0 $0 $256
FUNDING USES (1000's)
Design/permitting $75 $75
Construction $180 $1 $181
Sub-total $255 $1 $0 $0 $0 $0 $0 $0 $256
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
2% Contribution to
Public Art Account $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: Repair an existing 12-inch reinforced concrete pipe (RCP) stormwater outfall between Rockaway Beach Road and the shoreline.
Benefit: Improve drainage from the bluff, which is a critical slope with sandy soils and a history of slides.
Schedule:
Project: Ravine Creek Outfall Replacement Number:00776
Location: Ravine Creek
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $56 $0 $0 $0 $0 $0 $0 $0 $56
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $170 $0 $0 $0 $0 $0 $0 $170
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $56 $170 $0 $0 $0 $0 $0 $0 $226
FUNDING USES (1000's)
Design/permitting $56 $56
Construction $170 $170
Sub-total $56 $170 $0 $0 $0 $0 $0 $0 $226
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $1 $0 $0 $0 $0 $0 $0 $0 $1
Description: The existing stormwater outfall at Ravine Creek is currently undersized and does not extend to the high water
mark of the creek. The outfall needs to be replaced in order to accommodate the projected flows from the basin.
Benefit: Expand the capacity of the current stormwater system and meet DOE criteria for direct-discharge outfall to tidal
waters.
Schedule: Construction in 2017.
Project: Eagle Harbor Drive at McDonald Creek Number:00823
Location: 5530 Eagle Harbor Drive
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $200 $0 $900 $0 $0 $0 $0 $1,100
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $200 $0 $900 $0 $0 $0 $0 $1,100
FUNDING USES (1000's)
Design/permitting $200 $200
Construction $900 $900
Sub-total $0 $200 $0 $900 $0 $0 $0 $0 $1,100
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 2023-2034
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 2023-2034
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: The existing concrete culvert is perched at its outlet and a section of pipe has dropped. Shoulder settlement is an
indicator there may be separations. The project provides for the repair of the existing concrete culvert, assuming trenchless
methods can be employed to line the culvert.
Benefit: Preservation. Avoid much more costly replacement and mitigate failure risk.
Schedule: Design and permitting in 2017 and 2018. Construction in 2019.
Project: Wardwell Road Reconstruction Project & Drain Improvements Number:00662
Location: Woodward Creek Fish Passage Culvert
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $545 $0 $0 $0 $0 $0 $0 $545
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $4 $280 $0 $0 $0 $0 $0 $0 $284
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $70 $0 $0 $0 $0 $0 $0 $0 $70
Sub-total $74 $825 $0 $0 $0 $0 $0 $0 $899
FUNDING USES (1000's)
Design/permitting $74 $74
Construction $825 $825
Sub-total $74 $825 $0 $0 $0 $0 $0 $0 $899
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
Sub-Total $0 $11 $0 $0 $0 $0 $0 $0 $11
Description: Woodward Creek overtops Wardwell Road during storm events and backs up, flooding private property.
Recommend replacement of a failing culvert with a new fish passage culvert. This project may be combined with the Wardwell
Road Reconstruction and Drainage Project. Temporary construction easements may be needed.
Benefit: Replaces an undersized culvert and addresses fish passage. The project furthers the water quality and habitat goals of
the Murden Cove Watershed Nutrient and Bacteria Reduction Project.
Schedule: YR1: design and permitting. YR2: construction.
Project: Yeomalt Area Drainage Improvements Number:00663
Location: Area bordered by Cherry, Yeomalt, Madrona and Wing Point Way
Project Description
Capital Funding (1000's)
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $60 $0 $0 $0 $0 $510 $0 $0 $570
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $60 $0 $0 $0 $0 $510 $0 $0 $570
FUNDING USES (1000's)
Design/permitting $60 $60
Construction $510 $510
Sub-total $60 $0 $0 $0 $0 $510 $0 $0 $570
Estimated Impact on Future Operating Budget
Prior Yrs.2017 2018 2019 2020 2021 2022 2023-2034 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
Prior Yrs 2017 2018 2019 2020 2021 2022 2023-2034 Total
2% Contribution to
Public Art Account $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: Provides for storm drainage improvements in the Yeomalt area. The City completed design in 2014 with funds received from a DOE grant for water
quality improvements. This work was identified in the 2013 Area Drainage Study performed by Browne Wheeler Engineering.
Benefit: Much of the Wing Point area above Yeomalt Point was developed before regulations required conveyance systems. Currently there are drainage problems in
many areas and/or existing conveyances are lacking or inadequate.
Schedule: Design completed in 2014.