Loading...
STAFF REPORT STATION 22 Department of Planning and community development Staff Report Date: October 19, 2016 To: Stafford Smith, City of Bainbridge Island Hearing Examiner From: Joshua Machen, AICP Planning Manager Project: Bainbridge Island Fire Department Station 22 Site Plan and Design Review/ Conditional Use Permit File Number: PLN14200 SPR/CUP I. INTRODUCTION Applicant: Mackenzie C/O Michael Chen 500 Union Street, Suite 545 Seattle, WA 98101 Owner: Bainbridge Island Fire Department Request: The proposed project is the redevelopment of the existing fire station on the site, Station #22. The redeveloped fire station will have a gross floor area of approximately 16,808 square feet with 30 parking spaces (Attachments B & C). Location: 7934 Bucklin Hill Road NE, being portions of Sect. 28, T. 25N. R. 02E. W.M. Tax parcel numbers 4178-000-012-2004 Environmental Review: A SEPA Threshold Determination was issued on October 11, 2016 Recommendation: Approve the application with the following conditions: SEPA Conditions 1. All graded materials removed from the subject property shall be hauled to and deposited at City approved locations (Note: local regulations require that a grade/fill permit is obtained for any grading or filling of 50 cubic yards of material or more if the grading or filling occurs on sites that have not been previously approved for such activities. A SEPA Threshold Determination is required Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 2 for any fill over 100 cubic yards on sites that have not been previously received a SEPA determination). 2. Contractor is required to stop work and immediately notify the Department of Planning and Community Development and the Washington State Office of Archaeology and Historic Preservation if any historical or archaeological artifacts are uncovered during excavation or construction. 3. To mitigate the possible impact on adjacent properties from light and glare, all exterior lighting shall be hooded and shielded so that the bulb is not visible from adjacent properties. All landscape lighting shall be downcast and lighting within surface parking lots shall be no higher than 14 feet above grade. All exterior lighting shall comply with BIMC Chapter 15.34. 4. Prior to any clearing or grading on the site, chain-link construction fencing shall be installed and inspected by the City at the edge of the tree’s dripline for trees being preserved as part of the development. 5. All construction activities shall comply with the construction operating hours limitations contained in BIMC Chapter 16.16. Noise produced by this development must comply with the maximum environmental noise levels established by the Washington Administrative Code 173-60 or its successor. 6. All on-site stormwater facilities shall remain privately owned and maintained. The owner shall be responsible for maintenance of the storm drainage facilities for this development following construction. Annual inspection and maintenance reports shall be provided to the City. A declaration of Covenant for stormwater system operation and maintenance will be required to be recorded before issuance of occupancy permits. The approved language for the Declaration of Covenant is found in BIMC 15.21. Project Conditions: 7. The site shall be developed in substantial conformance with the revised site plans date stamped April 29, 2016 and building elevations date stamped received October 18, 2016, except to conform to these conditions. 8. The applicant shall obtain an approved building and/or grading permit from the Department of Planning and Community Development, prior to any construction activities on the site. 9. Sign permits shall be obtained as required by BIMC Section 15.08. 10. Parking shall be improved in substantial conformance with the approved site plan. The parking area shall be paved, all stalls shall be striped to their full dimensions and appropriate signage shall be placed at each handicap stall(s). Each parking stall shall meet the dimensional standards of BIMC Table 18.15.020-3 outside of required driving aisles or minimum sidewalk width of five feet. 11. The primary walkways throughout the development shall meet accessibility requirements including being surfaced with nonskid hard surfaces and providing a minimum of five feet of unobstructed width. Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 3 12. A minimum of 4 bicycle spaces shall be installed prior to final inspection. The rack shall allow for the wheel and frame of the bicycle to be locked. The bicycle stalls shall provide for both visitors and employees of the station. 13. The location of generator pad on the east side of the property shall be relocated outside of the minimum 15-foot perimeter buffer. Prior to building permit issuance revised drawings depicting this change shall be submitted and approved. 14. All landscaping shall be installed as provided in the approved landscaping plans or a performance assurance device shall be submitted and approved, prior to final inspection of the station. The installation of landscaping shall be verified by a Landscape Professional and a landscaping declaration shall be signed by either the certified landscape professional or owner. 15. Prior to occupancy of the station or the release of a landscaping performance assurance, a landscaping maintenance assurance device for the required landscaping shall be provided to COBI for a period of three years. All landscaping and buffers shall be maintained for the life of the project. 16. An International Society of Arboriculture (ISA) valuation for all trees, where the critical root zone of a tree required to be retained may be impacted by clearing, grading construction, development, or maintenance, shall be submitted to issuance of the building permit for the station. 17. In order to define the circulation system and pedestrian separation, raised curbs shall be used to separate landscaping and raised walkways from parking stalls and drive aisles. 18. Exterior trash receptacles/recycling facilities shall be fully screened with solid walls and gates (no chain-link fencing). The screening enclosures shall be architecturally consistent with the adjacent station. All enclosures shall be constructed and inspected prior to final inspection. 19. At the time of building permit submittal, detailed lighting plans demonstrating compliance with the lighting standards shall be submitted for review and approval by the COBI. 20. All mechanical equipment shall either be located underground, incorporated into landscaping or integrated within the building or roof form of the building. Parapet walls may be used to screen roof top mechanical equipment as long as equipment is completely obscured from view and the parapet does not substantially detract from the building architecture. 21. Proposed fire station must be equipped with fire sprinklers and fire alarms as per the adopted code. 22. The COBI Non-Motorized 6-year Capital Improvement Plan includes the C40-Bucklin Phase 2 Project that extends along the frontage of the Bainbridge Island Fire Station 22. Frontage improvements along Bucklin Hill Road NE corresponding to the CIP C40 Bucklin Phase 2 Project must be completed or a fee-in-lieu must be provided to the City prior to Certificate of Occupancy and /or Final Inspection. Frontage improvements include pedestrian sidewalk and bike lane. Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 4 Staff Analysis II. FINDINGS OF FACT A. Site Characteristics 1. ASSESSOR’S RECORD INFORMATION: 4178-000-012-2004, Bainbridge Island Fire District, 3.05 Acres 2. TERRAIN: The property relatively flat with a gentle slope up in the northern portion of the property. The property has just a few trees adjacent to the existing fire station and native trees and shrub forest in the north 100-150 feet of the property. (Attachments B & E) 3. SITE DEVELOPMENT/EXISTING USE: The site contains an existing fire station and related improvements, including parking and septic system. Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 5 4. ACCESS: Vehicular access to the site is from Bucklin Hill Road 5. PUBLIC SERVICES: a. Police - Bainbridge Island Police Department b. Fire - Bainbridge Island Fire District 6. EXISTING ZONING/ COMPREHENSIVE PLAN DESIGNATION: R-1, 1 unit per acre residential zone OSR-1, Open Space Residential, one unit per acre 7. SURROUNDING ZONING/COMPRHENSIVE PLAN DESIGNATION: a. North: R-1 b. East: R-1 c. South: R-0.4 d. West: R-1 8. SURROUNDING USES: a. North: Single-family Residential Development b. East: American Legion Hall c. South: Hyla, a Private School d. West: Single-family Residential Development Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 6 B. History 1. A pre-application conference was held December 1, 2015 2. The Design Review Board reviewed the pre-application proposal on December21, 2015 and made several recommendations on the design (Attachment U). 3. A public participation meeting was held at the City on January 11, 2016. Comments and responses from that meeting are included as Attachment A. 4. A formal application for the Site Plan and Design Review and Conditional Use Permit were submitted on January 15, 2016. 5. On February 22, 2016, the application was taken back to the Design Review Board, the board reviewed the revised drawings and recommended approval of the application (Attachment V). 6. Revisions to the application and submission documents were submitted on March 4, 2016. 7. A notice of technically complete application was issued on March 9, 2016, but requested additional information to be provided prior to the complete processing of the applications. 8. A Notice of Application/SEPA comment period was published and mailed out March 11, 2016. 9. Revisions to the application were received on April 29,2016 10. On May 27th a memo from the City’s Development engineer indicated the application was still deficient proper documentation regarding stormwater. 11. On June 7, 2016 a Preliminary Technical Information Report (drainage report) was submitted to the City. 12. On June 22, 2016 the Development Engineer provided a memo indicating that the revisions received from the applicant in April and the drainage report received in June were still deficient and that additional information and revisions were required. 13. On September 23, 2016 revised stormwater drainage plans were received. 14. The City Development Engineer reviewed the project and provided final comments and recommended conditions on October 13(Attachment T). 15. On October 27, 2016 the City of Bainbridge Island Planning Commission reviewed the proposed application and recommended approval of the application with one additional condition regarding development planning for new bike lane along Madison Avenue. The Planning Commission also approved the additional parking above the required parking as described in Attachment AA. C. Public Comment No public comment was received during the official public comment period. D. Comprehensive Plan Analysis OS 4.1 The R-1 District is intended to recognize an existing development pattern of one unit per acre. The subject development is proposed within the residential one-acre zone. The Fire station is an essential public facility and is replacing an existing fire station. The changes to the station are being properly reviewed through the Site Plan and Design Review process as well as the Conditional Use Permit process to ensure compliance with the code requirements as well as compatibility with neighboring development Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 7 SD 1.3 The City shall require new development to provide both on-site improvements and off- site improvements necessary to avoid adverse downstream water quality and quantity impacts. The applicant has submitted an engineered comprehensive stormwater drainage plan that addresses downstream water quality and quantity impacts. The submitted plans were reviewed by and found to meet local and state regulations (Attachments T). SD 1.4 Where appropriate and feasible, infiltration of stormwater is preferred over surface discharge to downstream systems. The return of uncontaminated precipitation to the soil at natural rates near where it falls should be encouraged through the use of detention ponds, grassy swales and infiltration facilities. The stormwater drainage plan submitted with the application includes several of these features, including but not limited to raingardens, and infiltration/dispersal systems that will allow water to return to the soil . E. Land Use Code Analysis 1. BIMC Chapter 16.16 Noise Regulations The proposal is subject to noise regulations related to the construction hours and maximum environmental noise levels from the proposed uses on the property. Since the construction for this proposal will occur within 100 feet of residentially zoned properties, construction activities are limited to certain hours and days of the week in accordance with BIMC 16.16.025. The maximum allowed environmental noise levels are those allowed by state law. 2. BIMC Chapter 18.06.0020C The purpose of the R-1 zone is to provide residential neighborhoods in an environment with special island character consistent with other land uses such as agriculture and forestry, and the preservation of natural systems and open space. The proposed reconstructed fire station is consistent with the purpose of this district as it is an essential public facility that directly serves the residential neighborhoods of the island in addition to the commercial zones. The subject property is well suited for a fire station as it only has residential uses on two sides and the closest neighbor, which is to the east of the station has maintained a 40 buffer of existing trees and vegetation between their house and the fire station. The fire station will be providing a 15-foot full screen buffer along their neighboring property line. 3. BIMC Chapter 18.09.020 Permitted Use Table The permitted use table lists the multiple uses that are that are permitted and conditionally permitted within the R-1 zone. Included in those allowed by a conditional use permit are governmental facilities. 4. BIMC Chapter 18.12 Dimensional Standards The proposed development is within the R-1 zone, therefore the maximum lot coverage for is 15 percent. The proposed lot coverage for this development is approximately 10.7 percent overall (approximately 14,314 square feet of building footprint). The setback from the Bucklin Hill Road right-of-way is a minimum of 25 feet in order to provide the required landscape buffer and front yard setback. The proposed building is setback approximately 95 feet from Bucklin Hill Road. The required side setbacks are 5’ Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 8 minimum, however the perimeter buffers are larger. The north and east property line has a minimum buffer or 15 feet with an average of 25 and the buffer along the west property line the buffer is a minimum of 10 feet with an average of 20-feet. The building height limitations for the R-1 zone is 30 feet to the mid-point of the highest gable. The tallest portion of the proposed building has a height of 24 feet. 5. BIMC Chapter 18.15 Development Standards and Guidelines a. 18.15.010 Landscaping and Screening Since the proposal is located within the R-1 zone, the project has a required 25-foot average perimeter full-screen landscape buffer along the single-family use to the north east and a 20-foot average perimeter full-screen landscape buffer to the American Legion property to the west. The development is also required to provide a 25-foot partial screen buffer to the Bucklin Hill Road right-of-way. The proposed development is providing the full 25 foot full-screen landscape buffer to the residential property along the north property line and is providing an averaged 25-foot full landscape buffer along the east property line. The proposal also includes a 20-foot averaged buffer along the west property line to accommodate fire apparatus access driveway. The proposal will also provide a landscape buffer along Bucklin Hill Road with the exception of the entrance driveway. The parking lot landscaping requirement for the proposed development entails providing one tree for every two parking stalls for the parking lot located in front of the building and one tree for every 4 for the parking lots located to the side or rear of the building. The project has a 6 parking stalls out front and 13 stalls behind; therefore 7 parking lot related trees will need to be planted. The applicant has proposed planting 8 new trees around the parking lot and building outside of the required buffers, which is in excess of the minimum required for the parking lot landscaping, the required buffers and the tree unit requirements. Also as required the landscaping plan properly designates landscape areas at the end of the parking stalls and aisles (Attachment P & Q). The total site tree requirements for non-residential development within the R-1 zone is 40 tree units per acre. Each existing tree that is being preserved is given a tree unit value based on its size, then all proposed trees to be planted are also given a tree unit value. The property is 2.18 acres outside the required buffers; therefore, a total of 87.2 tree units would typically be required outside of the significant trees being preserved within required perimeter buffers or the roadside buffers. The proposal is retaining 193.2 tree units (note: only 87.2 units are required retention tree units) and is proposing to plant 100 trees. While some of the replanted trees are required for the buffers and the parking lot tree planting requirements, the proposed retained trees in addition to the planted trees exceed the minimum tree unit requirements. As conditioned, all landscaping and buffers need to be maintained throughout the life of the project and the proposed landscaping must be installed or an assurance device provided prior to any occupancy of the buildings (Condition 15). Retained trees within buffers and those needed to be retained to me the tree unit requirements require protection during construction. The applicant has proposed tree Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 9 protection strategies in compliance with the municipal code requirements including but not limited to construction fencing, dripline protection, soil amendment, and root pruning (Attachment Y). In addition, the City required and the applicant provided a Certified Arborist analysis of any tree proposed to be retained whose dripline/critical root zone would be affected by the construction. Her review, analysis and recommendations are included in Attachment Z. b. 18.15.020 Parking and Loading The proposed building is proposed as a fire station facility; therefore, the parking regulations require enough spaces to meet the peak demand as verified by the Director. As proposed, there are 19 parking spaces proposed, which meets the peak parking demand forecasted by the Bainbridge Island Fire Department, 8 spaces. While the Director recognizes the benefit of additional spaces, only the Planning Commission may approve parking spaces above the required spaces, which is the peak demand in this special case (Attachment AA). The Planning Commission reviewed this proposal and approved the additional spaces at their meeting on October 27, 2016. While recommended by this section of code the locations of the parking in front of the building is discouraged, the parking spaces in front of the building will be primarily for the public while the parking to the side and rear will be primarily reserved for fire fighters. As conditioned, each parking stall is to meet the dimensional standards of Table 18.15.020-3 outside of required driving aisles or minimum sidewalk widths (Conditions 10). c. 18.15.030 Mobility and access In order to define the circulation system and pedestrian separation, raised curbs shall be used to separate landscaping and raised walkways from parking stalls and drive aisles (Condition 17). In accordance with the regulations regarding mobility and access, all internal walkways shall be surfaced with nonskid hard surfaces and provide at least five feet of unobstructed width (Condition 11). One bicycle space is required for every five parking spaces, therefore, four bicycle spaces are required for the proposed station. The site plan properly designates 4 available spaces that will serve both employees and the public (Condition 12). d. 18.15.040 Outdoor Lighting In order to preserve and enhance the view of the dark sky and promote health, safety and security, outdoor lighting is to be shielded and maintained so there is no light trespass. All lighting shall be downcast and shielded such that it masks the horizontal surface of the light source. At the time of building permit submittal, detailed lighting plans demonstrating compliance with the lighting standards shall be submitted for review and approval by the City (Condition 3). 6. BIMC Chapter 18.18 Design Guidelines The proposed project is subject to; the commercial and mixed-use design guidelines for all zoning districts. The application was first reviewed by the Design Review Board on December 21, 2015 during the pre-application conference phase of review. The Design Review Board made several suggestions during that meeting and the applicant responded Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 10 by making several modifications to the design including but not limited to addressing the proposed entrance and front façade of the building (Attachment U). The Design Review Board (DRB) again reviewed the proposal after the applicant had submitted the formal Site Plan and Design Review Application on February 22, 2016. The Board reviewed the design line checklist and found the design compliant with the guidelines but wanted to see the landscaping plans at the meeting on March 7, 2016. (Attachment V). At the March 7, 2016 meeting the landscape architect for the project presented the landscape plan and the DRB finalized their recommendation for approval of the station as designed (Attachment W ). 7. BIMC Chapter 2.16.040 Site Plans and Design Review The Bainbridge Island Fire Station 22 was properly submitted as a major site plan and design review application along with a major conditional use permit. Since this is a major conditional use permit and site plan and design review application, the applicant first applied for a pre-application conference and had the preliminary plans reviewed by the Design Review Board. The applicants met with the Design Review Board once during the pre-application phase of the project, on December 21, 2015. The application was also required to have a Public Participation Meeting, which was held January 11, 2016. The DRB reviewed the application again as part of their formal submittal on February 22, 2016 (Attachment V). On October 27, 2016, the Planning Commission reviewed the project and recommended approval of the application with the conditions listed in this project report. As a Major Site Plan and Design Review, the application is properly before the Hearing Examiner for review and decision in a public hearing. Decision Criteria. The Director and Planning Commission have based their respective recommendations on the site plan and design review application on the following criteria: a. The site plan and design is in conformance with applicable code provisions and development standards of the applicable zoning district; As summarized in this staff report and in the materials prepared by the applicant, the application, with conditions, is in conformance with the Bainbridge Island Municipal Code. b. The locations of the buildings and structures, open spaces, landscaping, pedestrian, bicycle and vehicular circulation systems are adequate, safe, efficient and in conformance with the non-motorized transportation plan; The proposed site plan provides a building layout, parking and circulation system that are an efficient use of the available land while providing the required setbacks and screening from the adjacent properties and open spaces. c. The Kitsap County Health District has determined that the site plan and design meets the following decision criteria: e. The proposal conforms to current standards regarding domestic water supply and sewage disposal; or if the proposal is not to be served by public sewers, then the lot has sufficient area and soil, topographic and drainage characteristics to permit an on-site sewage disposal system. The Health District reviewed the project and had no comment. Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 11 i. If the Health District recommends approval the application with respect to those items in subsection i., the health district shall so advise the director. No comment. ii. If the health district recommends disapproval of the application, it shall provide a written explanation to the director. The Health District has not denied the application. d. The city engineer has determined that the site plan and design meets the following decision criteria: i. The site plan and design conforms to regulations concerning drainage in Chapters 15.20 and 15.21 BIMC; and ii. The site plan and design will not cause an undue burden on the drainage basin or water quality and will not unreasonably interfere with the use and enjoyment of properties downstream; and iii. The streets and pedestrian ways as proposed align with and are otherwise coordinated with streets serving adjacent properties; and iv. The streets and pedestrian ways as proposed are adequate to accommodate anticipated traffic; and v. If the site will rely on public water or sewer services, there is capacity in the water or sewer system (as applicable) to serve the site, and the applicable service(s) can be made available at the site; and vi. The site plan and design conforms to the “City of Bainbridge Island Engineering Design and Development Standards Manual,” unless the city engineer has approved a variation to the road standards in that document based on his or her determination that the variation meets the purposes of BIMC Title 18. The Development Engineer has reviewed the submitted civil plans and has found them to be consistent with these requirements. A detailed response and analysis is contained in her memo (Attachment T). e. The site plan and design is consistent with all applicable design guidelines in BIMC Title 18, unless strict adherence to a guideline has been modified as a housing design demonstration project pursuant to BIMC 2.16.020.Q; The proposed development was reviewed by the Design Review Board during the pre-application stage of the development and during the Site Plan and Design Review process (Attachments U,V & W). The applicant has incorporated the applicable Design Review Board’s recommendations into the final design of the buildings and layout of the site. As now proposed, the design of the building form, wall articulation, roof form, landscaping and overall layout is consistent with the intent of the applicable design guidelines. Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 12 f. No harmful or unhealthful conditions are likely to result from the proposed site plan; The proposed development is for a use conditionally allowed by the Municipal Code within the R-1 zoning district. g. The site plan and design is in conformance with the Comprehensive Plan and other applicable adopted community plans; The proposed plan provides for the replacement of an essential public facility. h. Any property subject to site plan and design review that contains a critical area or buffer, as defined in Chapter 16.20 BIMC, conforms to all requirements of that chapter; No critical areas are identified on the subject property. i. Any property subject to site plan and design review that is within shoreline jurisdiction, as defined in Chapter 16.12 BIMC, conforms to all requirements of that chapter; The subject property is not within the shoreline jurisdiction. j. If the applicant is providing privately owned open space and is requesting credit against dedications for park and recreation facilities required by BIMC 17.20.020.C, the requirements of BIMC 17.20.020.D have been met; The requirements of BIMC 17.20.020 are not applicable to this application because the proposal contains no new dwelling units. k. The site plan and design has been prepared consistent with the purpose of the site design review process and open space goals; The proposed site plan was prepared consistent with the overall purpose and goals of the Site Plan and Design Review process. The process has provided a means for guiding the development in a logical, safe, attractive and expedient manner. l. For applications in the B/I zoning district, the site plan and development proposal include means to integrate and re-use on-site storm water as site amenities. The subject property is not located within the B/I zoning district. 2. BIMC Chapter 2.16.110 Major Conditional Use Permit The applicants have also properly applied for a major Conditional Use Permit to allow a fire station within the residential R-1 zoning district. Fire Stations are considered government facilities; therefore, they are required to be reviewed under the major Conditional Use Permit process. Since this Conditional Use Permit is part of a consolidated project review with the Site Plan and Design Review application, it was also subject to a pre-application conference, public participation meeting and Design Review Board recommendation. The Planning Commission recommended approval of the project at their October 27, 2016 meeting. The project is properly before the Hearing Examiner for a public hearing and decision. Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 13 Decision Criteria A conditional use may be approved or approved with conditions if: The conditional use is harmonious and compatible in design, character and appearance with the intended character and quality of development in the vicinity of the subject property and with the physical characteristics of the subject property; provided, that in the case of a housing design demonstration project any differences in design, character or appearance that are in furtherance of the purpose and decision criteria of BIMC 2.16.020.Q. shall not result in denial of a Conditional Use Permit for the project; The proposed development is for the renovation/redevelopment of an existing fire station, which is an essential public facility. While a couple of the surrounding uses are single-family residences, the fire station has been in existence and operation for many years. No public comment or concerns were raised during the public comment period. The other adjacent developments are the American Legion Hall and a private school across Bucklin Hill Road. a. The conditional use will be served by adequate public facilities including roads, water, fire protection, sewage disposal facilities and storm drainage facilities; As discussed in this staff report, with conditions, the proposed conditional use is adequately served by public roads, water, sewer, fire protection and proper storm drainage facilities will be constructed. b. The conditional use will not be materially detrimental to uses or property in the vicinity of the subject property; Allowing the reconstruction/expansion of the fire station will not be materially detrimental to uses in the vicinity. The use will continue with little change from the way it has operated for many years. Proper access, parking, circulation, landscaping are being provided. c. The conditional use is in accord with the Comprehensive Plan and other applicable adopted community plans, including the Non-Motorized Transportation Plan; As discussed in Section II. C of this report, the proposed conditional use is consistent with the goals and policies of the Comprehensive Plan. d. The conditional use complies with all other provisions of the BIMC, unless a provision has been modified as a housing design demonstration project pursuant to BIMC 2.16.020.Q; As detailed in this staff report, the conditional use complies, as does the building covered by the Site Plan Review, with all provisions of the BIMC. e. All necessary measures have been taken to eliminate or reduce to the greatest extent possible the impacts that the proposed use may have on the immediate vicinity of the subject property; f. Noise levels shall be in compliance with BIMC 16.16.020 and 16.16.040.A; While the project is required by law to be in compliance with BIMC 16.16.020, under emergency situations, it is likely that the noise standards will be exceeded by ambulances or fire trucks leaving the facility. g. The vehicular, pedestrian, and bicycle circulation meets all applicable city standards, unless the city engineer has modified the requirements of BIMC 18.15.020.B.4 and B.5, allows alternate driveway and parking area surfaces, and confirmed that those surfaces meet city requirements for handling surface water and pollutants in accordance with Chapters 15.20 and 15.21 BIMC; The Site Plan Review application and the Conditional Use Permit application have been reviewed by the city’s development engineer and Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 14 as conditioned the vehicular, pedestrian, and bicycle circulation meets all applicable City standards and pollution controls. A detailed analysis prepared by the Development Engineer was provided to staff in memo (Attachment T). Pedestrian improvements are being required along Bucklin Hill Road, by the City requiring the sidewalk and bike lane improvements (Condition 22). h. The city engineer has determined that the conditional use meets the following decision criteria: i. The conditional use conforms to regulations concerning drainage in Chapters 15.20 and 15.21 BIMC; and ii. The conditional use will not cause an undue burden on the drainage basin or water quality and will not unreasonably interfere with the use and enjoyment of properties downstream; and iii. The streets and pedestrian ways as proposed align with and are otherwise coordinated with streets serving adjacent properties; and iv. The streets and pedestrian ways as proposed are adequate to accommodate anticipated traffic; and v. If the conditional use will rely on public water or sewer services, there is capacity in the water or sewer system (as applicable) to serve the conditional use, and the applicable service(s) can be made available at the site; and vi. The conditional use conforms to the “City of Bainbridge Island Engineering Design and Development Standards Manual,” unless the city engineer has approved a variation to the road standards in that document based on his or her determination that the variation meets the purposes of BIMC Title 17. The city’s Development Engineer has reviewed the Conditional Use Permit and Site Plan and Design Review application for consistency with each of the above criteria and has found the design and specifications to be consistent and in compliance with the above criteria or has recommended proper conditions to address the concerns (Attachment T). i. If a major conditional use is processed as a housing design demonstration project pursuant to BIMC 2.16.020.Q, the above criteria will be considered in conjunction with the purpose, goals, policies, and decision criteria of BIMC 2.16.020.Q. The proposal is not a housing design demonstration project. j. Additional Decision Criteria for Institutions in Residential Zones. Applications to locate any of those uses categorized as educational facilities, governmental facilities, religious facilities, health care facilities, cultural facilities, or clubs in Table 18.09.020 in residential zones shall be processed as major conditional use permits and shall be required to meet the following criteria, in addition to those in subsection D of this section: 1. All sites must front on roads classified as residential suburban, collector, or arterial on the Bainbridge Island functional road classification map. The subject property is fronting on Bucklin Hill Road which is a collector road. 2. If the traffic study shows an impact on the level of service, those impacts have been mitigated as required by the city engineer. The submitted trip generation data did not show a change to the level of service requiring mitigation. The project is increasing the PM peak hour trips by three trips and increasing trips overall by less than 33, therefore a traffic study was not required. Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 15 3. If the application is located outside of Winslow study area, the project shall provide vegetated perimeter buffers in compliance with BIMC 18.15.010. The proposal is within the Winslow study area, but will still be providing buffers in accordance with 18.15.010. 4. The proposal meets the requirements of the commercial/mixed use design guidelines in BIMC 18.18.030.C. The proposal is consistent with the commercial/mixed use design guidelines as far as they were applicable. The DRB reviewed the project and has provided a recommendation of approval (Attachments U, V & W). 5. The scale of proposed construction including bulk and height and architectural design features is compatible with the immediately surrounding area. As a fire station, the construction has unique architectural style, however it will be compatible with the immediate surrounding properties which include the American Legion Hall and a private school (Hyla). 6. If the facility will have attendees and employees numbering fewer than 50 or an assembly seating area of less than 50, the director may waive any or all the above requirements in this subsection E, but may not waive those required elsewhere in the BIMC. No requirements were waived. 7. Lot coverage does not exceed 50 percent of the allowable lot coverage in the zone in which the institution is located, except that existing public schools and governmental facilities, as defined in BIMC Title 18, shall be allowed 100 percent of the lot coverage established in the underlying zoning district in which it is located unless conditions are required to limit the lot coverage to mitigate impacts of the use. This construction is replacing an existing governmental facility therefore it is allowed 100 percent of the underlying lot coverage. The proposal is to use only 10.7% lot coverage when 15% would be allowed. 8. BIMC Chapter 2.16.170 Consolidated Project Review When an applicant has two or more land use applications, they may request that the applications be processed under a single consolidated project review process. The proposed project requires both Site Plan and Design Review in addition to a Conditional Use Permit. The two applications are being reviewed under the consolidated project review provisions. F. Environmental Review: A SEPA Mitigated Determination of Nonsignificance was issued by the SEPA Official on October 11, 2016. III. CONCLUSIONS Staff’s Conclusion 2. As conditioned, the proposed project is consistent with the Comprehensive Plan, the applicable sections of the Bainbridge Island Municipal Code including: BIMC Chapter 16.16 Noise Regulations; BIMC Chapter 18.06.0020C R-1 Zone; BIMC 18.09.020 Permitted Use Table; 18.12 Dimensional Standards; BIMC 18.15.010 Landscaping and Screening; BIMC 18.15.020 Parking and loading; BIMC 18.15.030 Mobility and access; BIMC 18.15.040 Outdoor Lighting; and BIMC 18.18 Design Guidelines; BIMC 2.16.040 Site Plans and Design Review; and BIMC Chapter 2.16.170 Consolidated Project review. Appropriate notice of application was made, and a SEPA Bainbridge Island Fire Station 22 CUP/SPR October 28, 2016 page 16 Mitigated Determination of Non-significance was issued. The application was properly reviewed by the Planning Commission on October 27, 2016. Under the consolidated review procedures both the site plan review and the conditional use permit are properly before the Hearing Examiner for decision. IV. Attachments: (Note-See October 19th Staff Report to Planning Commission for Attachments) A. Public Participation Meeting Summary and comment matrix B. Site Plan and Design Review Application, Revised March 4, 2016 C. Conditional Use Permit Application, Revised March 4, 2016 D. Vicinity Map/Aerial Photo of Site E. Project Summary/Introduction/Description of Proposal by Architect F. Existing Site Conditions Map G. Site Plan Map H. Floor Plan I. Color Elevation Renderings J. Elevation Drawings K. Building Section L. Illustrative Landscaping Plan M. Tree Retention Analysis N. Tree Retention Plan O. Plant Schedule P. Planting Plan (South) Q. Planting Plan (North) R. Landscape Buffer Diagram S. Trip Generation Letter T. Development Engineer Project Review Memo U. Design Review Board Minutes, December 21, 2015 V. Design Review Board Minutes, February 22, 2016 W. Design Review Board Minutes, March 7, 2016 X. Bainbridge Island Fire Department Memo/Recommendation Y. Landscape Plan Supplemental Information Z. Arborist Analysis of trees potential impacts by development AA. Letter from Mackenzie regarding parking demand