ORD NO. 2018-36 2019-2024 PROPOSED BUDGET - CIPCity of Bainbridge Island, Washington
The Capital Improvement Plan (CIP) represents an important element in the City’s long-range and strategic
planning. The CIP is a multi-year planning tool used to identify needed capital projects for preservation and
improvements to the City’s owned and operated infrastructure and to coordinate the financing and timing
of these improvements. The CIP document is a roadmap for the next six years, and is strategically
implemented to address the City’s six key priorities; safe city, green well-planned community, reliable
infrastructure and connected mobility, healthy and attractive community, vibrant economy, and good
governance.
Capital projects at the City have a construction or acquisition cost equal to or greater than $50,000 and an
estimated useful life of one year or greater. Projects and assets that do not meet these requirements are
operating expenses and included in the operating budget. Major repairs will be capitalized only if they
increase the value, extend the useful life beyond the original estimate, or increase the capacity, capability or
efficiency of the existing capital asset.
The 2019-2020 CIP in comparison to more recent plans has an emphasis on Facilities, stormwater, and
water utility projects and fewer new projects in the transportation and non-motorized sections. The non-
motorized projects related to the S.A.F.E. Bainbridge Mobility Levy are not included in the capital
improvement plan at this time, pending the results of the November general election. If the ballot initiative
passes this fall, projects will be evaluated by a citizen committee and staff for inclusion in the levy project
portfolio. The acquisition of land and building for the new Police and Municipal Court is planned in 2018
and the renovation is planned in 2019-2020.
Fiscal year 2019 and 2020 capital improvements are incorporated into the 2019 – 2020 Biennial Budget.
The following pages organize each project by project type, such as: transportation, non-motorized, fleet &
capital equipment, facilities, water, sewer or stormwater. In addition to the summary “Level Zero”, for each
section, a “Level One” sheet lists the projects, estimated costs, and whether or not the project has potential
grant funding. For capital projects that have spending authority this biennium, there is an additional “Level
Two” sheet describing the project, its benefits, estimated schedule, funding sources and uses, and, where
appropriate, estimates the on-going annual impact on the operating budget.
City of Bainbridge Island, Washington
Capital Equipment
10%
Facilities
58%
Non Motorized
1%
Sewer
5%
SSWM
10%
Transportation
5%
Water
11%
City of Bainbridge Island
Total CIP (2019 - 2024)
2019-2020 Proposed Budget
Pr
i
o
r
Y
e
a
r
s
2019 2020 2021 2022 2023 2024
2025 -
2038 Total
in (1000s)
Transportation Projects 3,880 100 820 25 300 550 500 - 6,175
Transportation Grants 2,671 - 703 - - - - - 3,374
Non Motorized Projects 2,860 30 240 860 2,550 - 500 - 7,040
Non Motorized Grants 2,036 9 150 210 1,900 - - - 4,305
Fleet and Equipment - 995 832 627 380 1,464 759 - 5,057
General Gov't Funded - 574 688 567 341 384 353 - 2,907
Utility Funded - 421 144 60 39 1,080 406 - 2,150
Facility Projects 10,190 5,172 5,450 - - - - - 20,812
Facility Grants - - - - - - - - -
Water Projects 725 1,250 750 75 2,600 790 1,930 - 8,120
Water Grants - - - - - - - - -
Sewer Projects 1,250 900 100 3,050 600 750 1,400 - 8,050
Sewer Grants - - - - - - - - -
SSWM Projects 260 1,000 760 450 600 650 - - 3,720
SSWM Grants - - - - 450 - - - 450
Utility Funding 2,235 3,571 1,754 3,635 3,389 3,270 3,736 - 21,590
General Govt Funding 12,223 5,867 6,345 1,242 1,291 934 1,353 - 29,255
Total Project Cost Less Grants 14,458 9,438 8,099 4,877 4,680 4,204 5,089 - 50,845 Grant Totals 4,707 9 853 210 2,350 - - - 8,129
TOTAL PROJECT COST . . . . . . . . . . . . . . . . . . . .19,165 9,447 8,952 5,087 7,030 4,204 5,089 - 58,974
Amounts in thousands
City of Bainbridge Island
Transportation CIP (2019- 2024)
2019-2020 Proposed Budget
Project / Location Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Gr
a
n
t
F
u
n
d
s
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
o
n
e
n
t
Wt
r
C
o
m
p
o
n
e
n
t
Sw
r
C
o
m
p
o
n
e
n
t
SS
W
M
C
o
m
p
Pr
i
o
r
Y
e
a
r
s
2019 2020 2021 2022 2023 2024
2025 -
2038 Total
TRANSPORTATION PROJECTS - 6-YEAR CIP
Wyatt Way
Reconstruction Phase 1 X X
2,516 Y Y 3,700 - - - - - - - 3,700
Madison - Lovell
Sportsman Club/New
Brooklyn X X
858 Y 180 100 820 - - - - - 1,100
Intersection Imprv.
Country Club Rd
Reconstruction & Drainage
Improvements
- Y - - - 25 250 - - - 275
Past Toe Jam to
Seawall
Manitou Beach Road
Stabilization (Phase 1)
- Y - - - - 50 500 - - 550
Murden Cove to Falk
Manitou Beach Road
Stabilization (Phase 2)
- Y - - - - - 50 500 - 550
Falk to Skiff
City Funding 1,209 100 117 25 300 550 500 - 2,801
Grant Totals 2,671 - 703 - - - - - 3,374
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3,880 100 820 25 300 550 500 - 6,175
Amounts in thousands
Project: Wyatt Way Reconstruction Phase 1 Number:00708
Location: Madison to Lovell
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $1,184 $0 $0 $0 $0 $0 $0 $0 $1,184
Water Fund $150 $0 $0 $0 $0 $0 $0 $0 $150
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $2,516 $0 $0 $0 $0 $0 $0 $0 $2,516
Sub-total $3,850 $0 $0 $0 $0 $0 $0 $0 $3,850
FUNDING USES (1000's)
Design/permitting $3,850 $0
Construction $0
Sub-total $3,850 $0 $0 $0 $0 $0 $0 $0 $3,850
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Sub-total $24 $0 $0 $0 $0 $0 $0 $0 $24
Description: Capacity (level of service) improvements to the intersection of Madison Avenue and Wyatt Way, including a
roundabout. Complete sidewalk and bicycle facilities on both sides of Wyatt from Madison to Lovell. Reconstruct roadway
surfacing and drainage. Additional right of way needed along frontage. Design 50% completed in 2006. State (TIB) grant funding
received in 2015.
Benefit: Relieve current and future intersection congestion and ensure mobility by implementing improvements prior to
development. Address a gap in non-motorized facilities to improve mobility and safety. Support businesses and employment in the
downtown area.
Schedule: YR1/2: design, ROW, and permitting, YR3: construction.
Project: Sportsman Club Road and New Brooklyn Road Number:00715
Location: Intersection Improvements
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Trans. Impact Fees $25 $100 $117 $0 $0 $0 $0 $0 $242
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $155 $0 $703 $0 $0 $0 $0 $0 $858
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $180 $100 $820 $0 $0 $0 $0 $0 $1,100
FUNDING USES (1000's)
Design/permitting $180 $100 $280
Construction $820 $820
Sub-total $180 $100 $820 $0 $0 $0 $0 $0 $1,100
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: Capacity (level of service) improvements at intersection of Sportsman Club Road and New Brooklyn Road. Level of
service C from 2004 study. Since that time, the Sakai and Woodward schools have changed schedules, resulting in impacts to the
intersection. A roundabout is proposed. Estimated schedule and costs assume a right-of-way donation by the School District.
Benefit: Relieve current and future congestion.
Schedule: YR1: design and permitting, YR2: construction.
City of Bainbridge Island
Non-Motorized Transportation CIP (2019- 2024)
2019-2020 Proposed Budget
Project Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Gr
a
n
t
F
u
n
d
s
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
Wt
r
C
o
m
p
Sw
r
C
o
m
p
SS
W
M
C
o
m
p
Pr
i
o
r
Y
e
a
r
s
2019 2020 2021 2022 2023 2024
2025 -
2038 Total
NON-MOTORIZED PROJECTS - 6-YEAR CIP
SR305/Olympic Drive
Non Motorized
X X 2,036 Y Y 2,813 - - - - - - - 2,813
Harbor Dr. to Winslow Way
High School Road Safety
Improvements
X 159 - 30 150 - - - - - 180
SR305 to Grow
Madison Avenue Sidewalk
Improvements
X 1,410 Y - - - 260 1,750 - - - 2,010
Wyatt to High School
C40 - Bucklin Ph 2 X - Y 47 - - 600 - - - - 647
Blakely - Fletcher Bay
C40 - Eagle Harbor -
Phase 1
X - Y Y - - 90 - - - 500 - 590
Wyatt - Past Bucklin
C40 - Eagle Harbor -
Phase 2
X 700 - - - - 800 - - - 800
Past Bucklin to Eagle
City Project Funding 824 21 90 650 650 - 500 - 2,735
Grant Totals 2,036 9 150 210 1,900 - - - 4,305
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2,860 30 240 860 2,550 - 500 - 7,040
………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………….
Manitou Beach Rd Impr.Manitou Beach Rd TBD
Crosswalk to STO Crossing SR305 at Vineyard Lane TBD
Sidewalk Extension Pt. White Dr. Schel Chelb Park to Lynwood. Ctr TBD
Intersection
Improvements
SR305 at High School Rd TBD
Miller Road
Improvements
Crosswalk and other safety improvements TBD
Amounts in thousands
Project: SR305 - Olympic Drive Non-Motorized Improvements Number:00596
Location: Harbor Drive to Winslow Way
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $777 $0 $0 $0 $0 $0 $0 $0 $777
Water Fund $175 $0 $0 $0 $0 $0 $0 $0 $175
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $872 $0 $0 $0 $0 $0 $0 $0 $872
State Grant $1,164 $0 $0 $0 $0 $0 $0 $0 $1,164
Sub-total $2,988 $0 $0 $0 $0 $0 $0 $0 $2,988
FUNDING USES (1000's)
Design/permitting $120
Construction $2,868
Sub-total $2,988 $0 $0 $0 $0 $0 $0 $0 $2,988
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Sub-Total $16 $0 $0 $0 $0 $0 $0 $0 $16
Description: The Olympic Drive/Winslow Way intersection serves the ferry on and off-loading traffic. This project provides
improvements for pedestrians and cyclists along this heavily-trafficked roadway. The unique needs of multi-modal transportation
within a limited intersection area have led to a complex project planned and approved by WSDOT and FHWA. The project will
also replace an existing undersized water main in Olympic Drive and Harborview Drive with a new 8-inch line and install one new
fire hydrant.
Benefit: Non-motorized level of service improvement, safety enhancements.
Schedule: Phase 1 Design started in 2013, additional grant funding received in 2018, construction planned to begin in winter 2018-
2019.
Project: High School Road Safety Improvements Number:
Location: SR305 to Grow
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $21 $0 $0 $0 $0 $0 $0 $21
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $9 $150 $0 $0 $0 $0 $0 $159
Sub-total $0 $30 $150 $0 $0 $0 $0 $0 $180
FUNDING USES (1000's)
Design/permitting
Construction $30 $150
Sub-total $0 $30 $150 $0 $0 $0 $0 $0 $180
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $1
INSERT PICTURES HERE
Description: Improve pedestrian safety by installing mid-block cosswalk improvements on High School Road near Hildebrand and
Grow. Modify parking on High School Road near Hildebrand crossing to reduce conflicts with non-motorized users. Install speed
reader sign near Ordway Elementary on Madison Ave.
Benefit: Increase pedestrian and other non-motorized safety.
Schedule: Design in 2019, construction in 2020.
Project: C40 Eagle Harbor Drive Phase 1 Number:
Location: Wyatt to past Bucklin Hill
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $90 $0 $0 $0 $500 $0 $590
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $100 $0 $0 $500 $0 $0 $600
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $0 $190 $0 $0 $500 $500 $0 $1,190
FUNDING USES (1000's)
Design/permitting $190 $190
Construction $500 $500 $0 $1,000
Sub-total $0 $0 $190 $0 $0 $500 $500 $0 $1,190
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Sub-total $0 $0 $2 $0 $0 $0 $10 $0 $12
Description: Current level of service E for Pedestrians and D for cyclists. Provides shoulder widening on both sides. Necessitates
upgrading Cooper Creek Culvert to accommodate road widening. Involves ROW acquisition. Assumes additional land will be
needed to mitigate displaced wetlands. It is desirable to improve curb radius at bottom of Wyatt.
Benefit: Safety and Non Motorized Transportation Connectivity.
Schedule: YRI: preliminary design, ROW, YR2: ROW, YR3/4: ROW, permitting, design, YR5: construction.
Project: C40 Bucklin Hill Road Phase 2 Number:00723
Location: Blakely to Fletcher
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $47 $0 $0 $600 $0 $0 $0 $0 $647
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $47 $0 $0 $600 $0 $0 $0 $0 $647
FUNDING USES (1000's)
Design/permitting $47 $47
Construction $600 $600
Sub-total $47 $0 $0 $600 $0 $0 $0 $0 $647
Estimated Impact on Future Operating Budget
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
2% Contribution to Public Art Account
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Sub-total $1 $0 $0 $12 $0 $0 $0 $0 $13
Description: Provide shoulder widening on both sides of Bucklin Hill Road and Lynwood Center Road from Blakely Avenue to
Fletcher Bay Road. The project is planned to be designed by COBI staff with the support of a consultant for right-of-way
acquisition.
Benefit: Safety and non-motorized transportation connectivity.
Schedule: YR1: design to 30% and begin ROW acquisition, YR2/3: completion of right of way acquisition, permitting, and design,
YR4: construction.
City of Bainbridge Island
FLEET and EQUIPMENT CIP (2019 - 2024)
2019-2020 Proposed Budget
Project Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
o
n
e
n
t
Wt
r
C
o
m
p
o
n
e
n
t
Sw
r
C
o
m
p
o
n
e
n
t
SS
W
M
C
o
m
p
2019 2020 2021 2022 2023 2024 Total
FLEET & EQUIPMENT - 6-YEAR CIP (1000s)
Police Vehicles (3)1,341 198 208 219 230 237 249 1,341
- - - - - - Broom Sweeper 96 96 - - - - - 96
Chipper 95 95 - - - - - 95
Van 49 12 61 - - - - - 61
PUP Trailer 13 13 26 - - - - - 26
Dump Truck Cab/Chassis 138 138 276 - - - - - 276
Light Duty Pick Up 11 11 11 11 11 55 - - - - - 55
SUV 12 23 23 58 - - - - - 58
Slope Mower and Trailer 60 60 - - - - - 60
Video Inspection Camera 35 35 70 - - - - - 70
- Heavy Duty Pickup 19 76 - 95 - - - - 95
Van 14 56 - 70 - - - - 70
Medium Duty Pickup Truck 59 15 - 74 - - - - 74
Light Duty Pick Up 60 - 60 - - - - 60
Manlift 325 - 325 - - - - 325
- Track Excavator 160 - - 160 - - - 160
Medium Duty Pickup 66 - - 66 - - - 66
Medium Duty Pickup 20 20 20 20 20 - - 100 - - - 100
Police Motorcycle 41 - - 41 - - - 41
Police Motorcycle 41 - - 41 - - - 41
- Light Duty Pickup 13 13 13 13 13 - - - 65 - - 65
Light Duty Pickup 65 - - - 65 - - 65
Police Boat Trailer 20 - - - 20 - - 20
- Vactor Truck 460 460 - - - - 920 - 920
Heavy Duty Pickup 59 59 - - - - 118 - 118
Heavy Duty Pickup 24 95 - - - - 119 - 119
Light Duty Pickup 14 14 14 14 14 - - - - 70 - 70
- Light Duty Pickup 14 14 14 14 14 - - - - - 70 70
Light Duty Pickup 70 - - - - - 70 70
Van 92 23 - - - - - 115 115
Police Boat 95 - - - - - 95 95
Loader 160 - - - - - 160 160
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .995 832 627 380 1,464 759 5,057
Amounts in thousands
City of Bainbridge Island
Facilities CIP (2019 - 2024)
2019-2020 Proposed Budget
Project Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Gr
a
n
t
F
u
n
d
s
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
o
n
e
n
t
Wt
r
C
o
m
p
o
n
e
n
t
Sw
r
C
o
m
p
o
n
e
n
t
SS
W
M
C
o
m
p
Prior
Years 2019 2020 2021 2022 2023 2024
2025 -
2038 Total
FACILITIES PROJECTS - 6-YEAR CIP
City Dock
Modifications
- Y - 50 100 - - - - - 150
Waterfront Park
Police and Municipal
Court Building
- Y 10,000 5,000 5,000 - - - - - 20,000
Police
Station/Court
-
AM Radio x x - Y 100 50 - - - - - - 150
EOC -
City Hall Renovations - Y - - 350 - - - - - 350
City Hall
Downtown Parking
Facility
- Y - TBD TBD - - - - - -
Winslow
Fueling System
Design/Upgrade
Y 90 - - - - - - - 90
Public Works
Facility
Open Water Marina
Additional Buoys
Y - 72 - - - - - - 72
Marina
City Total 10,190 5,172 5,450 - - - - - 20,812
Grant Totals - - - - - - - - -
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10,190 5,172 5,450 - - - - - 20,812
Amounts in thousands
Project: Fueling System Design/Upgrade Number:00811
Location: Public Works Facility
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $90 $0 $0 $0 $0 $0 $0 $0 $90
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $90 $0 $0 $0 $0 $0 $0 $0 $90
FUNDING USES (1000's)
Design/permitting $20 $0 $0 $0 $0 $0 $0 $0 $20
Construction $70 $0 $0 $0 $0 $0 $0 $0 $70
Sub-total $90 $0 $0 $0 $0 $0 $0 $0 $90
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs 2017 2018 2019 2020 2021 2022
2023-
2034 Total
Operating
Debt Service
Sub-total
Description: Design and construction of capacity improvements to the fuel system at the Public Works facility.
Benefit: Upgrades to system will allow better service to users, including City police and public works. The improvements
will include biodiesel tank installation to better facilitate renewable energy alternatives. Additionally, the system will
increase the City's emergency management reserve, allowing continuing service in emergency situations.
Schedule: Design in 2018, construction in 2019.
Project: AM Radio Number:
Location: EOC, Bucklin Fire Station
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $100 $50 $0 $0 $0 $0 $0 $0 $150
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $100 $50 $0 $0 $0 $0 $0 $0 $150
FUNDING USES (1000's)
Design/permitting $0 $0 $0 $0 $0 $0 $0 $0 $0
Construction $100 $50 $0 $0 $0 $0 $0 $0 $150
Sub-total $100 $50 $0 $0 $0 $0 $0 $0 $150
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total
2% Contribution to Public Art Account (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Sub-total $2 $1 $0 $0 $0 $0 $0 $0 $3
Description: Construct radio antenna foundation and electrical service connection.
Benefit: Installation of an AM radio transmitter at the Fire Station on Bucklin Hill Road will provide for improved communications
throughout the island during emergency preparation response, and recovery operations.
Schedule: Construction in 2019.
Project: City Dock Modifications Number:
Location: Waterfront Park
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $50 $100 $0 $0 $0 $0 $0 $150
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $50 $100 $0 $0 $0 $0 $0 $150
FUNDING USES (1000's)
Design/permitting $0 $50 $0 $0 $0 $0 $0 $0 $50
Construction $0 $0 $100 $0 $0 $0 $0 $0 $100
Sub-total $0 $50 $100 $0 $0 $0 $0 $0 $150
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total
2% Contribution to Public Art Account (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Sub-total $0 $1 $2 $0 $0 $0 $0 $0 $3
Description: This project provides for improvements to the new Waterfront Park City Dock.
Benefit: Maintain utility of public infrastructure associated with the City park. Ensure user safety is maintained. Enhance accessibility
and utility for various user groups.
Schedule: Design in 2019, Construction to begin in 2020.
Project: Police and Municipal Court Facility Number:00724
Location: TBD
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $10,000 $0 $0 $0 $0 $0 $0 $0 $10,000
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Long-Term Debt $0 $5,000 $5,000 $0 $0 $0 $0 $0 $10,000
Sub-total $10,000 $5,000 $5,000 $0 $0 $0 $0 $0 $20,000
FUNDING USES (1000's)
Design/Land Acquisition $10,000 $0 $0 $0 $0 $0 $0 $0 $10,000
Construction $0 $5,000 $5,000 $0 $0 $0 $0 $0 $10,000
Sub-total $10,000 $5,000 $5,000 $0 $0 $0 $0 $0 $20,000
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating $100 $100 $100 $100 $1,400 $1,800
Debt Service $360 $720 $720 $720 $720 $720 $10,080 $14,040
Sub-total $0 $360 $720 $820 $820 $820 $820 $11,480 $15,840
2% Contribution to Public Art Account (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 TBD
Description: This project provides for the replacement of the Police Station and relocation of the Municipal Court.
Benefit: Replacement Police facility will provide adequate space for current and future departmental needs, while correcting
numerous space, structural, and security deficiencies in the current facility. New Court facility will replace existing leased space,
which marginally meets current requirements and will create operational efficiencies by being co-located with the Police Station.
Schedule: Site selection process underway.
Project: City Hall Renovations Number:00807
Location: City Hall
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $350 $0 $0 $0 $0 $0 $350
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $0 $350 $0 $0 $0 $0 $0 $350
FUNDING USES (1000's)
Design/permitting $0 $0 $0 $0 $0 $0 $0 $0 $0
Construction $0 $0 $350 $0 $0 $0 $0 $0 $350
Sub-total $0 $0 $350 $0 $0 $0 $0 $0 $350
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total
2% Contribution to Public Art Account (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Sub-total $0 $0 $7 $0 $0 $0 $0 $0 $7
Description: City Hall was constructed nearly 20 years ago and changes in City personnel and procedures, established patterns of
usage, and general wear and tear have created the need to renovate the potential for renovations to the facility. The renovations
will allow a more efficient use of space for both the public and staff.
Benefit: More efficient use of space, upgrades to building systems and security.
Schedule: Construction in 2020.
Project: Open Water Marina Additional Buoys Number:
Location: Marina
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $72 $0 $0 $0 $0 $0 $0 $72
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $72 $0 $0 $0 $0 $0 $0 $72
FUNDING USES (1000's)
Design/permitting $0 $0 $0 $0 $0 $0 $0 $0 $0
Construction $0 $72 $0 $0 $0 $0 $0 $0 $72
Sub-total $0 $72 $0 $0 $0 $0 $0 $0 $72
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total
2% Contribution to Public Art Account (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Sub-total $0 $1 $0 $0 $0 $0 $0 $0 $1
Description: Install additional mooring buoys in the City's leased area inside Eagle Harbor.
Benefit: The City has an open-water marina in an area of Eagle Harbor that has been served over the years by a number of buoys
and a linear moorage system. The linear moorage system will be removed in 2018 due to deterioration and obsolescence. In order
to accommodate as many boaters as possible in the marina, additional mooring buoys will be installed where the linear moorage
system used to be.
Schedule: Construction in 2019.
City of Bainbridge Island
Water CIP (2019 - 2024)
2019-2020 Proposed Budget
Project Location Gr
a
n
t
E
l
i
g
i
b
l
e
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
Wt
r
C
o
m
p
Sw
r
C
o
m
p
SS
W
M
C
o
m
p
Prior
Years 2019 2020 2021 2022 2023 2024
2025 -
2038 Total
WATER PROJECTS - 6-YEAR CIP (1000s)
SR 305 Olympic Drive
Non-Motorized
Improvements
Olympic Drive Y Y 175 - - - - - - - 175
Rockaway Intertie Rockaway Y 250 - - - - - - - 250
Wyatt Way
Reconstruction Wyatt Way
Y 150 - - - - - - - 150
High Zone
Improvements
High
School/New
Brooklyn
Y 150 - 750 - - - - - 900
Chlorine Generator
Upgrades Various
Y - 250 - - - - - - 250
New Storage Tank New Brooklyn Y - 1,000 - - 2,250 - - - 3,250
Fire Flow Improvements
Winslow
Y - - - 75 350 - - - 425
Well
Development/Rehab Pritchard Park
Y - - - - - 200 - - 200
Pipeline Improvements
Shephard Way
Y - - - - - 50 300 - 350
Emergency Generator Head of the Bay Y - - - - - 40 130 - 170
Water Treatment
Improvements
Head of the Bay Y - - - - - 500 1,500 - 2,000
City Project Funding 725 1,250 750 75 2,600 790 1,930 - 8,120
Grant Totals - - - - - - - - -
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .725 1,250 750 75 2,600 790 1,930 - 8,120
Amounts in thousands
Project: SR 305 Olympic Drive Non-Motorized Improvements Number:00596
Location: Olympic Drive
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $777 $0 $0 $0 $0 $0 $0 $0 $777
Water Fund $175 $0 $0 $0 $0 $0 $0 $0 $175
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $872 $0 $0 $0 $0 $0 $0 $0 $872
State Grant $1,164 $0 $0 $0 $0 $0 $0 $0 $1,164
Sub-total $2,988 $0 $0 $0 $0 $0 $0 $0 $2,988
FUNDING USES (1000's)
Design/permitting
Construction $2,988
Sub-total $2,988 $0 $0 $0 $0 $0 $0 $0 $2,988
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: The Olympic Drive/Winslow Way intersection serves the ferry on and off-loading traffic. This project provides
improvements for pedestrians and cyclists along this heavily-trafficked roadway. The unique needs of multi-modal transportation
within a limited intersection area have led to a complex project planned and approved by WSDOT and FHWA. The project will
also replace an existing undersized water main in Olympic Drive and Harborview Drive with a new 8-inch line and install one new
fire hydrant.
Benefit: Non-motorized level of service improvement, safety enhancements.
Schedule: Phase 1 Design started in 2013, 2018 grant applications awarded.
Project: Rockaway Intertie Number:00815
Location: Rockaway
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $250 $0 $0 $0 $0 $0 $0 $0 $250
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $250 $0 $0 $0 $0 $0 $0 $0 $250
FUNDING USES (1000's)
Design/permitting
Construction $250
Sub-total $250 $0 $0 $0 $0 $0 $0 $0 $250
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: The Rockaway Beach Water System has a single well with declining production and limited capacity to meet peak
demands. This project will complete an intertie with the adjacent KPUD water system to provide redundant source of supply to
meet peak demands and facilitate well maintenance.
Benefit: Improve the reliability and fire protection for the Rockaway Water System.
Schedule: YR 1 : Design and construction.
Project: Wyatt Way Reconstruction Phase 1 Number:00708
Location: Madison to Lovell
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $1,184 $0 $0 $0 $0 $0 $0 $0 $1,184
Water Fund $150 $0 $0 $0 $0 $0 $0 $0 $150
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $2,516 $0 $0 $0 $0 $0 $0 $0 $2,516
Sub-total $3,850 $0 $0 $0 $0 $0 $0 $0 $3,850
FUNDING USES (1000's)
Design/permitting $3,850
Construction
Sub-total $3,850 $0 $0 $0 $0 $0 $0 $0 $3,850
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: Capacity (level of service) improvements to the intersection of Madison Avenue and Wyatt Way, including a
roundabout. Complete sidewalk and bicycle facilities on both sides of Wyatt from Madison to Lovell. Reconstruct roadway
surfacing and drainage. Additional right of way needed along frontage. Design 50% completed in 2006. State (TIB) grant funding
received in 2015.
Benefit: Relieve current and future intersection congestion and ensure mobility by implementing improvements prior to
development. Address a gap in non-motorized facilities to improve mobility and safety. Support businesses and employment in the
downtown area.
Schedule: YR1/2: design, ROW, and permitting, YR3: construction.
Project: High Zone Improvements Number:00819
Location: High School/New Brooklyn
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $150 $0 $750 $0 $0 $0 $0 $0 $900
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $150 $0 $750 $0 $0 $0 $0 $0 $900
FUNDING USES (1000's)
Design/permitting $150
Construction $750
Sub-total $150 $0 $750 $0 $0 $0 $0 $0 $900
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: Construction of a new storage tank to correct several deficiencies including service to a higher pressure zone requires
additional booster pumps and piping to supply water to this location.
Benefit: Improve water system quality and fire protection.
Schedule: YR1: design. YR2: construction.
Project: Chlorine Generator Upgrades Number:
Location: Various
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $250 $0 $0 $0 $0 $0 $0 $250
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $250 $0 $0 $0 $0 $0 $0 $250
FUNDING USES (1000's)
Design/permitting
Construction $250 $250
Sub-total $0 $250 $0 $0 $0 $0 $0 $0 $250
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: The City's chlorine generators at the Sands, Fletcher Bay, and Head of the Bay Well Site are between 9 and 15 years
old. These three 36 pounds per day (ppd) units need to be replaced.
Benefit: Improve water quality for the system.
Schedule: YR1: construction.
Project: New Storage Tank Number:
Location: New Brooklyn
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $1,000 $0 $0 $2,250 $0 $0 $0 $3,250
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $1,000 $0 $0 $2,250 $0 $0 $0 $3,250
FUNDING USES (1000's)
Design/permitting
Construction $1,000 $2,250 $3,250
Sub-total $0 $1,000 $0 $0 $2,250 $0 $0 $0 $3,250
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: Construct a new, approximately 500,000 gallon reservoir near the existing tank site near the high school.
Benefit: A new tank built at a sufficient elevation, and to the most recent design standards, will correct several deficiencies
associated with existing tanks including: significant dead storage, pressure zone deficiencies, water quality issues, and seismic
deficiencies.
Schedule: YR1: design, YR4: construction.
City of Bainbridge Island
Sewer CIP (2019 - 2024)
2019-2020 Proposed Budget
Project
Location
and/or Phase Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Gr
a
n
t
F
u
n
d
s
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
o
n
e
n
t
Wt
r
C
o
m
p
o
n
e
n
t
Sw
r
C
o
m
p
o
n
e
n
t
SS
W
M
C
o
m
p
Prior
Years 2019 2020 2021 2022 2023 2024
2025 -
2038 Total
SEWER PROJECTS - 6-YEAR CIP (1000s)
Pump Station/Force
Main Upgrade
NTW/New
Brooklyn/
Madison
- Y 700 - - - - - - - 700
Rehabilitate Pump
Station (Old
Treatment Plant)
Old
Treatment
Plant
- Y 550 - - - - - - - 550
Rehabilitate Pumps Sunday Cove - Y - 150 - - - - - - 150
Pump Station &
Force Main
Wood Ave - Y - 750 - 2,500 - - - - 3,250
Rehabilitate Pump
Station (Wing Point)
Wing Point - Y - - 100 450 - - - - 550
Rehabilitate Pump
Station (Island
Terrace)
Island
Terrace
- Y - - - 100 400 - - - 500
Install Gravity Sewers Sunday Cove - Y - - - - 200 450 - - 650
Rehabilitate Pump
Station (Lower
Lovell)
Lower Lovell - Y - - - - - 100 500 - 600
Extend WWTP Outfall Wing Point - - - - - - 200 900 - 1,100
City Total 1,250 900 100 3,050 600 750 1,400 - 8,050
Grant Total - - - - - - - - -
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1,250 900 100 3,050 600 750 1,400 - 8,050
Amounts in thousands
Project: Pump Station/Force Main Upgrade Number:00783
Location: NTW/New Brooklyn/Madison
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $700 $0 $0 $0 $0 $0 $0 $0 $700
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $700 $0 $0 $0 $0 $0 $0 $0 $700
FUNDING USES (1000's)
Design/permitting
Construction $700 $700
Sub-total $700 $0 $0 $0 $0 $0 $0 $0 $700
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: This project provides upgrades to the City’s North Town Woods sanitary sewer pump station and force main pipe in
New Brooklyn Road and Madison Avenue. These upgrades will increase the capacity of the sewer system to serve the planned
service area. The first project has been awarded to replace the force main from Madison Avenue to Three Tree Lane with a new
section of gravity main. This work will be completed by the end of 2017. A new force main from High School Road to New
Brooklyn Road is under design and will be constructed in early 2018.
Benefit: System capacity and reliability.
Schedule: YRI: Design and construction.
Project: Rehabilitate Pump Station Number:00921
Location: Old Treatment Plant
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $550 $0 $0 $0 $0 $0 $0 $0 $550
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $550 $0 $0 $0 $0 $0 $0 $0 $550
FUNDING USES (1000's)
Design/permitting
Construction $550 $550
Sub-total $550 $0 $0 $0 $0 $0 $0 $0 $550
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: This pump station was last upgraded in 1978 and the station needs upgrading of the mechanical equipment, electrical
system, wet well controls, and the emergency generator.
Benefit: Replacement of a deteriorated system with a reliable sewer collection system that can be maintained in the future.
Schedule: Design in 2019, construction in 2020.
Project: Rehabilitate Pumps Number:
Location: Sunday Cove
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $150 $0 $0 $0 $0 $0 $0 $150
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $150 $0 $0 $0 $0 $0 $0 $150
FUNDING USES (1000's)
Design/permitting
Construction $150 $150
Sub-total $0 $150 $0 $0 $0 $0 $0 $0 $150
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: Some components of the Sunday Cove pump station will reach the end of their useful life, which is assumed to be
approximately 30 years, over the next few years. In addition to replacement of the pumps and motors, this project will include the
replacement of the station’s emergency generator.
Benefit: Replacement of a deteriorated system with a reliable sewer collection system that can be maintained in the future.
Schedule: YR1: Design and construction.
Project: Pump Station and Force Main Number:
Location: Wood Ave
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $750 $0 $2,500 $0 $0 $0 $0 $3,250
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $750 $0 $2,500 $0 $0 $0 $0 $3,250
FUNDING USES (1000's)
Design/permitting $0
Construction $750 $2,500 $0 $3,250
Sub-total $0 $750 $0 $2,500 $0 $0 $0 $0 $3,250
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: The current Lower Lovell sewer beach main is severely deteriorated. It is infeasible to repair or replace the line in its
current location, so projects are needed to design and construct a new collection system for the basin in the upland area. The City
has contracted with Gray & Osborne to evaluate alternatives to facilitate replacing the West Eagle Harbor Beach Sewer Main. The
preferred alternative to address the flows in the Wood Avenue Subbasin is a Wood Lift Station and Existing Beach Main. This
alternative would continue to collect flows from the east end of the basin through the existing beach main and direct these flows to
the proposed Wood Lift Station. In addition to the existing beach main flows, the Wood Lift Station would also collect flows from
the west portion of the basin and would direct these flows to the manhole at the intersection of Wood Avenue SW and Parfitt
SW.
Benefit: Replacement of a deteriorated system with a reliable sewer collection system that can be maintained in the future.
Schedule: YR1: design/permitting, YR3: construction.
Project: Rehabilitate Pump Station Number:00820
Location: Wing Point
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024 2025-2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $100 $450 $0 $0 $0 $0 $550
SSWM Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $0 $100 $450 $0 $0 $0 $0 $550
FUNDING USES (1000's)
Design/permitting $100 $100
Construction $450 $450
Sub-total $0 $0 $100 $450 $0 $0 $0 $0 $550
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024 2025-2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: The Wing Point Pump Station has not been upgraded since its construction in 1979 and it is reaching the end of
its useful life. Besides the general condition concerns that also apply to the City’s other aging pump stations (wet well controls
should be replaced to meet current safety standards and the performance of the cathodic protection components of these
stations should be assessed), the Wing Point Pump Station has some unique upgrade requirements. First, the station access
hatch is currently under water during extreme high tides and should be extended. Second, it is recommended that an air
vacuum relief valve be installed in the force main at the discharge of the Wing Point pumps.
Benefit: Improves reliability of current sewer collection system.
Schedule: YR1: design, YR2: construction.
City of Bainbridge Island
Stormwater CIP (2019 - 2024)
2019-2020 Proposed Budget
Project Gr
a
n
t
E
l
i
g
i
b
l
e
Gr
a
n
t
A
w
a
r
d
e
d
Gr
a
n
t
F
u
n
d
s
Ge
n
e
r
a
l
C
o
m
p
St
r
t
s
C
o
m
p
o
n
e
n
t
Wt
r
C
o
m
p
o
n
e
n
t
Sw
r
C
o
m
p
o
n
e
n
t
SS
W
M
C
o
m
p
Pr
i
o
r
Y
e
a
r
s
2019 2020 2021 2022 2023 2024
2025 -
2038 Total
STORMWATER PROJECTS - 6-YEAR CIP (1000s)
Eagle Hrbr. Dr. @ McDonald Creek
Culvert
- Y 200 900 - - - - - - 1,100
Pritchard Park Outfall - Y - 100 - - - - - - 100
Yeomalt Area Drainage
Improvements
- Y 60 - 510 - - - - - 570
Wing Point Culvert - Y - - 150 - - - - - 150
Blakely Ave. Drainage
Improvements
- Y - - - 450 - - - - 450
Springbrook Creek Restoration and
Culvert Replacement
x 450
Y
- - - - 600 - - - 600
Blakely Falls Creek Culvert (Halls
Hill)
-
Y
- - - - - 150 - - 150
C40 Eagle Harbor Phase 1 - Y Y - - 100 - - 500 - - 600
City Funding 260 1,000 760 450 150 650 - - 3,270
Grant Totals - - - - 450 - - - 450
TOTALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .260 1,000 760 450 600 650 - - 3,720
Amounts in thousands
Project: Eagle Harbor Drive at McDonald Creek Number:00823
Location: 5530 Eagle Harbor Drive
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $200 $900 $0 $0 $0 $0 $0 $0 $1,100
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $200 $900 $0 $0 $0 $0 $0 $0 $1,100
FUNDING USES (1000's)
Design/permitting $200 $0 $200
Construction $900 $0 $900
Sub-total $200 $900 $0 $0 $0 $0 $0 $0 $1,100
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
Description: The existing concrete culvert is perched at its outlet and a section of pipe has dropped. Shoulder settlement is an
indicator there may be separations. The project provides for the repair of the existing concrete culvert, assuming trenchless
methods can be employed to line the culvert.
Benefit: Preservation. Avoid a more costly replacement and mitigate failure risk.
Schedule: Design and permitting in 2017 and 2018, construction in 2019.
Project: Pritchard Park Outfall Number:
Location: Pritchard Park
Project Description
Capital Funding (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
FUNDING SOURCES (1000's)
General Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Water Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
Sewer Fund $0 $0 $0 $0 $0 $0 $0 $0 $0
SSWM Fund $0 $100 $0 $0 $0 $0 $0 $0 $100
Federal Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
State Grant $0 $0 $0 $0 $0 $0 $0 $0 $0
Sub-total $0 $100 $0 $0 $0 $0 $0 $0 $100
FUNDING USES (1000's)
Design/permitting $0
Construction $100 $100
Sub-total $0 $100 $0 $0 $0 $0 $0 $0 $100
Estimated Impact on Future Operating Budget (1000's)
Prior Yrs.2019 2020 2021 2022 2023 2024
2025-
2038 Total
Operating
Debt Service
Sub-total $0 $0 $0 $0 $0 $0 $0 $0 $0
INSERT PICTURES HERE
Description: Relocate stormwater outfall for Nikkei Memorial Park as agreed in legal settlement with adjacent property owner.
Benefit: Achieve compliance with legal settlement and coordinate on-site construction with planned improvements to the memorial.
Schedule: Design in 2018, construction in 2019.